You are on page 1of 34

STRONG TEAM. STRONG PARTNER.

Company Overview
STRONG TEAM.

 Teamwork
 Experience
 Workmanship
 Relationships
STRONG TEAM.

 Mission: To become the leading provider of fabricated systems


for measurement, control, and operation of oil and gas pipelines
 Intent: To realize profitable growth by creating value for our
customers
 Core Values:
Safety Teamwork
Transparency Quality Workmanship
Application Expertise Integrity in Quoted Lead Time
STRONG TEAM.
We Engineer, Design, and Fabricate:
 Measurement Systems including:
 Meter Skids
 Pressure/Flow Control Skids
 EFM/GC Buildings
 Integrity Equipment – Pig Launchers/Receivers (Automated or
Manual)

All Built to Customer Specifications


STRONG PARTNER.
 Located on 12+ acres in Tulsa, OK
 More than 120,000 ft2 shop space
 60 Ton Crane Capacity
STRONG PARTNER.
 9,400 ft2 Radiography Facility
 Rigorous Quality Assurance
 Comprehensive Data Books
 On-Site Heat Treat Facility
STRONG PARTNER.
 18,500 ft2 Paint Facility
 Built-in curing systems to expedite dry time (4-6 hour dry time)
STRONG PARTNER.
 (1) Blast Room, (2) Paint Rooms – all 70’ x 25’ x 20’
STRONG PARTNER.
 (1) Blast Room, (2) Paint Rooms – all 70’ x 25’ x 20’
STRONG PARTNER.
 13,000 ft2 Warehouse
 6+ acres lay down yard
space
STRONG PARTNER.
Design and
Drafting
Support for
Pipeline
Measurement
and Control
Systems
Systems
 Meter Skids
 Flow Control/Regulator Skids
 Valve Switching Skids
 EFM/GC Buildings w/Full I&E Integration
 Main Line Valve (MLV) Settings
 Pig Launchers & Receivers
 Automated Sphere Launchers
 Fuel Gas Skids
Systems – Meter Skids

Ultrasonic Gas
Meter Skid
Systems – Meter Skids

Ultrasonic Gas
Meter Skid
Systems – Metering Skids

Orifice Gas
Metering Skid
Systems – Metering Skids

Coriolis
Metering Skid
Systems – Metering Skids

Coriolis
Metering Skid
Systems – Flow Control/ Regulator Skids

Single-Run with Bypass


Systems – Flow Control/ Regulator Skids
Systems – Valve Switching/OPP
Systems – EFM/GC Buildings
Full Integration Support For:
 Building Design
 Wiring Design
 Analyzer Programming
 Functional Testing
Systems – EFM/GC Buildings
Main Line Valve Settings (MLVs)
Main Line Valve Settings (MLVs)
Header Piping
Systems – Launchers/Receivers
Systems – Launchers/Receivers
Systems – Automated Launcher
Systems – Automated Launcher
Complete Systems
Complete Systems
Project Management
Project Management
Proj. Coordinator:

