BAK1010 Jabori HHP: Project Code Project Title
BAK1010 Jabori HHP: Project Code Project Title
BAK1010 Jabori HHP: Project Code Project Title
Design Code:
Input Data:
W1 W1
H2
H3
H
W2
H1
W
Clear cover CC 50
Load calculations:
Area of concrete Ac 2.40
Stirrup bar f 12
3. Design of slab
Weight of concrete Ww 21.58
Weight of water Wc 7.08
Factored load Pu 43.03
Applied Moment due to water Ma 53.4
Assume Main Reinforcement f 13
Distribution bar f 10
Spacing main Bars Sm 150
Spacing distribution Bars Sd 400
Effective Depth d 243.5
Area of Main Steel provided As 884.88
Area of Distribution Steel provided As' 785.40
Minimum reinforcement Asmin 540.00
Depth of Compression (As*fy/0.85fc'b) a 20.62
Bending moment capacity(φ*As*fy*(d-a/2)) MR 76.9
01
NK
AUH
31/12/14
mm
mm
mm
mm
mm
mm
mm
KN/m3
KN/m3
N/mm2
N/mm2
m
m
mm
m2
m2
KN/m
KN/m
KN/m
KN-m
KN-m
02
NK
AUH
31/12/14
mm
mm
mm
mm2
mm
mm2
mm
KN-m
OK
mm
mm
mm
mm2
mm
mm2
mm
KN-m
OK
KN/m
KN/m
KN-m
mm
mm
mm
mm
mm
mm2
mm2
mm2
mm
KN-m
OK
KN/m
KN/m
KN/m
KN-m
mm
mm
mm
mm
mm
mm2
mm2
mm2
mm
KN-m
OK
METHOD-1
Φ 35 degrees
Kh 0.32
Kv 0.54
Ψ 34.8 degrees
δ 23.5 degrees
1
0.82
0.53
1.07
1.14
KAE 2.02
METHOD-1
Φ 35 degrees
Kh 0.3
Kv 0
θ 16.7 degrees
δ 8.35 degrees
i 0 degrees
β 0 degrees
0.9
0.96
1
0.91
0.51
3.81
KAE 3.96