Nothing Special   »   [go: up one dir, main page]

Ashgal Lighting Specification

Download as pdf or txt
Download as pdf or txt
You are on page 1of 77

QATAR EXPRESSWAYS

CONSTRUCTION AND UPGRADE OF E-RING ROAD


NORTH / SOUTH LINK (P008-C2) PROJECT ID : IA 14/15 C 075 ST
PROJECTWIDE - PEDESTRIAN BRIDGES
ISSUED FOR CONSTRUCTION
STRUCTURAL DRAWINGS
PACKAGE No. P008-0000-SE-PB-C-001
VOLUME 2 OF 2 - DRAWINGS
AL RAYYAN ROAD

AL
AM
IR
ST
RE
ET
E ET
STR
A AB
ALW

C-RING ROAD
AD
RO

AL MUNTAZAH ST.
A
W

AL
L D
SA R OA

MA
I N G
D-R

TA
D-RING ROAD

RS
ET

TR
E
TR

EE
NA
L S

T
E-

J
OU

MA
RI
L

ME
HA

NG

ST
AD

SA
RO

RE
RO
IM
A

ET
AD
W

EE
L
SA

R
W

AL
RO
HO

MA
AD
LE

OAD
E-RING R

TA
SA
LE

RS
M

TR
E
AR

RE

EE
KE

ST
OAD
T

T
AH R
ST

AZ - RING
R

T F
EE

UN
T

AL
M
AL
EA

WA
ST

KRA
IN
DU

HB
ST

YPA
RI
AL

S
AR

SE
EA

XTN
ST
RE
ET

LOCALITY PLAN

2nd Floor , Al Faisal Tower 2, West Bay P.O. Box : 23103, Doha, Qatar
P.O. Box : 26666, Doha, Qatar Tel.: (+974) 4435 1612
Tel.: (+974) 44950048 Fax.: (+974) 4435 2320
Fax.: (+974) 44834791

EXW-P008-0000-SE-PBR-DG-94001-001
1 2 3 4 5 6 7 8 9 10 11 12

DRAWING LIST - PROJECT WIDE - PEDESTRIAN BRIDGE STRUCTURES


A A
DRAWING No. DESCRIPTION

DESIGN DRAWINGS

EXW-P008-0000-SE-PBR-DG-94001-001 STRUCTURAL - PED. BRIDGES COVER SHEET


EXW-P008-0000-SE-PBR-DG-94002-001 STRUCTURAL - PED. BRIDGES DRAWING LIST
EXW-P008-0000-SE-PBR-DG-94004-001 STRUCTURAL - PED. BRIDGES GENERAL NOTES AND LEGENDS
KEY PLAN
EXW-P008-0000-SE-PBR-DG-94006-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL IMAGES & FINISHES SCHEDULE NOTES:
B
EXW-P008-0000-SE-PBR-DG-94007-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CONCRETE FLOOR FINISHES B

EXW-P008-0000-SE-PBR-DG-94101-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS ELEVATIONS


EXW-P008-0000-SE-PBR-DG-94102-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS ELEVATIONS & TYPICAL SECTIONS

EXW-P008-0000-SE-PBR-DG-94106-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BALUSTRADE DETAILS - SHEET 1


EXW-P008-0000-SE-PBR-DG-94107-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BALUSTRADE DETAILS - SHEET 2

EXW-P008-0000-SE-PBR-DG-94111-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 1


EXW-P008-0000-SE-PBR-DG-94112-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 2
EXW-P008-0000-SE-PBR-DG-94113-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 3
EXW-P008-0000-SE-PBR-DG-94114-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 4
C
EXW-P008-0000-SE-PBR-DG-94115-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 5 LEGEND: C

EXW-P008-0000-SE-PBR-DG-94116-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 6


EXW-P008-0000-SE-PBR-DG-94121-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS LIFT SHAFT DETAILS
EXW-P008-0000-SE-PBR-DG-94122-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS STAIR LANDING

EXW-P008-0000-SE-PBR-DG-94126-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BRIDGE SOFFIT CEILING DETAILS

EXW-P008-0000-SE-PBR-DG-94128-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS TOWER & BRIDGE CEILING DETAILS

EXW-P008-0000-SE-PBR-DG-94131-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 1
EXW-P008-0000-SE-PBR-DG-94132-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 2
D EXW-P008-0000-SE-PBR-DG-94133-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 3 D

EXW-P008-0000-SE-PBR-DG-94134-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 4

EXW-P008-0000-SE-PBR-DG-94151-001 STRUCTURAL - PED. BRIDGES CONSTRUCTION SEQUENCE TWO SPAN BRIDGE


EXW-P008-0000-SE-PBR-DG-94152-001 STRUCTURAL - PED. BRIDGES CONSTRUCTION SEQUENCE SINGLE SPAN BRIDGE

EXW-P008-0000-SE-PBR-DG-94201-001 STRUCTURAL - PED. BRIDGES PIERS/LIFT SHAFT 1 & 3 FOOTING DETAILS


EXW-P008-0000-SE-PBR-DG-94211-001 STRUCTURAL - PED. BRIDGES PIERS/LIFT SHAFT 1 & 3 CONCRETE DETAILS
EXW-P008-0000-SE-PBR-DG-94231-001 STRUCTURAL - PED. BRIDGES PIERS/LIFT SHAFT 1 & 3 FOOTING REINFORCEMENT DETAILS
EXW-P008-0000-SE-PBR-DG-94232-001 STRUCTURAL - PED. BRIDGES PIER/LIFT SHAFT 1 & 3 REINFORCEMENT DETAILS Rev Date Revision Details Drawn Chkd Appd