FAB SCHEDULE
JL DMC MN
JF Hrs:
34,401
34,281 19,748 6,905 4,907 1,856 1,087 9,696 8,659 35% Subcontract:
Purchasing Welding: Assembly: I&E: Paint: Total Skid Fab: Galv. Honing: Paint: Drawings:
Big Elk Customer Cust. 3rd Party Product Mech Struct I&E Total % Hrs Total % Hrs Total % Hrs Total % Hrs %
Job #: Ship: FC: FAT: Name: AML: Insp: Qty: Description: Mat'l Mat'l Mat'l Hrs Com. Left Hrs Com. Left Hrs Com. Left Hrs Com. Left Comp. PO# Due: PO# Due: PO# Due: PO# Due: Pipe Maps Skid I&E Notes:
Energy Transfer Michael 42" Seneca Lateral
ELK10062-01 3/18 N/A N/A ETC 1 100% X x 1,239 100% 0 126 100% 0 0 0% 0 213 100% 0 100% X X X X X X Big Elk X X X N/A N/A Ready to ship!
(Rover P/L) Fraser (48" Launcher - PF-02-001)
Energy Transfer Michael 42" Seneca Lateral
ELK10062-02 3/18 N/A N/A ETC 1 100% X x 381 100% 0 43 100% 0 0 0% 0 68 75% 17 97% X X X X X X Big Elk X X X N/A N/A At paint. (#2 ship priority)
(Rover P/L) Fraser (SN-MLV-02 _ MLV setting - PF-22-001)
Energy Transfer Michael 42" Seneca Lateral
ELK10062-04 3/18 N/A N/A ETC 1 100% X x 628 100% 0 53 100% 0 0 0% 0 70 75% 18 98% X X X X X X Big Elk X X X N/A N/A At paint. (#3 ship priority)
(Rover P/L) Fraser (CompSta./Suc./Disch/BVsetting - PF-25-001)
Energy Transfer Michael 36" Sherwood Lateral stencil
ELK10061-07 3/18 N/A N/A ETC 1 100% x 161 100% 0 28 100% 0 0 0% 0 40 90% 4 98% X X X X X X Big Elk X X IP N/A N/A At paint.
(Rover P/L) Fraser (24x36 CGT/Sherwood SideVlv - PF-42-001) ?
Domestic 12" x 16" 600# Modified LH Receiver (M2M) 102036 102036 102160
ELK10094-01 3/19 N/A N/A CNX N/A 1 X X n/a 204 100% 0 74 50% 37 0 0% 0 53 50% 27 81% X X X X X IP X N/A Ready for final assembly. Skid & pipe are here.
Only Includes structural skid D&N D&N ISAM
Domestic 16" x 20" 600# Modified LH Launcher (M2M) 102160
ELK10094-02 3/19 N/A N/A CNX N/A 1 X X n/a 217 100% 0 63 100% 0 0 0% 0 36 100% 0 100% X X X X X X X X IP N/A N/A Need to bolt up closure to trap / ship prep.
Only No Skid. ISAM
Domestic 16" x 20" 600# Modified RH Launcher (M2M) 102160
ELK10094-03 3/19 N/A N/A CNX N/A 1 X X n/a 217 100% 0 63 100% 0 0 0% 0 36 100% 0 100% X X X X X X X X IP N/A N/A Need to bolt up closure to trap / ship prep.
Only No Skid. ISAM
Domestic
ELK10092-01 3/21 N/A N/A TECO N/A 1 24" x 20" 600# Launcher System X n/a n/a 184 100% 0 43 50% 22 0 0% 0 56 5% 53 74% X X X X X X Big Elk X X IP N/A N/A At paint. TECO asked to hold until July. (field issues)
Major EU
Domestic
ELK10092-02 3/21 N/A N/A TECO N/A 1 24" x 20" 600# Receiver System X n/a n/a 176 100% 0 41 50% 21 0 0% 0 71 5% 67 69% X X X X X X Big Elk X X IP N/A N/A At paint. TECO asked to hold until July. (field issues)
Major EU
1/14 101822 101916 101622
ELK10064-01 3/22 3/17 Devtech / FPU ETC N/A 1 12" x 8" 300# USM Skid X X X 203 100% 0 136 100% 0 146 50% 73 120 100% 0 88% X X X Big Elk X X IP X X Calvin w/ FPU will be here on Thursday @ 9:00AM.
Nunn Plat.Crs AZZ Metro
101698 101698
ELK10065-01 3/22 N/A 3/17 Devtech / FPU ETC N/A 1 4" 300# Filter Skid - Rayonier Station X X n/a 66 100% 0 78 100% 0 0 0% 0 25 100% 0 100% X X X X Big Elk X X IP X N/A Calvin w/ FPU will be here on Thursday @ 9:00AM.
ABCO ABCO
