Ashgal Lighting Specification
Ashgal Lighting Specification
Ashgal Lighting Specification
AL
AM
IR
ST
RE
ET
E ET
STR
A AB
ALW
C-RING ROAD
AD
RO
AL MUNTAZAH ST.
A
W
AL
L D
SA R OA
MA
I N G
D-R
TA
D-RING ROAD
RS
ET
TR
E
TR
EE
NA
L S
T
E-
J
OU
MA
RI
L
ME
HA
NG
ST
AD
SA
RO
RE
RO
IM
A
ET
AD
W
EE
L
SA
R
W
AL
RO
HO
MA
AD
LE
OAD
E-RING R
TA
SA
LE
RS
M
TR
E
AR
RE
EE
KE
ST
OAD
T
T
AH R
ST
AZ - RING
R
T F
EE
UN
T
AL
M
AL
EA
WA
ST
KRA
IN
DU
HB
ST
YPA
RI
AL
S
AR
SE
EA
XTN
ST
RE
ET
LOCALITY PLAN
2nd Floor , Al Faisal Tower 2, West Bay P.O. Box : 23103, Doha, Qatar
P.O. Box : 26666, Doha, Qatar Tel.: (+974) 4435 1612
Tel.: (+974) 44950048 Fax.: (+974) 4435 2320
Fax.: (+974) 44834791
EXW-P008-0000-SE-PBR-DG-94001-001
1 2 3 4 5 6 7 8 9 10 11 12
DESIGN DRAWINGS
EXW-P008-0000-SE-PBR-DG-94126-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BRIDGE SOFFIT CEILING DETAILS
EXW-P008-0000-SE-PBR-DG-94128-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS TOWER & BRIDGE CEILING DETAILS
EXW-P008-0000-SE-PBR-DG-94131-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 1
EXW-P008-0000-SE-PBR-DG-94132-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 2
D EXW-P008-0000-SE-PBR-DG-94133-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 3 D
EXW-P008-0000-SE-PBR-DG-94134-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 4
EXW-P008-0000-SE-PBR-DG-94401-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 1
EXW-P008-0000-SE-PBR-DG-94402-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 2
EXW-P008-0000-SE-PBR-DG-94403-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 3
Project Management Consultant : Design Consultant :
EXW-P008-0000-SE-PBR-DG-94406-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE REAR ARCHT'L PANEL SUPPORT
SHE BOX
EXW-P008-0000-SE-PBR-DG-94408-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE FRONT ARCHT'L PANEL SUPPORT
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION
F
EXW-P008-0000-SE-PBR-DG-94411-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR STEELWORK DETAILS - SHEET 1 IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK F
EXW-P008-0000-SE-PBR-DG-94412-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR STEELWORK DETAILS - SHEET 2 DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS Supervision Consultant : Construction Contractor :
EXW-P008-0000-SE-PBR-DG-94413-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR CONCRETE DETAILS - SHEET 1 (REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD REGISTER IN THE DESIGN
EXW-P008-0000-SE-PBR-DG-94414-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR CONCRETE DETAILS - SHEET 2 REPORT).