EXW-P008-0000-SE-PBR-DG-94241-001 STRUCTURAL - PED. BRIDGES PIER 2 PILECAP AND PIER CONCRETE


E EXW-P008-0000-SE-PBR-DG-94251-001 STRUCTURAL - PED. BRIDGES PIER 2 - PILECAP REINFORCEMENT E
EXW-P008-0000-SE-PBR-DG-94252-001 STRUCTURAL - PED. BRIDGES PIER 2 - PIER REINFORCEMENT

EXW-P008-0000-SE-PBR-DG-94401-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 1
EXW-P008-0000-SE-PBR-DG-94402-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 2
EXW-P008-0000-SE-PBR-DG-94403-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 3
Project Management Consultant : Design Consultant :
EXW-P008-0000-SE-PBR-DG-94406-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE REAR ARCHT'L PANEL SUPPORT
SHE BOX
EXW-P008-0000-SE-PBR-DG-94408-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE FRONT ARCHT'L PANEL SUPPORT
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION
F
EXW-P008-0000-SE-PBR-DG-94411-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR STEELWORK DETAILS - SHEET 1 IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK F
EXW-P008-0000-SE-PBR-DG-94412-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR STEELWORK DETAILS - SHEET 2 DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS Supervision Consultant : Construction Contractor :
EXW-P008-0000-SE-PBR-DG-94413-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR CONCRETE DETAILS - SHEET 1 (REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD REGISTER IN THE DESIGN
EXW-P008-0000-SE-PBR-DG-94414-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR CONCRETE DETAILS - SHEET 2 REPORT).
EXW-P008-0000-SE-PBR-DG-94421-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR REINFORCEMENT
EXW-P008-0000-SE-PBR-DG-94431-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR MISCELLANEOUS DETAILS CONSTRUCTION

• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO


EXW-P008-0000-SE-PBR-DG-94601-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 1 CONSTRUCTION WORKS COMMENCING. Project Name:
EXW-P008-0000-SE-PBR-DG-94602-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 2 • SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION CONSTRUCTION AND UPGRADE OF
EXW-P008-0000-SE-PBR-DG-94603-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 3 YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS
EXW-P008-0000-SE-PBR-DG-94604-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 4
E-RING ROAD
SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR.
EXW-P008-0000-SE-PBR-DG-94605-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 5 • REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION NORTH / SOUTH LINK (P008-C2)
G G
EXW-P008-0000-SE-PBR-DG-94621-001 STRUCTURAL - PED. BRIDGES ROOF DETAILS - SHEET 1 SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK
EXW-P008-0000-SE-PBR-DG-94622-001 STRUCTURAL - PED. BRIDGES ROOF DETAILS - SHEET 2 ERECTION. Project Code:
EXW-P008-0000-SE-PBR-DG-94631-001 STRUCTURAL - PED. BRIDGES DRAINAGE DETAILS • TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS IA 14/15 C 075 ST
EXW-P008-0000-SE-PBR-DG-94641-001 STRUCTURAL - PED. BRIDGES DECK REINFORCEMENT DETAILS FOR CONSTRUCTION. Status:
CONSTRUCTION
MAINTENANCE/CLEANING Drawing Title:
EXW-P008-0000-SE-PBR-DG-94701-001 STRUCTURAL - PED. BRIDGES EXPANSION JOINT LAYOUT & DETAILS
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT PROJECT WIDE
REGULAR INTERVALS. STRUCTURAL - PED. BRIDGES
MODEL FILES USE DRAWING LIST
X2-P008-0000-S-PBR-DE-41 • NONE
H X2-P008-0000-S-PBR-DE-41C Drawn:
M LONG
Checked:
A.GALLAGHER H
DECOMMISSIONING/DEMOLITION
X2-P008-0000-S-PBR-DE-41S Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE Date: Scale:
NOVEMBER 2014 NTS
X3-P008-0000-S-PBR-DE-41 CONSTRUCTION ERECTION.
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94002-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A



• NOTES:

B • B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
• CONSTRUCTION

• Drawing Title:


PROJECT WIDE

STRUCTURAL - PED. BRIDGES

GENERAL NOTES AND LEGENDS

H • Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94004-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL IMAGES &
FINISHES SCHEDULE
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94006-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CONCRETE FLOOR FINISHES
H Drawn:
W. IQBAL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
MAY 2015 1:50 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94007-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
ELEVATIONS
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94101-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
ELEVATIONS & TYPICAL SECTIONS
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94102-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
BALUSTRADE DETAILS - SHEET 1
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94106-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
BALUSTRADE DETAILS - SHEET 2
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MARCH 2015 1:10 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94107-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 1
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94111-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 2
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94112-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

LEGEND:

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 3
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94113-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 4
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94114-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 5
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94115-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
CLADDING DETAILS - SHEET 6
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94116-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 CLOSED
2 3 SHAFT-PLANS
4 5 OPEN
6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
LIFT SHAFT DETAILS
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94121-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
STAIR LANDING
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94122-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
BRIDGE SOFFIT CEILING DETAILS
H Drawn:
M. LONG
Checked:
A.GALLAGHER H

Designed: Approved:
R. CHUNG N.BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94126-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
TOWER & BRIDGE CEILING DETAILS
H Drawn:
M. LONG
Checked:
A.GALLAGHER H