12/7 101441 101441 101649
ELK10065-02 3/22 3/17 Devtech / FPU ETC N/A 1 4" 300# USM Skid w/Bypass - Rayonier Station X X X 47 100% 0 37 100% 0 55 100% 0 15 100% 0 100% X X X X X X IP X X Calvin w/ FPU will be here on Thursday @ 9:00AM.
Nunn ABCO ABCO Dec.
4"x6" 300# Turbine Meter / Regulator Skid - 101441 101441
ELK10065-03 3/22 N/A 3/17 Devtech / FPU ETC N/A 1 X X n/a 131 100% 0 82 100% 0 0 0% 0 38 100% 0 100% X X X X Big Elk X X IP X N/A Calvin w/ FPU will be here on Thursday @ 9:00AM.
Rayonier Station ABCO ABCO
102008 102008
ELK10093-01 3/22 N/A 3/17 Devtech / FPU N/A N/A 1 Structural Platform for ELK10064 & 65 skids n/a X n/a 95 100% 0 51 75% 13 0 0% 0 32 0% 32 75% X X X X X X X IP X N/A NEED TO PAINT SPOOLS!!
ABCO ABCO
Energy Transfer Building has shipped. Need to install O2 in field, bring
ELK10089-01 3/24 N/A 2/29 ETC Ken Poston 1 Dual room EFM/GC Building (Malaga Lateral) n/a X X 0 0% 0 0 0% 0 360 100% 0 0 0% 0 100% X X X X X X X X N/A N/A N/A X
(Transwestern) gas cylinder strap, conduit fittings, books, etc.
102184
ELK10101-01 4/5 N/A N/A Florida Gas (FGT) N/A N/A 1 35' x 3' Platform (Control skid steps) X X n/a 0 0% 0 0 0% 0 0 0% 0 0 0% 0 ##### Big Elk X X X X X X X N/A Plat.Crs will delivery to us Friday. Need to send to AZZ.
PlatCrs
102184
ELK10101-02 4/5 N/A N/A Florida Gas (FGT) N/A N/A 1 8' x 2' Platform (OPP skid steps) X X n/a 0 0% 0 0 0% 0 0 0% 0 0 0% 0 ##### Big Elk X X X X X X X N/A Plat.Crs will delivery to us Friday. Need to send to AZZ.
PlatCrs
102184
ELK10101-03 4/5 N/A N/A Florida Gas (FGT) N/A N/A 2 4' x 2' Platform (Bi-Di skid steps) X X n/a 0 0% 0 0 0% 0 0 0% 0 0 0% 0 ##### Big Elk X X X X X X X N/A Plat.Crs will delivery to us Friday. Need to send to AZZ.
PlatCrs
Energy Transfer Michael 101715 101715 101632
ELK10046-01 4/7 N/A 4/7 ETC 1 16" x 12" 600# FCV skid with Bypass (ANR) X X X 66 100% 0 77 90% 8 78 90% 8 46 90% 5 92% X X X X X X IP X X I&E in process.
(Rover CV skids) Fraser D&N D&N ISAM
Energy Transfer Michael 101715 101715 101632
ELK10046-02 4/7 N/A 4/7 ETC 3 16" x 12" 600# FCV skid w/o Bypass (ANR) X X X 198 100% 0 231 90% 23 234 90% 23 138 90% 14 92% X X X X X X IP X X I&E in process.
(Rover CV skids) Fraser D&N D&N ISAM
Energy Transfer Michael 16" x 10" FCV / OPP skid 101716 101716
ELK10084-01 4/7 N/A 4/7 ETC 1 X X X 94 100% 0 102 90% 10 88 0% 88 40 90% 4 68% X X X X Big Elk X X IP X X Missing CFM enclosure.
(Rover P/L) Fraser PEPL Meter Station - AFE#830000000103 D&N D&N
Energy Transfer Michael 102050
ELK10049-01 4/8 CFM ETC 3 16" 600# Ultrasonic Meter Skids X X 0 0% 0 228 50% 114 180 0% 180 108 90% 11 41% PAINT X X X Big Elk X X X X Paint Skids; 1 IP @ D&N. Missing CFM Actuators.
(Waha) Fraser D&N
Energy Transfer Michael
ELK10056-01 4/8 N/A N/A ETC 10 42" ANSI 600# MLV Settings (Comanche) n/a n/a n/a 2,750 80% 550 380 60% 152 0 0% 0 1,260 0% 1,260 55% X X X X X X Big Elk X X IP N/A X
(Waha) Fraser
Energy Transfer Michael 101714 101714
ELK10069-01 4/8 N/A ETC 1 10" x 8" Regulator Skid (RH) X X 96 100% 0 58 100% 0 47 0% 47 38 90% 4 79% X X X X Big Elk X X IP X X Ready for I&E installation.
(Waha) Fraser D&N D&N
Crate 102161 At ISAM for paint. (need to order crating)