EXW-P008-0000-SE-PBR-DG-94421-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR REINFORCEMENT
EXW-P008-0000-SE-PBR-DG-94431-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR MISCELLANEOUS DETAILS CONSTRUCTION
A A
•
•
•
•
• NOTES:
•
B • B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
• CONSTRUCTION
•
• Drawing Title:
•
•
PROJECT WIDE
•
STRUCTURAL - PED. BRIDGES
•
GENERAL NOTES AND LEGENDS
•
H • Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 NTS
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL IMAGES &
FINISHES SCHEDULE
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CONCRETE FLOOR FINISHES
H Drawn:
W. IQBAL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
MAY 2015 1:50 on A1
Drawing Number: Revision:
A A
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
ELEVATIONS
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
ELEVATIONS & TYPICAL SECTIONS
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
BALUSTRADE DETAILS - SHEET 1
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
BALUSTRADE DETAILS - SHEET 2
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MARCH 2015 1:10 on A1
Drawing Number: Revision:
A A
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 1
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 2
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
NOTES:
B B
C C
LEGEND:
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 3
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 4
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 5
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 6
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
LIFT SHAFT DETAILS
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
STAIR LANDING
H Drawn:
M LONG
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
BRIDGE SOFFIT CEILING DETAILS
H Drawn:
M. LONG
Checked:
A.GALLAGHER H
Designed: Approved:
R. CHUNG N.BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
TOWER & BRIDGE CEILING DETAILS
H Drawn:
M. LONG
Checked:
A.GALLAGHER H
Designed: Approved:
R. CHUNG N.BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
OPEN CLADDING LAYOUT - SHT 1
H Drawn:
G STONE
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
OPEN CLADDING LAYOUT - SHT 2
H Drawn:
G STONE
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
*
**
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
E-RING ROAD
** NORTH / SOUTH LINK (P008-C2)
G G
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
OPEN CLADDING LAYOUT - SHT 3
H Drawn:
G STONE
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MARCH 2015 1:25 on A1
Drawing Number: Revision:
A A
** ** **
*
NOTES:
B B
*
*
*
C LEGEND: C
*
*
**
*
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
OPEN CLADDING LAYOUT - SHT 4
H Drawn:
G STONE
Checked:
A GALLAGHER H
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MARCH 2015 1:25 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
CONSTRUCTION
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY Project Name:
CONTRACTOR PRIOR TO CONSTRUCTION WORKS
COMMENCING.
CONSTRUCTION AND UPGRADE OF
• SELF- WEIGHT OF TRUSS SEGMENTS TO BE E-RING ROAD
CONFIRMED BY THE FABRICATION YARD WITH
APPROVED LIFTING DEVICES. TRANSPORTATION OF NORTH / SOUTH LINK (P008-C2)
G TRUSS SEGMENTS AND ERECTION METHODOLOGY TO G
BE PROPOSED BY CONTRACTOR.
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND
THE TEMPORARY PROPS FOR CONSTRUCTION. Project Code:
• ERECTION SEQUENCE AS PROVIDED ON THIS DRAWING IA 14/15 C 075 ST
IS INDICATIVE ONLY. DETAILED SAFE WORK METHOD Status:
STATEMENTS ARE TO BE DEVELOPED BY THE CONSTRUCTION
CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR
Drawing Title:
APPROVAL PRIOR TO WORKS COMMENCING ON SITE.
MAINTENANCE/CLEANING
• STRUCTURAL INSPECTIONS TO FORM PART OF
STRUCTURAL - PED. BRIDGES