Designed: Approved:
R. CHUNG N.BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94128-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
OPEN CLADDING LAYOUT - SHT 1
H Drawn:
G STONE
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94131-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
OPEN CLADDING LAYOUT - SHT 2
H Drawn:
G STONE
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94132-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

*
**

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


*

E-RING ROAD
** NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
OPEN CLADDING LAYOUT - SHT 3
H Drawn:
G STONE
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MARCH 2015 1:25 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94133-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

** ** **

*
NOTES:
B B

*
*
*

C LEGEND: C

*
*

**
*

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ARCHITECTURAL DETAILS
OPEN CLADDING LAYOUT - SHT 4
H Drawn:
G STONE
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MARCH 2015 1:25 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94134-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :


SHE BOX

SAFETY, HEALTH AND ENVIRONMENTAL


INFORMATION
F F
IN ADDITION TO THE HAZARDS/RISKS NORMALLY Supervision Consultant : Construction Contractor :
ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS
DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS
(REFERENCE SHALL ALSO BE MADE TO THE RISK AND
HAZARD REGISTER IN THE DESIGN REPORT).

CONSTRUCTION
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY Project Name:
CONTRACTOR PRIOR TO CONSTRUCTION WORKS
COMMENCING.
CONSTRUCTION AND UPGRADE OF
• SELF- WEIGHT OF TRUSS SEGMENTS TO BE E-RING ROAD
CONFIRMED BY THE FABRICATION YARD WITH
APPROVED LIFTING DEVICES. TRANSPORTATION OF NORTH / SOUTH LINK (P008-C2)
G TRUSS SEGMENTS AND ERECTION METHODOLOGY TO G
BE PROPOSED BY CONTRACTOR.
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND
THE TEMPORARY PROPS FOR CONSTRUCTION. Project Code:
• ERECTION SEQUENCE AS PROVIDED ON THIS DRAWING IA 14/15 C 075 ST
IS INDICATIVE ONLY. DETAILED SAFE WORK METHOD Status:
STATEMENTS ARE TO BE DEVELOPED BY THE CONSTRUCTION
CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR
Drawing Title:
APPROVAL PRIOR TO WORKS COMMENCING ON SITE.

MAINTENANCE/CLEANING
• STRUCTURAL INSPECTIONS TO FORM PART OF
STRUCTURAL - PED. BRIDGES
MAINTENANCE REGIME AT REGULAR INTERVALS. CONSTRUCTION SEQUENCE
USE TWO SPAN BRIDGE
H • NONE Drawn:
W.IQBAL
Checked:
A GALLAGHER H

Designed: Approved:
DECOMMISSIONING/DEMOLITION M.KANJULA N BROWNLEE
Date: Scale:
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE MAY 2015 1:200 on A1
ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:

EXW P008 0000 SE PBR DG 94151 001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

SHE BOX Project Management Consultant : Design Consultant :

SAFETY, HEALTH AND ENVIRONMENTAL


INFORMATION
F IN ADDITION TO THE HAZARDS/RISKS NORMALLY F
ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS Supervision Consultant : Construction Contractor :
DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS
(REFERENCE SHALL ALSO BE MADE TO THE RISK AND
HAZARD REGISTER IN THE DESIGN REPORT).

CONSTRUCTION
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY Project Name:
CONTRACTOR PRIOR TO CONSTRUCTION WORKS
COMMENCING. CONSTRUCTION AND UPGRADE OF
• SELF- WEIGHT OF TRUSS SEGMENTS TO BE
CONFIRMED BY THE FABRICATION YARD WITH E-RING ROAD
APPROVED LIFTING DEVICES. TRANSPORTATION OF
TRUSS SEGMENTS AND ERECTION METHODOLOGY TO
NORTH / SOUTH LINK (P008-C2)
G BE PROPOSED BY CONTRACTOR. G
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND
THE TEMPORARY PROPS FOR CONSTRUCTION. Project Code:
• ERECTION SEQUENCE AS PROVIDED ON THIS DRAWING
IS INDICATIVE ONLY. DETAILED SAFE WORK METHOD
IA 14/15 C 075 ST
STATEMENTS ARE TO BE DEVELOPED BY THE Status:
CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR
CONSTRUCTION
APPROVAL PRIOR TO WORKS COMMENCING ON SITE. Drawing Title:

MAINTENANCE/CLEANING PROJECT WIDE


• STRUCTURAL INSPECTIONS TO FORM PART OF STRUCTURAL - PED. BRIDGES
MAINTENANCE REGIME AT REGULAR INTERVALS.
CONSTRUCTION SEQUENCE
USE
SINGLE SPAN BRIDGE
H • NONE Drawn: Checked: H
W.IQBAL A GALLAGHER
DECOMMISSIONING/DEMOLITION Designed: Approved:
M.KANJULA N BROWNLEE
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE Date: Scale:
MAY 2015 1:200 on A1
ORDER OF THE CONSTRUCTION ERECTION.
Drawing Number: Revision:

EXW P008 0000 SE PBR DG 94152 001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS/LIFT SHAFT 1 & 3
FOOTING DETAILS
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94201-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS/LIFT SHAFT 1 & 3
CONCRETE DETAILS
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 1:50 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94211-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS/LIFT SHAFT 1 & 3

H Drawn:
S.AHMED
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 1:50 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94231-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


WHOLESALE MARKET STREET &
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS/LIFT SHAFT 1 & 3