ELK10098-01 4/11 N/A Instromet N/A N/A 3 8" 600# S/80 Uni-Directional USM Tube (Qty.3) X n/a 126 100% 0 111 0% 111 0 0% 0 42 0% 42 45% X X X X X X X IP N/A N/A
PO? ISAM Customer shop visit week of 4/11. Missing USM/CPA.
Crate 102161 At ISAM for paint. (need to order crating)
ELK10098-02 4/11 N/A Instromet N/A N/A 3 12" 600# S/40 Bi-Di USM Tube (Qty.3) X n/a 210 100% 0 168 0% 168 0 0% 0 72 0% 72 47% X X X X X X X IP N/A N/A
PO? ISAM Customer shop visit week of 4/11. Missing USM/CPA.
Energy Transfer Michael
ELK10099-01 4/15 N/A N/A ETC 7 42" MLV settings (Trans Pecos P/L, PF10-7) CFM n/a n/a 1,925 30% 1,348 266 0% 266 0 0% 0 882 0% 882 19% X X X X X X Big Elk X X X N/A At weld.
(Waha) Fraser
Energy Transfer Michael 48" x 42" Bi-Di Pig Traps (Trans Pecos P/L,
ELK10099-02 4/15 N/A N/A ETC 6 CFM n/a n/a 1,734 15% 1,474 282 0% 282 0 0% 0 612 0% 612 10% X X X X X X Big Elk X X X N/A At weld.
(Waha) Fraser PF10-6)
Universal/Pegasus UPI / 4" 300# Coriolis Meter Skid -
ELK10102-01 4/22 N/A 1 X 122 0% 122 111 0% 111 133 0% 133 54 0% 54 0% X X X APR APR Need to start in weld this week.
New Fortress NFE Montego Bay Station
Universal/Pegasus UPI / 4" x 2" 300# Coriolis Meter / Regulator Skid -
ELK10103-01 4/22 N/A 1 X 203 0% 203 165 0% 165 200 0% 200 70 0% 70 0% X X APR Need to start in weld this week.
New Fortress NFE Montego Bay Station
Universal/Pegasus UPI / 8"x6" 300# Startup Filter Skid - 102221
ELK10104-01 4/22 N/A N/A 1 X n/a 43 0% 43 38 0% 38 3 0% 3 26 0% 26 0% X X X APR N/A Need to start in weld this week.
New Fortress NFE Montego Bay Station D&N
Universal/Pegasus UPI / 12" x 8" 300# Receiver Skid - 102221
ELK10105-01 4/22 N/A N/A 1 X n/a 116 0% 116 59 0% 59 3 0% 3 45 0% 45 0% X X X APR N/A Need to start in weld this week.
New Fortress NFE Montego Bay Station D&N
Universal/Pegasus UPI / 12" x 8" 300# Launcher Skid - 102224 102224
ELK10105-02 4/22 N/A N/A 1 X n/a 116 0% 116 54 0% 54 3 0% 3 33 0% 33 0% X X X APR N/A Need to start in weld this week.
New Fortress NFE Montego Bay Station ABCO ABCO
Trans 102089 102206 On-site = 5/3. Missing CFM actuators. Need to contact
ELK10096-01 4/25 CFM 4/25 TransCanada Kevin Phillips 1 8" USM / FCV Skid - Killdeer Meter Station X 172 95% 9 139 0% 139 194 0% 194 56 0% 56 29% X X X Big Elk X C.P. C.P. C.P.
Canada D&N AZZ Building Solutions for insulation. (need sniffer ports)
Trans 4" x 2" Coriolis Buyback Meter Skid - Killdeer 102089 On-site = 5/3. Missing CFM actuators. Need to contact
ELK10096-02 4/25 CFM 4/25 TransCanada Kevin Phillips 1 X 58 95% 3 76 0% 76 118 0% 118 14 0% 14 21% X X X Big Elk X C.P. C.P. C.P.
Canada Meter Station D&N Building Solutions for insulation. (need sniffer ports)
ELK10108-01 4/25 N/A N/A Vintrol Inc. N/A N/A 2 6" Stem Extension - 84" long n/a n/a 10 0% 10 23 0% 23 0 0% 0 30 0% 30 0% X X X X X X X X N/A N/A N/A New Order!

ELK10108-02 4/25 N/A N/A Vintrol Inc. N/A N/A 1 8" Stem Extension - 84" long n/a n/a 5 0% 5 13 0% 13 0 0% 0 16 0% 16 0% X X X X X X X X N/A N/A N/A New Order!

ELK10108-03 4/25 N/A N/A Vintrol Inc. N/A N/A 2 12" Stem Extension - 84" long n/a n/a 11 0% 11 27 0% 27 0 0% 0 34 0% 34 0% X X X X X X X X N/A N/A N/A New Order!