MAINTENANCE REGIME AT REGULAR INTERVALS. CONSTRUCTION SEQUENCE
USE TWO SPAN BRIDGE
H • NONE Drawn:
W.IQBAL
Checked:
A GALLAGHER H
Designed: Approved:
DECOMMISSIONING/DEMOLITION M.KANJULA N BROWNLEE
Date: Scale:
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE MAY 2015 1:200 on A1
ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
CONSTRUCTION
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY Project Name:
CONTRACTOR PRIOR TO CONSTRUCTION WORKS
COMMENCING. CONSTRUCTION AND UPGRADE OF
• SELF- WEIGHT OF TRUSS SEGMENTS TO BE
CONFIRMED BY THE FABRICATION YARD WITH E-RING ROAD
APPROVED LIFTING DEVICES. TRANSPORTATION OF
TRUSS SEGMENTS AND ERECTION METHODOLOGY TO
NORTH / SOUTH LINK (P008-C2)
G BE PROPOSED BY CONTRACTOR. G
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND
THE TEMPORARY PROPS FOR CONSTRUCTION. Project Code:
• ERECTION SEQUENCE AS PROVIDED ON THIS DRAWING
IS INDICATIVE ONLY. DETAILED SAFE WORK METHOD
IA 14/15 C 075 ST
STATEMENTS ARE TO BE DEVELOPED BY THE Status:
CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR
CONSTRUCTION
APPROVAL PRIOR TO WORKS COMMENCING ON SITE. Drawing Title:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS/LIFT SHAFT 1 & 3
FOOTING DETAILS
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS/LIFT SHAFT 1 & 3
CONCRETE DETAILS
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS/LIFT SHAFT 1 & 3
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS/LIFT SHAFT 1 & 3
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIER 2
PILECAP AND PIER CONCRETE
H Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIER 2 PILECAP
REINFORCEMENT
H Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:25 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
REINFORCEMENT
H Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
STEELWORK DETAILS - SHEET 1
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
STEELWORK DETAILS - SHEET 2
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:20 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
STEELWORK DETAILS - SHEET 3
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:10 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
*
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
REAR ARCHT'L PANEL SUPPORT
H Drawn:
F. PALEAN
Checked:
A.GALLAGHER H
Designed: Approved:
M. WINDING N.BROWNLEE
Date: Scale:
FEBRUARY 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
FRONT ARCHT'L PANEL SUPPORT
H Drawn:
M. LONG
Checked:
A.GALLAGHER H
Designed: Approved:
R. CHUNG N.BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR STEELWORK
DETAILS - SHEET 1
H Drawn:
G STONE
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR STEELWORK
DETAILS - SHEET 2
H Drawn:
G STONE
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:20 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR CONCRETE
DETAILS - SHEET 1
H Drawn:
G STONE
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR CONCRETE
DETAILS - SHEET 2
H Drawn:
G STONE
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:10 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR
REINFORCEMENT
H Drawn:
R. TORRES
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
DECEMBER 2014 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR
MISCELLANEOUS DETAILS
H Drawn:
R. TORRES
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 1
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 1:25 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 2
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 3
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 4
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 5
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H
NOTES:
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ROOF
DETAILS - SHEET 1