H Drawn:
S.AHMED
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94232-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIER 2
PILECAP AND PIER CONCRETE
H Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:50 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94241-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIER 2 PILECAP
REINFORCEMENT
H Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:25 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94251-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES

REINFORCEMENT
H Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94252-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
STEELWORK DETAILS - SHEET 1
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:50 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94401-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
STEELWORK DETAILS - SHEET 2
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:20 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94402-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
STEELWORK DETAILS - SHEET 3
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:10 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94403-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

*
Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
REAR ARCHT'L PANEL SUPPORT
H Drawn:
F. PALEAN
Checked:
A.GALLAGHER H

Designed: Approved:
M. WINDING N.BROWNLEE
Date: Scale:
FEBRUARY 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94406-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 TOWER STRUCTURE
FRONT ARCHT'L PANEL SUPPORT
H Drawn:
M. LONG
Checked:
A.GALLAGHER H

Designed: Approved:
R. CHUNG N.BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94408-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR STEELWORK
DETAILS - SHEET 1
H Drawn:
G STONE
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:50 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94411-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR STEELWORK
DETAILS - SHEET 2
H Drawn:
G STONE
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:20 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94412-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR CONCRETE
DETAILS - SHEET 1
H Drawn:
G STONE
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:50 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94413-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR CONCRETE
DETAILS - SHEET 2
H Drawn:
G STONE
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 1:10 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94414-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR
REINFORCEMENT
H Drawn:
R. TORRES
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
DECEMBER 2014 1:50 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94421-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
PIERS 1 & 3 STAIR
MISCELLANEOUS DETAILS
H Drawn:
R. TORRES
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94431-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 1
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 1:25 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94601-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 2
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94602-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 3
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94603-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 4
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
SEPTEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94604-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
BRIDGE STRUCTURE STEELWORK
DETAILS - SHEET 5
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H
NOTES:
Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94605-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ROOF
DETAILS - SHEET 1
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:25 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94621-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
ROOF
DETAILS - SHEET 2
H Drawn:
S.AHMED
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94622-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
DRAINAGE
DETAILS
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 1:10 on A1
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94631-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
DECK
REINFORCEMENT DETAILS
H Drawn:
R.ONATHUKATTIL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94641-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PROJECT WIDE
STRUCTURAL - PED. BRIDGES
EXPANSION JOINT
LAYOUT & DETAILS
H Drawn:
W.IQBAL
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
OCTOBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0000- SE - PBR -DG-94701-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
QATAR EXPRESSWAYS
CONSTRUCTION AND UPGRADE OF E-RING ROAD
NORTH / SOUTH LINK (P008-C2) PROJECT ID : IA 14/15 C 075 ST
E-RING ROAD - PEDESTRIAN BRIDGE ERR-PB-01
ISSUED FOR CONSTRUCTION
STRUCTURAL DRAWINGS
PACKAGE No. P008-0002-SE-PB-C-001
VOLUME 2 OF 2 - DRAWINGS

AL
AM
IR
ST
RE
ET
T
EE
TR
BS
WAA
AL

A D C-RING ROAD
RO
A

AL MUNTAZAH ST.
W
AL

AL
S D
ROA

MA
IN G
D-R

T
D-RING ROAD

AR
ST
ET

RE
RE
ST

NA

E
UL

T
E-
ME

JMA
LO

RI
HA

SA

NG

ST
AD

IM
RO

RE
RO
EE
A

ET
AD
W

R
L
SA

RO
W

AL
AD
HO

MA
LE

OAD
ERR-PB-01 E-RING R
SA

TA
LE

R
M

ST
T
AR

RE
RE
KE

ST

ET
T

H OAD
ST

ZA GR
-RIN
RE

AL
T A F
ET

UN

WA
M
AL

KRA
HB
YPA
SS
EXT
N
LOCALITY PLAN

2nd Floor , Al Faisal Tower 2, West Bay P.O. Box : 23103, Doha, Qatar
P.O. Box : 26666, Doha, Qatar Tel.: (+974) 4435 1612
Tel.: (+974) 44950048 Fax.: (+974) 4435 2320
Fax.: (+974) 44834791

EXW-P008-0002-SE-PBR-DG-40001-001
1 2 3 4 5 6 7 8 9 10 11 12

DRAWING LIST - PEDESTRIAN BRIDGE ERR-PB-01


A A
DRAWING No. DESCRIPTION PROJECT WIDE DRAWING No. DESCRIPTION

DESIGN DRAWINGS DESIGN DRAWINGS

EXW-P008-0002-SE-PBR-DG-40001-001 STRUCTURAL COVER SHEET EXW-P008-0000-SE-PBR-DG-94001-001 STRUCTURAL - PED. BRIDGES COVER SHEET
EXW-P008-0002-SE-PBR-DG-40002-001 STRUCTURAL DRAWING LIST EXW-P008-0000-SE-PBR-DG-94002-001 STRUCTURAL - PED. BRIDGES DRAWING LIST
EXW-P008-0000-SE-PBR-DG-94004-001 STRUCTURAL - PED. BRIDGES GENERAL NOTES AND LEGENDS
EXW-P008-0002-SE-PBR-DG-40111-001 STRUCTURAL GENERAL ARRANGEMENT PLAN AND ELEVATION KEY PLAN
EXW-P008-0002-SE-PBR-DG-40112-001 STRUCTURAL GENERAL ARRANGEMENT SECTIONS - SHEET 1 EXW-P008-0000-SE-PBR-DG-94006-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL IMAGES & FINISHES SCHEDULE NOTES:
B
EXW-P008-0002-SE-PBR-DG-40113-001 STRUCTURAL GENERAL ARRANGEMENT SECTIONS - SHEET 2 EXW-P008-0000-SE-PBR-DG-94007-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CONCRETE FLOOR FINISHES B
EXW-P008-0002-SE-PBR-DG-40114-001 STRUCTURAL GENERAL ARRANGEMENT SECTIONS - SHEET 3
EXW-P008-0002-SE-PBR-DG-40115-001 STRUCTURAL GENERAL ARRANGEMENT SECTIONS - SHEET 4 EXW-P008-0000-SE-PBR-DG-94101-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS ELEVATIONS
EXW-P008-0002-SE-PBR-DG-40151-001 STRUCTURAL CONSTRUCTION SEQUENCE EXW-P008-0000-SE-PBR-DG-94102-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS ELEVATIONS & TYPICAL SECTIONS

EXW-P008-0002-SE-PBR-DG-40201-001 STRUCTURAL FOUNDATION LAYOUT EXW-P008-0000-SE-PBR-DG-94106-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BALUSTRADE DETAILS - SHEET 1
EXW-P008-0002-SE-PBR-DG-40211-001 STRUCTURAL PIERS 1, 2 & 3 LEVELS DATA EXW-P008-0000-SE-PBR-DG-94107-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BALUSTRADE DETAILS - SHEET 2

EXW-P008-0002-SE-PBR-DG-40401-001 STRUCTURAL PIER 1 TOWER STEELWORK STEELWORK DETAILS EXW-P008-0000-SE-PBR-DG-94111-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 1
EXW-P008-0002-SE-PBR-DG-40402-001 STRUCTURAL PIER 3 TOWER STEELWORK STEELWORK DETAILS EXW-P008-0000-SE-PBR-DG-94112-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 2
EXW-P008-0002-SE-PBR-DG-40411-001 STRUCTURAL PIER 1 STAIR LAYOUT EXW-P008-0000-SE-PBR-DG-94113-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 3
EXW-P008-0002-SE-PBR-DG-40412-001 STRUCTURAL PIER 3 STAIR LAYOUT EXW-P008-0000-SE-PBR-DG-94114-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 4
C C
EXW-P008-0002-SE-PBR-DG-40413-001 STRUCTURAL PIER 1 STAIR CONCRETE SECTIONS EXW-P008-0000-SE-PBR-DG-94115-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 5
EXW-P008-0002-SE-PBR-DG-40414-001 STRUCTURAL PIER 3 STAIR CONCRETE SECTIONS EXW-P008-0000-SE-PBR-DG-94116-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS CLADDING DETAILS - SHEET 6
EXW-P008-0002-SE-PBR-DG-40415-001 STRUCTURAL PIER 1 STAIR CONCRETE DETAILS EXW-P008-0000-SE-PBR-DG-94121-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS LIFT SHAFT DETAILS
EXW-P008-0002-SE-PBR-DG-40416-001 STRUCTURAL PIER 1 STAIR REINFORCEMENT DETAILS EXW-P008-0000-SE-PBR-DG-94122-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS STAIR LANDING

EXW-P008-0002-SE-PBR-DG-40501-001 STRUCTURAL BEARINGS LAYOUT EXW-P008-0000-SE-PBR-DG-94126-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS BRIDGE SOFFIT CEILING DETAILS

EXW-P008-0002-SE-PBR-DG-40601-001 STRUCTURAL BRIDGE STRUCTURE STEELWORK LAYOUT EXW-P008-0000-SE-PBR-DG-94128-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS TOWER & BRIDGE CEILING DETAILS
EXW-P008-0002-SE-PBR-DG-40602-001 STRUCTURAL BRIDGE STRUCTURE STEELWORK TRUSS ARRANGEMENT
EXW-P008-0002-SE-PBR-DG-40641-001 STRUCTURAL DECK CONCRETE LAYOUT EXW-P008-0000-SE-PBR-DG-94131-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 1
EXW-P008-0002-SE-PBR-DG-40661-001 STRUCTURAL ROOF LAYOUT EXW-P008-0000-SE-PBR-DG-94132-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 2
D EXW-P008-0000-SE-PBR-DG-94133-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 3 D

EXW-P008-0002-SE-PBR-DG-40801-001 STRUCTURAL ARCHITECTURAL CLADDING PANEL TYPE TA5 EXW-P008-0000-SE-PBR-DG-94134-001 STRUCTURAL - PED. BRIDGES ARCHITECTURAL DETAILS OPEN CLADDING LAYOUT - SHT 4

EXW-P008-0000-SE-PBR-DG-94151-001 STRUCTURAL - PED. BRIDGES CONSTRUCTION SEQUENCE TWO SPAN BRIDGE


MODEL FILES EXW-P008-0000-SE-PBR-DG-94152-001 STRUCTURAL - PED. BRIDGES CONSTRUCTION SEQUENCE SINGLE SPAN BRIDGE

X2-EXW-P008-0002-S-PBR-PBRG-DE-40 EXW-P008-0000-SE-PBR-DG-94201-001 STRUCTURAL - PED. BRIDGES PIERS/LIFT SHAFT 1 & 3 FOOTING DETAILS
X2-EXW-P008-0002-S-PBR-PBRG-DE-40C EXW-P008-0000-SE-PBR-DG-94211-001 STRUCTURAL - PED. BRIDGES PIERS/LIFT SHAFT 1 & 3 CONCRETE DETAILS
X2-EXW-P008-0002-S-PBR-PBRG-DE-40S EXW-P008-0000-SE-PBR-DG-94231-001 STRUCTURAL - PED. BRIDGES PIERS/LIFT SHAFT 1 & 3 FOOTING REINFORCEMENT DETAILS
EXW-P008-0000-SE-PBR-DG-94232-001 STRUCTURAL - PED. BRIDGES PIER/LIFT SHAFT 1 & 3 REINFORCEMENT DETAILS Rev Date Revision Details Drawn Chkd Appd

X3-EXW-P008-0002-S-PBR-PBRG-DE-40 EXW-P008-0000-SE-PBR-DG-94241-001 STRUCTURAL - PED. BRIDGES PIER 2 PILECAP AND PIER CONCRETE
E EXW-P008-0000-SE-PBR-DG-94251-001 STRUCTURAL - PED. BRIDGES PIER 2 - PILECAP REINFORCEMENT E
EXW-P008-0000-SE-PBR-DG-94252-001 STRUCTURAL - PED. BRIDGES PIER 2 - PIER REINFORCEMENT

EXW-P008-0000-SE-PBR-DG-94401-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 1
EXW-P008-0000-SE-PBR-DG-94402-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 2
EXW-P008-0000-SE-PBR-DG-94403-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE STEELWORK DETAILS - SHEET 3
SHE BOX Project Management Consultant : Design Consultant :
EXW-P008-0000-SE-PBR-DG-94406-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE REAR ARCHT'L PANEL SUPPORT
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION EXW-P008-0000-SE-PBR-DG-94408-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 TOWER STRUCTURE FRONT ARCHT'L PANEL SUPPORT
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK
F
DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS EXW-P008-0000-SE-PBR-DG-94411-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR STEELWORK DETAILS - SHEET 1 F
(REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD REGISTER IN THE DESIGN EXW-P008-0000-SE-PBR-DG-94412-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR STEELWORK DETAILS - SHEET 2 Supervision Consultant : Construction Contractor :
REPORT). EXW-P008-0000-SE-PBR-DG-94413-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR CONCRETE DETAILS - SHEET 1
CONSTRUCTION EXW-P008-0000-SE-PBR-DG-94414-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR CONCRETE DETAILS - SHEET 2
EXW-P008-0000-SE-PBR-DG-94421-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR REINFORCEMENT
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO EXW-P008-0000-SE-PBR-DG-94431-001 STRUCTURAL - PED. BRIDGES PIERS 1 & 3 STAIR MISCELLANEOUS DETAILS
CONSTRUCTION WORKS COMMENCING.
• SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION EXW-P008-0000-SE-PBR-DG-94601-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 1 Project Name:
YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS EXW-P008-0000-SE-PBR-DG-94602-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 2 CONSTRUCTION AND UPGRADE OF
SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR. EXW-P008-0000-SE-PBR-DG-94603-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 3
• REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION EXW-P008-0000-SE-PBR-DG-94604-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 4
E-RING ROAD
SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK EXW-P008-0000-SE-PBR-DG-94605-001 STRUCTURAL - PED. BRIDGES BRIDGE STRUCTURE STEELWORK DETAILS - SHEET 5 NORTH / SOUTH LINK (P008-C2)
G ERECTION. EXW-P008-0000-SE-PBR-DG-94621-001 STRUCTURAL - PED. BRIDGES ROOF DETAILS - SHEET 1
G
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS EXW-P008-0000-SE-PBR-DG-94622-001 STRUCTURAL - PED. BRIDGES ROOF DETAILS - SHEET 2 Project Code:
FOR CONSTRUCTION. IA 14/15 C 075 ST
EXW-P008-0000-SE-PBR-DG-94631-001 STRUCTURAL - PED. BRIDGES DRAINAGE DETAILS
MAINTENANCE/CLEANING EXW-P008-0000-SE-PBR-DG-94641-001 STRUCTURAL - PED. BRIDGES DECK REINFORCEMENT DETAILS Status:
CONSTRUCTION
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT Drawing Title:
EXW-P008-0000-SE-PBR-DG-94701-001 STRUCTURAL - PED. BRIDGES EXPANSION JOINT LAYOUT & DETAILS
REGULAR INTERVALS. PEDESTRIAN BRIDGE ERR-PB-01
USE STRUCTURAL
• NONE DRAWING LIST
DECOMMISSIONING/DEMOLITION
H Drawn: Checked: H
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE J. CARTAGO A. GALLAGHER
Designed: Approved:
CONSTRUCTION ERECTION. A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 NTS
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40002-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

KEY PLAN
NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
SHE BOX NORTH / SOUTH LINK (P008-C2)
G G
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS (REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD Project Code:
REGISTER IN THE DESIGN REPORT). IA 14/15 C 075 ST
Status:
CONSTRUCTION CONSTRUCTION
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO CONSTRUCTION WORKS COMMENCING. Drawing Title:
• SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR.
• REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK ERECTION. PEDESTRIAN BRIDGE ERR-PB-01
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS FOR CONSTRUCTION.
STRUCTURAL
MAINTENANCE/CLEANING
GENERAL ARRANGEMENT
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT REGULAR INTERVALS.
PLAN AND ELEVATION
H USE Drawn: Checked: H
J. CARTAGO A. GALLAGHER
• NONE
Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date: Scale:
NOVEMBER 2014 AS SHOWN
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40111-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

KEY PLAN
NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
SHE BOX NORTH / SOUTH LINK (P008-C2)
G G

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION


Project Code:
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS (REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD IA 14/15 C 075 ST
REGISTER IN THE DESIGN REPORT).
Status:
CONSTRUCTION
CONSTRUCTION
Drawing Title:
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO CONSTRUCTION WORKS COMMENCING.


SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR.
REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK ERECTION.
PEDESTRIAN BRIDGE ERR-PB-01
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS FOR CONSTRUCTION. STRUCTURAL
MAINTENANCE/CLEANING GENERAL ARRANGEMENT
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT REGULAR INTERVALS. SECTIONS - SHEET 1
H USE Drawn:
M. GELIDO
Checked:
A. GALLAGHER H

• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
AS SHOWN
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40112-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

KEY PLAN
NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
SHE BOX NORTH / SOUTH LINK (P008-C2)
G G

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION


Project Code:
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS (REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD IA 14/15 C 075 ST
REGISTER IN THE DESIGN REPORT).
Status:
CONSTRUCTION
CONSTRUCTION
Drawing Title:
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO CONSTRUCTION WORKS COMMENCING.


SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR.
REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK ERECTION.
PEDESTRIAN BRIDGE ERR-PB-01
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS FOR CONSTRUCTION. STRUCTURAL
MAINTENANCE/CLEANING GENERAL ARRANGEMENT
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT REGULAR INTERVALS. SECTIONS - SHEET 2
H USE Drawn:
M. GELIDO
Checked:
A. GALLAGHER H

• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
1:50 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40113-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

KEY PLAN
NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
SHE BOX NORTH / SOUTH LINK (P008-C2)
G G

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION


Project Code:
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS (REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD IA 14/15 C 075 ST
REGISTER IN THE DESIGN REPORT).
Status:
CONSTRUCTION
CONSTRUCTION
Drawing Title:
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO CONSTRUCTION WORKS COMMENCING.


SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR.
REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK ERECTION.
PEDESTRIAN BRIDGE ERR-PB-01
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS FOR CONSTRUCTION. STRUCTURAL
MAINTENANCE/CLEANING GENERAL ARRANGEMENT
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT REGULAR INTERVALS. SECTIONS - SHEET 3
H USE Drawn:
M. GELIDO
Checked:
A. GALLAGHER H

• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
1:50 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40114-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

KEY PLAN
NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
SHE BOX NORTH / SOUTH LINK (P008-C2)
G G

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION


Project Code:
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS (REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD IA 14/15 C 075 ST
REGISTER IN THE DESIGN REPORT).
Status:
CONSTRUCTION
CONSTRUCTION
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO CONSTRUCTION WORKS COMMENCING. Drawing Title:


SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR.
REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK ERECTION.
PEDESTRIAN BRIDGE ERR-PB-01
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS FOR CONSTRUCTION. STRUCTURAL
MAINTENANCE/CLEANING GENERAL ARRANGEMENT
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT REGULAR INTERVALS. SECTIONS - SHEET 4
H USE Drawn:
M. GELIDO
Checked:
A. GALLAGHER H

• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
DECEMBER 2014
Scale:
1:50 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40115-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :


SHE BOX

SAFETY, HEALTH AND ENVIRONMENTAL


INFORMATION
F F
IN ADDITION TO THE HAZARDS/RISKS NORMALLY Supervision Consultant : Construction Contractor :
ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS
DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS
(REFERENCE SHALL ALSO BE MADE TO THE RISK AND
HAZARD REGISTER IN THE DESIGN REPORT).

CONSTRUCTION
Project Name:
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY
CONTRACTOR PRIOR TO CONSTRUCTION WORKS CONSTRUCTION AND UPGRADE OF
COMMENCING.
• SELF- WEIGHT OF TRUSS SEGMENTS TO BE E-RING ROAD
CONFIRMED BY THE FABRICATION YARD WITH
APPROVED LIFTING DEVICES. TRANSPORTATION OF NORTH / SOUTH LINK (P008-C2)
G TRUSS SEGMENTS AND ERECTION METHODOLOGY TO G
BE PROPOSED BY CONTRACTOR.
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND
Project Code:
THE TEMPORARY PROPS FOR CONSTRUCTION.
• ERECTION SEQUENCE AS PROVIDED ON THIS DRAWING
IA 14/15 C 075 ST
IS INDICATIVE ONLY. DETAILED SAFE WORK METHOD Status:
STATEMENTS ARE TO BE DEVELOPED BY THE
CONSTRUCTION
CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR Drawing Title:
APPROVAL PRIOR TO WORKS COMMENCING ON SITE.

MAINTENANCE/CLEANING
STRUCTURAL
• STRUCTURAL INSPECTIONS TO FORM PART OF
MAINTENANCE REGIME AT REGULAR INTERVALS. CONSTRUCTION SEQUENCE
USE
H Drawn: Checked: H
• NONE W.IQBAL A GALLAGHER
Designed: Approved:
DECOMMISSIONING/DEMOLITION M.KANJULA N BROWNLEE
Date: Scale:
MAY 2015 1:250 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE
ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:

EXW P008 0002 SE PBR DG 40151 001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
FOUNDATION LAYOUT

H Drawn:
J. CARTAGO
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40201-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
PIERS 1, 2 & 3
LEVELS DATA
H Drawn:
J. CARTAGO
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40211-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
PIER 1 TOWER STRUCTURE
STEELWORK DETAILS
H Drawn:
M. LONG
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
MAY 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40401-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
PIER 3 TOWER STRUCTURE
STEELWORK DETAILS
H Drawn:
M. LONG
Checked:
A.GALLAGHER H

Designed: Approved:
A.SHRIVASTAVA N.BROWNLEE
Date: Scale:
MAY 2015 1:50 on A1
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40402-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
PIER 1
STAIR LAYOUT
H Drawn:
M. GELIDO
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 1:50 on A1
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40411-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
PIER 3
STAIR LAYOUT
H Drawn:
J. CARTAGO
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 1:50 on A1
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40412-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
PIER 1 STAIR CONCRETE
SECTIONS
H Drawn:
J. CARTAGO
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
JANUARY 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40413-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
PIER 3 STAIR CONCRETE
SECTIONS
H Drawn:
D. MANALANG
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
JANUARY 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40414-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
PIER 1 STAIR CONCRETE
DETAILS
H Drawn:
D. MANALANG
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40415-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
PIER 1 STAIR REINFORCEMENT
DETAILS
H Drawn:
D. MANALANG
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
MARCH 2015 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40416-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
BEARINGS LAYOUT

H Drawn:
J. CARTAGO
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40501-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
SHE BOX NORTH / SOUTH LINK (P008-C2)
G G

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION


Project Code:
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS (REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD IA 14/15 C 075 ST
REGISTER IN THE DESIGN REPORT).
Status:
CONSTRUCTION
CONSTRUCTION
Drawing Title:
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO CONSTRUCTION WORKS COMMENCING.


SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR.
REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK ERECTION.
PEDESTRIAN BRIDGE ERR-PB-01
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS FOR CONSTRUCTION. STRUCTURAL
MAINTENANCE/CLEANING BRIDGE STRUCTURE STEELWORK
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT REGULAR INTERVALS. LAYOUT
H USE Drawn:
M. GELIDO
Checked:
A. GALLAGHER H

• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
1:200 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40601-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

LEGEND:

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
SHE BOX NORTH / SOUTH LINK (P008-C2)
G G

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION


Project Code:
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC RESIDUAL RISKS (REFERENCE SHALL ALSO BE MADE TO THE RISK AND HAZARD IA 14/15 C 075 ST
REGISTER IN THE DESIGN REPORT).
Status:
CONSTRUCTION
CONSTRUCTION
Drawing Title:
• EXACT POSITION OF UTILITIES TO BE DETERMINED BY CONTRACTOR PRIOR TO CONSTRUCTION WORKS COMMENCING.


SELF- WEIGHT OF TRUSS SEGMENTS TO BE CONFIRMED BY THE FABRICATION YARD WITH APPROVED LIFTING DEVICES. TRANSPORTATION OF TRUSS SEGMENTS AND ERECTION METHODOLOGY TO BE PROPOSED BY CONTRACTOR.
REFER DRAWINGS ON CONSTRUCTION SEQUENCE FOR CONSTRUCTION SEQUENCES AND REQUIREMENTS FOR TEMPORARY WORKS DURING DECK ERECTION.
PEDESTRIAN BRIDGE ERR-PB-01
• TEMPORARY BARRIERS ARE TO BE PROVIDED AROUND THE TEMPORARY PROPS FOR CONSTRUCTION. STRUCTURAL
MAINTENANCE/CLEANING BRIDGE STRUCTURE STEELWORK
• STRUCTURAL INSPECTIONS TO FORM PART OF MAINTENANCE REGIME AT REGULAR INTERVALS. TRUSS ARRANGEMENT
H USE Drawn:
M. GELIDO
Checked:
A. GALLAGHER H

• NONE Designed:
A. SHRIVASTAVA
Approved:
N. BROWNLEE
DECOMMISSIONING/DEMOLITION Date:
NOVEMBER 2014
Scale:
1:200 on A1
• DEMOLITION METHOD SHALL FOLLOW THE REVERSE ORDER OF THE CONSTRUCTION ERECTION. Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40602-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
DECK
CONCRETE LAYOUT
H Drawn:
J. CARTAGO
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40641-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
ROOF
LAYOUT
H Drawn:
J. CARTAGO
Checked:
A. GALLAGHER H

Designed: Approved:
A. SHRIVASTAVA N. BROWNLEE
Date: Scale:
NOVEMBER 2014 AS SHOWN
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40661-001 CA


1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B B

C LEGEND: C

D D

Rev Date Revision Details Drawn Chkd Appd

E E

Project Management Consultant : Design Consultant :

F F
Supervision Consultant : Construction Contractor :

Project Name:

CONSTRUCTION AND UPGRADE OF


E-RING ROAD
NORTH / SOUTH LINK (P008-C2)
G G

Project Code:
IA 14/15 C 075 ST
Status:
CONSTRUCTION
Drawing Title:

PEDESTRIAN BRIDGE ERR-PB-01


STRUCTURAL
ARCHITECTURAL CLADDING
PANEL TYPE TA5
H Drawn:
M LONG
Checked:
A GALLAGHER H

Designed: Approved:
M WINDING N BROWNLEE
Date: Scale:
MAY 2014 NTS
Drawing Number: Revision:

EXW-P008-0002- SE - PBR -DG-40801-001 CA


1 2 3 4 5 6 7 8 9 10 11 12

You might also like