Denah Rencana Pekerjaan Hydrant Umum: Kotak Hydrant Detail Siamese Detail Fire Hydrant Pillar
Denah Rencana Pekerjaan Hydrant Umum: Kotak Hydrant Detail Siamese Detail Fire Hydrant Pillar
Denah Rencana Pekerjaan Hydrant Umum: Kotak Hydrant Detail Siamese Detail Fire Hydrant Pillar
JL. MUNIR
STA
+020
0+040 JL. BUMIJO No.5 YOGYAKARTA
LOKASI PEKERJAAN DRAINASE RT.03
P=65m L=0.4m T = 0.4m KEGIATAN
STA PENINGKATAN KUALITAS PRASARANA, SARANA DAN
0+020 UTILITAS (PSU) KAWASAN KUMUH
SD NEGERI RUMAH
SERANGAN RW 1 PARKIR
BUS LOKASI
JL. MUNIR
NGABEAN
STA RT.03 RW.01. KEL. NOTOPRAJAN
0+000 KECAMATAN NGAMPILAN,
LOKASI PEKERJAAN HYDRANT UMUM RT.03
KOTA YOGYAKARTA
DIPERIKSA
PEJABAT PENERIMA HASIL PEKERJAAN
DENAH RENCANA PEKERJAAN HYDRANT UMUM (PPHP)
0.80
Fire Hose Box
(1000x800x180 mm)
FIRE HOSE
2.5" x 30 m
Ketua:
Ig. SUDARNO, ST, MT
Fire Hydrant Pillar NIP 19631211 199101 1 003
Ø In 4" x 2.5" x 2.5"
1.00 MENGETAHUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
Siamise Connection
(PPTK)
Ø In 4" Out 2.5"
GAMBAR SKALA