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:25 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ROOF
DETAILS - SHEET 2
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
DRAINAGE
DETAILS
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:10 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
DECK
REINFORCEMENT DETAILS
H Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
PROJECT WIDE
STRUCTURAL - PED. BRIDGES
EXPANSION JOINT
LAYOUT & DETAILS
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 AS SHOWN
Drawing Number: Revision:
AL
AM
IR
ST
RE
ET
T
EE
TR
BS
WAA
AL
A D C-RING ROAD
RO
A
AL MUNTAZAH ST.
W
AL
AL
S D
ROA
MA
IN G
D-R
T
D-RING ROAD
AR
ST
ET
RE
RE
ST
NA
E
UL
T
E-
ME
JMA
LO
RI
HA
SA
NG
ST
AD
IM
RO
RE
RO
EE
A
ET
AD
W
R
L
SA
RO
W
AL
AD
HO
MA
LE
OAD
ERR-PB-01 E-RING R
SA
TA
LE
R
M
ST
T
AR
RE
RE
KE
ST
ET
T
H OAD
ST
ZA GR
-RIN
RE
AL
T A F
ET
UN
WA
M
AL
KRA
HB
YPA
SS
EXT
N
LOCALITY PLAN
2nd Floor , Al Faisal Tower 2, West Bay P.O. Box : 23103, Doha, Qatar
P.O. Box : 26666, Doha, Qatar Tel.: (+974) 4435 1612
Tel.: (+974) 44950048 Fax.: (+974) 4435 2320
Fax.: (+974) 44834791
EXW-P008-0002-SE-PBR-DG-40001-001
1 2 3 4 5 6 7 8 9 10 11 12
EXW-P008-0002-SE-PBR-DG-40001-001 STRUCTURAL COVER SHEET EXW-P008-0000-SE-PBR-DG-94001-001 STRUCTURAL - PED. BRIDGES COVER SHEET
EXW-P008-0002-SE-PBR-DG-40002-001 STRUCTURAL DRAWING LIST EXW-P008-0000-SE-PBR-DG-94002-001 STRUCTURAL - PED. BRIDGES DRAWING LIST
EXW-P008-0000-SE-PBR-DG-94004-001 STRUCTURAL - PED. BRIDGES GENERAL NOTES AND LEGENDS
EXW-P008-0002-SE-PBR-DG-40111-001 STRUCTURAL GENERAL ARRANGEMENT PLAN AND ELEVATION KEY PLAN
EXW-P008-0002-SE-PBR-DG-40112-001 STRUCTURAL GENERAL ARRANGEMENT SECTIONS - SHEET 1 EXW-P008-0000-SE-PBR-DG-94006-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL IMAGES & FINISHES SCHEDULE NOTES:
B
EXW-P008-0002-SE-PBR-DG-40113-001 STRUCTURAL GENERAL ARRANGEMENT SECTIONS - SHEET 2 EXW-P008-0000-SE-PBR-DG-94007-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CONCRETE FLOOR FINISHES B
EXW-P008-0002-SE-PBR-DG-40114-001 STRUCTURAL GENERAL ARRANGEMENT SECTIONS - SHEET 3
EXW-P008-0002-SE-PBR-DG-40115-001 STRUCTURAL GENERAL ARRANGEMENT SECTIONS - SHEET 4 EXW-P008-0000-SE-PBR-DG-94101-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS ELEVATIONS
EXW-P008-0002-SE-PBR-DG-40151-001 STRUCTURAL CONSTRUCTION SEQUENCE EXW-P008-0000-SE-PBR-DG-94102-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS ELEVATIONS & TYPICAL SECTIONS
EXW-P008-0002-SE-PBR-DG-40201-001 STRUCTURAL FOUNDATION LAYOUT EXW-P008-0000-SE-PBR-DG-94106-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BALUSTRADE DETAILS - SHEET 1
EXW-P008-0002-SE-PBR-DG-40211-001 STRUCTURAL PIERS 1, 2 & 3 LEVELS DATA EXW-P008-0000-SE-PBR-DG-94107-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BALUSTRADE DETAILS - SHEET 2
EXW-P008-0002-SE-PBR-DG-40401-001 STRUCTURAL PIER 1 TOWER STEELWORK STEELWORK DETAILS EXW-P008-0000-SE-PBR-DG-94111-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 1
EXW-P008-0002-SE-PBR-DG-40402-001 STRUCTURAL PIER 3 TOWER STEELWORK STEELWORK DETAILS EXW-P008-0000-SE-PBR-DG-94112-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 2
EXW-P008-0002-SE-PBR-DG-40411-001 STRUCTURAL PIER 1 STAIR LAYOUT EXW-P008-0000-SE-PBR-DG-94113-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 3
EXW-P008-0002-SE-PBR-DG-40412-001 STRUCTURAL PIER 3 STAIR LAYOUT EXW-P008-0000-SE-PBR-DG-94114-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 4
C C
EXW-P008-0002-SE-PBR-DG-40413-001 STRUCTURAL PIER 1 STAIR CONCRETE SECTIONS EXW-P008-0000-SE-PBR-DG-94115-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 5
EXW-P008-0002-SE-PBR-DG-40414-001 STRUCTURAL PIER 3 STAIR CONCRETE SECTIONS EXW-P008-0000-SE-PBR-DG-94116-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 6
