Nothing Special   »   [go: up one dir, main page]

Taking Off La Contoh

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 9

PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (U

BLOCK: DEWAN SERBAGUNA


ELEMEN: UPPER GROUND FLOOR

DIMENSION QUANTITY
ITEM L W NO CONC F/W EDGE
(m2) (m)
(LxWxD/HxNO) 150mm high

L8-L9/LH-LJ & R8-


5.10 4.00 2 40.80 26.20
R9/RH-RG

LL-LK/L9-L8 & 5.18 5.10 2 52.84 30.76


RK-RJ/R8-R9

LJ-LK/L9a-L8 & R8- 11.60 13.80


R8a/ RJ-RH 4.00 1.45 2

3a-6a&7a-10a /S-T 9.35 6.40 2 119.68 44.30

3a-3b&10a-10b/Ra-
3.20 3.20 2 20.48 19.20
Sa

RE-RJ/R6-R8 & LF-


A 1.45 1.10 2 3.19 7.30
LK&L6-L8
B 10.90 2.90 2 63.22 33.40
C 4.00 3.30 2 26.40 21.20

Sa-T/6a-7a 8.60 2.00 1 17.20 21.20

1-2&12-13 / L-Na A 15.00 3.00 2 90.00 42.00


B 0.50 3.00 2 3.00 13.00

4-7& 7-10 & A-Ga 12.75 8.85 2 225.68 60.90

10-10a/ Ca-Ga 8.50 4.60 1 39.10 26.20

10a-11a/ Ca-Ga 4.25 4.00 1 17.00 16.50

2a-4/C-Ga A 6.45 5.20 1 33.54 23.30


B 6.90 4.30 1 29.67 22.40

RB-RD/R3-R6 16.20 7.20 1 116.64 46.80

R4-R6/RC-RD A 2.60 0.90 1 2.34 7.00


B 3.50 3.00 1 10.50 13.00

R6-R7/RA-RE 7.25 7.20 1 52.20 28.90

R4-R6/R-RB 7.50 5.80 1 43.50 26.60


7.25 3.00 1 21.75 20.50

L3-L9/LC-LF 18.02 3.90 1 70.28 43.84

GROUND FLOOR
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (U
BLOCK: DEWAN SERBAGUNA
ELEMEN: UPPER GROUND FLOOR

L5a-L9/LF-LG A 1.90 1.90 1 3.61 7.60


B 3.60 3.00 1 10.80 13.20

L5-L9/LA-LC 7.87 10.00 1 78.70 35.74

1-7&7-12/Ga-Ra A 16.70 8.70 2 290.58 68.20


B 22.60 14.00 2 632.80 101.20
C 20.70 7.30 2 302.22 70.60
D 16.30 5.20 2 169.52 53.40

TOTAL 2,598.83 958.24


M3 389.82435

GROUND FLOOR
NYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA)

GROUND FLOOR
NYIAPKAN SEBUAH DEWAN SERBAGUNA (UNIVERSITI UTARA MALAYSIA)

#REF!

GROUND FLOOR
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UUM)
BLOCK: DEWAN SERBAGUNA
ELEMEN: CEILING FINISHES

DIMENSION QUANTITY
ITEM L W NO
(m2)

20MM THK CEMENT PASTERING WITH 4MM THK SKIMCOAT FINISH TO SOFFIT, BEAM AND ETC

LOWER GROUND FLR


A-B/4-10 18.46 3.00 1 55.38

C-K/0-3A & C- 255.20


K/10A-14 16.00 15.95 1

3A-10A/C-K 28.46 15.95 1 453.94

K-L/0-1 A 5.69 5.54 0.5 15.76


B 5.08 1.08 1 5.49

K-K1/13-14 4.83 4.92 0.5 11.88

K-P/1-13 51.00 22.67 1 1,156.17

P-S1/1-3A & P-
12.46 12.85 1 160.11
S1/10A-13

P-S1/3A-10A 24.62 12.85 1 316.37

LL-LL1/L7-L7A & 5.34


RK-RJ1/R7A-R8 2.31 2.31 1

UTILITI 1 & 2 5.18 5.10 2 52.84

DDT SC2 7.08 1.20 -1 (8.50)

UPPER GROUND FLOOR


A0-C/6A-7A 5.08 2.00 1 10.16

D-E/6-8 12.04 1.54 1 18.54

D-F/4-6 & D-F/8-10 3.32 3.31 2 21.98

C-F/3A-4 & C-F/10-


25.73
10A 4.92 5.23 1

L1-L7/LC-LF 18.64 7.20 1 134.21

L7-L9/LD-LF 5.18 4.50 1 23.29

L5-L6/LA1-LC 7.69 3.00 1 23.07

K1-K2/0-2 3.54 3.69 0.5 6.53

ceiling 20MM
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UUM)
BLOCK: DEWAN SERBAGUNA
ELEMEN: CEILING FINISHES

K2-L/0-2 3.31 0.77 1 2.55

R1-R6/RB-RD 22.50 7.20 1 162.00

K2-L/12-13 4.38 3.00 0.5 6.56

K1-L/13-14 4.83 5.38 0.5 13.00

K-K1/14-14A 1.54 1.23 0.5 0.95

K1-L/14A-15 5.38 2.77 1 14.90

L-P/1-2 & L-P/12-13 15.38 3.00 2 92.28

LF-LK/L7-L8 & RE-


92.76
RJ/R7-R8 15.46 3.00 2

TOTAL 3,128.48

ceiling 20MM
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UUM)
BLOCK: DEWAN SERBAGUNA
ELEMEN: CEILING FINISHES

DIMENSION QUANTITY
ITEM L W NO
(m2)

600MM X 600MM X8MM THK CAALCIUM SILICATE CEILING BOARD


WITH APPROVED SUSPENDED CEILING SYSTEM
WITH ADJUSTABLE ROD & CLIP HANGER

UPPER GROUND FLR


CHANGING (M) & 23.26
CHANGING (F) A 3.23 3.60 2
B 5.58 4.77 2 53.23

TOILET(M3) &
62.82
TOILET(F3) 8.73 7.20 1

OKU2 & JANITOR 2 5.18 2.70 1 13.97

TOILET(M2) 7.31 4.50 1 32.88

TOILET(F2) A 7.38 3.25 1 23.99


B 4.77 4.62 0.5 11.02
E 1.54 1.54 0.5 1.19
F 1.23 1.38 1 1.70

JANITOR 2.00 1.33 1 2.65


OKU1 2.62 2.66 1 6.96

TOILET (M1) & 40.80


TOILET (F1) 5.10 4.00 2

FIRST FLR

TOILET (M4) &


40.80
TOILET (F4) 5.10 4.00 2

TOTAL 315.26

DIMENSION QUANTITY
ITEM L W NO
(m2)

100MM THK. PLASTERBOARD WITH APPROVED SUSPENED CEILING SYSYEM


WITH ADJUSTABLE ROD & CLIP HANGER C/W SELECTED CORNICE ALL ROUND

UPPER GROUND FLR

ceiling 20MM
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UUM)
BLOCK: DEWAN SERBAGUNA
ELEMEN: CEILING FINISHES

SEMINAR HALL 1
208.25
&2 A 15.38 6.77 2
B 15.38 8.00 1 123.04
C 10.77 10.62 1 114.38

L1-P/3A-10A 16.62 6.15 1 102.21

VIP ROMM 1 & 2 &


SECURITY & 7.23 5.18 2 74.90
UTILITY A

P-Q/6A-7A 6.01 1.54 1 9.25

FIRST FLR
ACTIVITY/RECREA
208.25
TION ROOM 1 & 2 A 15.38 6.77 2
B 15.38 8.00 1 123.04
C 10.77 10.62 1 114.38

N1-P/3A-10A 18.77 5.23 1 98.17

P-Q/6A-7A 6.01 1.54 1 9.25

N-N1/6A-7A 4.46 1.08 1 4.82

L7-L8/LH-LK & R7-


24.00
R8/RG-RJ 4.00 3.00 2

L8-L10/LJ-LK & R8-


57.60
R10/RH-RJ 7.20 4.00 2

TOTAL 1,271.52

ceiling 20MM
PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH DEWAN SERBAGUNA (UUM)
BLOCK: DEWAN SERBAGUNA
ELEMEN: CEILING FINISHES

DIMENSION QUANTITY
ITEM L W NO
(m2)

20MM THK CEMENT PASTERING WITH 4MM THK SKIMCOAT FINISH TO SOFFIT, BEAM AND ETC

LOWER GROUND FLR


-

-
-

TOTAL -

ceiling

You might also like