Blowers Fans Supply Verification ITP
Blowers Fans Supply Verification ITP
Blowers Fans Supply Verification ITP
* Sections A & B shall be retained in all ITPs to maintain consistency and when saving documents in
AQUA.
A) INTRODUCTION
The following procedure is intended to ensure that the quality of procured product and its associated
activities are completed by competent persons and:
1. Comply with current and applicable specified requirements (including Corporation specifications /
contract terms and conditions, national / international standards, manufacturer’s
recommendations and industry best practices.
2. Are conducted in a safe and professional manner.
3. Provide an audit trail for verification of Quality Assurance and Quality Control compliance.
This procedure is for all FAN CENTRIFUGAL & AXIAL. Competent personnel shall complete all
inspection / construction activities and record all activities on Water Corporation Document ITP-SV-M-
FAN-CENTRIFUGAL& AXIAL for each asset Inspected.
NOTE:
Please ensure that all ITP documents are completed by a competent person and that all Water
Corporation SAFETY and operational requirements are to be complied with at all times in
relation with Water Corporation and Australian Standards where applicable.
B) COMPLETED DOCUMENTS
Completed documents are to be scanned and saved as a .pdf file in the relevant AQUA folder utilising
the following naming convention:
LOCATION - DISCIPLINE - ASSET – ASSET TYPE – VENDOR NAME – DOCUMENT TYPE – P&ID
TAG – REVISION NUMBER
E.g. RavenswoodPS_M_Valve_Butterfly_Tyco_SV_1000BV3422_1
The commissioning manager shall coordinate incorporation of completed ITPs in conjunction with the
CAMEL.
Feedback on improvements to ITPs should be directed to MESB Mechanical for incorporation into future
versions.
* All Supply Verification documents shall contain the following sections (1 – 3) which capture generic asset
information
1. REFERENCE INFORMATION
INSPECTION DATA ASSET DATA
PROJECT NAME: MANUFACTURER:
ATTENDEES:
2. INSPECTION PREPARATION
OSH compliance requirements.
Obtain QA / QC documentation (review outstanding items).
Relevant Water Corporation standards.
Relevant Australian Standards.
Supporting contract documentation / approved drawings.
Provision of required test equipment.
Provision of required test reports and certificates; i.e. performance test, sound power levels
certificates,material certificates, etc.
GENERAL
Length:
Confirm dimensions are correct with
4 Checked against:
specification and relevant drawings
MF Dimensions / G.A. Dwg
Bearing grease nipple installed and
5
accessible?
Vibration dampeners installed on fan
6
mounting?
Drive coupling guard installed and painted
7
correct colour?
Discharge and suction flange drilling and
8
dimensions correct? Check against drawing
Pulley guard installed and painted correct
9
colour?
testing
Fully cured coating system should be adherent while
6 Failure force (if known):
in their service condition (Method AS/NZS 3894.9)
Assess degree of cure and hardness of coating is
acceptable (method AS 3894.4). Allow sufficient
7 drying and curing of the coating prior conducting Method used:
testing. The length of time shall be obtained from
the coating manufacture.
Checked that flange faces are clean and are free
8 from any defects resulting from corrosion or any
other cause
Visually inspect surfaces and ensure is adequately
9 Method/chemicals used:
clean and dry prior to testing
Check internal coating type and verify in accordance
with relevant specification (circle PH: Epoxy Coating
10 PA / PH / OTHER _____________
on Steel/Cast Iron or state, PA: Protective Coating
on Steel/Cast Iron or state Other)
Visually inspect condition of internal coating
appearance including uniformity, colour and free
11
from any defect that could impair performance
and/or appearance of coating.
Check external coating type and verify in accordance
with relevant specification (circle PH: Epoxy Coating
12 PA / PH / OTHER _____________
on Steel/Cast Iron or state, PA: Protective Coating
on Steel/Cast Iron or state Other )
Visually inspect condition of external coating
appearance including uniformity, colour and free
13
from any defect that could impair performance
and/or appearance of coating.
Calibrate thickness tester to standard of uniform and Method/instrument used3:
14 calibrated thickness, covering appropriate range of
film thicknesses to be measured
Visually inspect and measure4 dry film thickness (DFT) in at least 10 locations on coated surfaces. Record
15 values, ensure compliance with spec and record in table below (note that Flange Thickness is not considered
acceptable if not within minimum – maximum range)
Ensure coating fully cured prior continuity testing by
Temp/time:
16 checking datasheet for required time to full cure or
Test method:
other appropriate test method
Calibrate holiday detector (spark tester) electrode
with appropriate volt meter which has been
17 laboratory calibrated within the last 2 years to Brand/model used:
proposed voltage. Record brand and model of spark
tester to be used.
18 Carry out spark test on internal coating in Test Voltage: V
accordance to AS/NZS 3894.1 Continuity testing of
non-conductive coating – High Voltage (brush)
3
Refer to AS/NZS 3894.3 methods for Determination of Dry Film Thickness
4
Method AS 3894.3 refers Determination of Dry Film Thickness
Print Date: 26/10/2018 Warning: Document Uncontrolled When Printed Page 4 of 7
AQUADoc No: 3481451 Document Custodian: Team Leader – Mechanical
Version Date: 30/12/2015 Next Review Date: 30/12/2017
ITP-SV-M-FAN-
SUPPLY VERIFICATION CENTRIFUGAL & AXIAL
FAN CENTRIFUGAL & AXIAL
INSPECTION & TEST PROCEDURE
Coating Complies
Internal (micrometers): External (micrometers): Flange (micrometers ):
Thickness: with Spec?
Specified min N/A
Specified max N/A
Measured 1
Measured 2
Measured 3
Measured 4
Measured 5
Measured 6
Measured 7
Measured 8
Measured 9
Measured 10
Average
Note any comment or variation to test procedure that will assist in interpretation of results:
Refer to AS/NZS 1627 series for Metal Finishing – Preparation and Pretreatment of Surfaces
2
Refer to AS/NZS 3894.7 for practical procedure for Determination of Surface Temperature of metal surfaced (pre-coating)
3
Refer to AS/NZS 3894.3 methods for Determination of Dry Film Thickness
4
Method AS 3894.3 refers Determination of Dry Film Thickness
TARGET
6. REMARKS / REMEDIAL / FOLLOW UP ACTIONS ACTION BY STATUS
DATE
7. SIGNOFFS
NAME (PRINT) COMPANY / ROLE SIGNATURE DATE
9. SIGNOFFS
NAME (PRINT) COMPANY / ROLE SIGNATURE DATE