EXW-P008-0002-SE-PBR-DG-40415-001 STRUCTURAL PIER 1 STAIR CONCRETE DETAILS EXW-P008-0000-SE-PBR-DG-94121-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS LIFT SHAFT DETAILS
EXW-P008-0002-SE-PBR-DG-40416-001 STRUCTURAL PIER 1 STAIR REINFORCEMENT DETAILS EXW-P008-0000-SE-PBR-DG-94122-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS STAIR LANDING
EXW-P008-0002-SE-PBR-DG-40501-001 STRUCTURAL BEARINGS LAYOUT EXW-P008-0000-SE-PBR-DG-94126-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BRIDGE SOFFIT CEILING DETAILS
EXW-P008-0002-SE-PBR-DG-40601-001 STRUCTURAL BRIDGE STRUCTURE STEELWORK LAYOUT EXW-P008-0000-SE-PBR-DG-94128-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS TOWER & BRIDGE CEILING DETAILS
EXW-P008-0002-SE-PBR-DG-40602-001 STRUCTURAL BRIDGE STRUCTURE STEELWORK TRUSS ARRANGEMENT
EXW-P008-0002-SE-PBR-DG-40641-001 STRUCTURAL DECK CONCRETE LAYOUT EXW-P008-0000-SE-PBR-DG-94131-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 1
EXW-P008-0002-SE-PBR-DG-40661-001 STRUCTURAL ROOF LAYOUT EXW-P008-0000-SE-PBR-DG-94132-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 2
D EXW-P008-0000-SE-PBR-DG-94133-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 3 D
EXW-P008-0002-SE-PBR-DG-40801-001 STRUCTURAL ARCHITECTURAL CLADDING PANEL TYPE TA5 EXW-P008-0000-SE-PBR-DG-94134-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 4
X2-EXW-P008-0002-S-PBR-PBRG-DE-40 EXW-P008-0000-SE-PBR-DG-94201-001 STRUCTURAL - PED. BRIDGES PIERS/LIFT SHAFT 1 & 3 FOOTING DETAILS
X2-EXW-P008-0002-S-PBR-PBRG-DE-40C EXW-P008-0000-SE-PBR-DG-94211-001 STRUCTURAL - PED. BRIDGES PIERS/LIFT SHAFT 1 & 3 CONCRETE DETAILS
X2-EXW-P008-0002-S-PBR-PBRG-DE-40S EXW-P008-0000-SE-PBR-DG-94231-001 STRUCTURAL - PED. BRIDGES PIERS/LIFT SHAFT 1 & 3 FOOTING REINFORCEMENT DETAILS
EXW-P008-0000-SE-PBR-DG-94232-001 STRUCTURAL - PED. BRIDGES PIER/LIFT SHAFT 1 & 3 REINFORCEMENT DETAILS Rev Date Revision Details Drawn Chkd Appd
X3-EXW-P008-0002-S-PBR-PBRG-DE-40 EXW-P008-0000-SE-PBR-DG-94241-001 STRUCTURAL - PED. BRIDGES PIER 2 PILECAP AND PIER CONCRETE
E EXW-P008-0000-SE-PBR-DG-94251-001 STRUCTURAL - PED. BRIDGES PIER 2 - PILECAP REINFORCEMENT E
EXW-P008-0000-SE-PBR-DG-94252-001 STRUCTURAL - PED. BRIDGES PIER 2 - PIER REINFORCEMENT
EXW-P008-0000-SE-PBR-DG-94401-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 1
EXW-P008-0000-SE-PBR-DG-94402-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 2
EXW-P008-0000-SE-PBR-DG-94403-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 3
SHE BOX Project Management Consultant : Design Consultant :
EXW-P008-0000-SE-PBR-DG-94406-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE REAR ARCHT'L PANEL SUPPORT
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION EXW-P008-0000-SE-PBR-DG-94408-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE FRONT ARCHT'L PANEL SUPPORT
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK
F
DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS EXW-P008-0000-SE-PBR-DG-94411-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR STEELWORK DETAILS - SHEET 1 F
(REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD REGISTER IN THE DESIGN EXW-P008-0000-SE-PBR-DG-94412-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR STEELWORK DETAILS - SHEET 2 Supervision Consultant : Construction Contractor :
REPORT). EXW-P008-0000-SE-PBR-DG-94413-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR CONCRETE DETAILS - SHEET 1
CONSTRUCTION EXW-P008-0000-SE-PBR-DG-94414-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR CONCRETE DETAILS - SHEET 2
EXW-P008-0000-SE-PBR-DG-94421-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR REINFORCEMENT
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO EXW-P008-0000-SE-PBR-DG-94431-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR MISCELLANEOUS DETAILS
CONSTRUCTION WORKS COMMENCING.
• SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION EXW-P008-0000-SE-PBR-DG-94601-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 1 Project Name:
YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS EXW-P008-0000-SE-PBR-DG-94602-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 2 CONSTRUCTION AND UPGRADE OF
SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR. EXW-P008-0000-SE-PBR-DG-94603-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 3
• REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION EXW-P008-0000-SE-PBR-DG-94604-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 4
E-RING ROAD
SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK EXW-P008-0000-SE-PBR-DG-94605-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 5 NORTH / SOUTH LINK (P008-C2)
G ERECTION. EXW-P008-0000-SE-PBR-DG-94621-001 STRUCTURAL - PED. BRIDGES ROOF DETAILS - SHEET 1
G
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS EXW-P008-0000-SE-PBR-DG-94622-001 STRUCTURAL - PED. BRIDGES ROOF DETAILS - SHEET 2 Project Code:
FOR CONSTRUCTION. IA 14/15 C 075 ST
EXW-P008-0000-SE-PBR-DG-94631-001 STRUCTURAL - PED. BRIDGES DRAINAGE DETAILS
MAINTENANCE/CLEANING EXW-P008-0000-SE-PBR-DG-94641-001 STRUCTURAL - PED. BRIDGES DECK REINFORCEMENT DETAILS Status:
CONSTRUCTION
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT Drawing Title:
EXW-P008-0000-SE-PBR-DG-94701-001 STRUCTURAL - PED. BRIDGES EXPANSION JOINT LAYOUT & DETAILS
REGULAR INTERVALS. PEDESTRIAN BRIDGE ERR-PB-01
USE STRUCTURAL
• NONE DRAWING LIST
DECOMMISSIONING/DEMOLITION
H Drawn: Checked: H
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE J. CARTAGO A. GALLAGHER
Designed: Approved:
CONSTRUCTION ERECTION. A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 NTS
Drawing Number: Revision:
A A
KEY PLAN
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
A A
KEY PLAN
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
AS SHOWN
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:
A A
KEY PLAN
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
1:50 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:
A A
KEY PLAN
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
1:50 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:
A A
KEY PLAN
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
DECEMBER 2014
Scale:
1:50 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
CONSTRUCTION
Project Name:
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY
CONTRACTOR PRIOR TO CONSTRUCTION WORKS CONSTRUCTION AND UPGRADE OF
COMMENCING.
• SELF- WEIGHT OF TRUSS SEGMENTS TO BE E-RING ROAD
CONFIRMED BY THE FABRICATION YARD WITH
APPROVED LIFTING DEVICES. TRANSPORTATION OF NORTH / SOUTH LINK (P008-C2)
G TRUSS SEGMENTS AND ERECTION METHODOLOGY TO G
BE PROPOSED BY CONTRACTOR.
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND
Project Code:
THE TEMPORARY PROPS FOR CONSTRUCTION.
• ERECTION SEQUENCE AS PROVIDED ON THIS DRAWING
IA 14/15 C 075 ST
IS INDICATIVE ONLY. DETAILED SAFE WORK METHOD Status:
STATEMENTS ARE TO BE DEVELOPED BY THE
CONSTRUCTION
CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR Drawing Title:
APPROVAL PRIOR TO WORKS COMMENCING ON SITE.
MAINTENANCE/CLEANING
STRUCTURAL
• STRUCTURAL INSPECTIONS TO FORM PART OF
MAINTENANCE REGIME AT REGULAR INTERVALS. CONSTRUCTION SEQUENCE
USE
H Drawn: Checked: H
• NONE W.IQBAL A GALLAGHER
Designed: Approved:
DECOMMISSIONING/DEMOLITION M.KANJULA N BROWNLEE
Date: Scale:
MAY 2015 1:250 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE
ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
H Drawn:
J. CARTAGO
Checked:
A. GALLAGHER H
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
MAY 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
MAY 2015 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 1:50 on A1
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
JANUARY 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
JANUARY 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
H Drawn:
J. CARTAGO
Checked:
A. GALLAGHER H
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
1:200 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:
A A
NOTES:
B B
C C
LEGEND:
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
1:200 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:
A A
NOTES:
B B
C LEGEND: C
D D
E E
F F
Supervision Consultant : Construction Contractor :
Project Name:
Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:
Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision: