Dri Capital Cost Details
Dri Capital Cost Details
Dri Capital Cost Details
)
Tel: +91 33 32555 039 Fax: +91 33 2321 2762 E-Mail: minop@hotmail.com
Date: 01/08/2007
To,
The Director,
BANKURA DRI MINING MANUFACTURERS (P) LTD
1, Maharshi Debendra Road,
Kolkata 700 007
Dear Sir,
Following the presentation made by us before the directors of DRI as regard the
feasibility of the development of “Biharinath Block”, it was agreed that both
“Minop” & “DRI” will enter into of memorandum of understanding for working
together.
For this purpose we requested you to define the responsibilities of “Minop” as well
as the obligation and responsibilities of “DRI”. Till date we have not received any
advice from you in this regard. However, as requested by you we have forwarded
another draft copy of memorandum of understanding prepared by us for your
considerations. We hope you are working with the “MOU” and we will be able to
hear from you shortly.
You also requested us to submit the cost break – up of the capital expenditures for
the activities to be incurred by “DRI” for the development of the block. The above
expenditures will mainly be for the activities and equipment which are immovable
assets. During our presentation we apprised that the above expenditures to be borne
by “DRI” as being the owner of the block.
Registered Office: 21, C.L.M. Lane, Raniganj – 713 347 (W.B.) Tel: +91 341 2449 113 Fax:+91
341 2446 477
Administrative Office: CL – 238, Salt Lake City, Sector – II, Kolkata – 700 091 (W.B.)
Tel: +91 33 32555 039 Fax: +91 33 2321 2762 E-Mail: milanparkeria@hotmail.com
The break – up of Rs.14110.00 lacs has been given in the annexure enclosed. Earlier
we had mentioned that the expenditures will be rs.13610.00 lacs but not cost was
included for the additional drilling and prospecting. The provision for rs.500.00 lacs
has been kept for that purpose as such the total capital expenditures for DRI will be
rs.14110.00.
I hope the above break up will help you to obtain investment approval from the
financial institutions.
Thanking You,
Yours Faithfully,
For Minop Innovative Technologies Pvt Ltd
(Director)
Rajiv Ganeriwala
Registered Office: Ganeriwala Bdg, 21, C.L.M. Lane, Raniganj – 713 347 (W.B.) Tel: +91 341 2449 113 Fax:+91 341
2446 477
Capital Expenditures
Sl. Particulars Amount
No. (Rs Lacs)
1 Land (annex I) 500.00
2 Non Residential Building (annex III) 350.00
3 Residential Building (annex IV) 1162.00
4A Mine Development (shaft sinking) (annex V) 2500.00
GRAND TOTAL IN Ha 70
Provision for fund Rs in lacs Rs.350.00
(70 Ha @ Rs.5.00 lacs / Ha)
Annexure VI
Roads & Culverts
Annexure V
Mine Development
Annexure XIII
Furniture & Fitting
Contingency 30.00
Total 616.00
Annexure X
Workshop Equipment
Sl. No. Particulars Amount Rs lacs
1 Medium Duty Lathe Lump sum
2 Radial Drill
3 Pillar Drill 75.00
4 Shaping Machine
5 Power Hand Saw
6 Measuring tools & tackles
7 Hand grinder
8 Hand drill
Electrical repair shop
9 Motor drying furnace
10 Cable vulcaniser
11 Potable relay testing equipment
12 Measuring & testing equipment
13 Megger
14 Cable fault detector
15 Welding Transformer
16 Oxygen acetylene gas cutting set
17 Hydraulic press
18 Master Tool kit for repair of hydraulic
equipment
19 Bearing heater induction type
20 E.O.T. crane
21 Hydraulic test bench
22 Heavy duty impact wrench
23 Tools & tackles
24 Black smith shop
Annexure XVI
Site Investigation & Scientific Studies
Annexure XV
Capital Expenditures on EMP
Sl.No. Particulars Amount (Rs.in lacs)
1 Community Development 500.00
2 EMP data generator Lump sum
3 EMP preparation cost
4 Anti pollution measurement
within the mine area
5 Anti pollution measurement in 135.00
township
6 Water tanker with sprinkling
7 Plantation in industrial area
Grand Total 635.00
Annexure XII
Miscellaneous Equipment
To,
The Director,
BANKURA DRI MINING MANUFACTURERS (P) LTD
1, Maharshi Debendra Road,
Kolkata 700 007
Dear Sir,
We thankfully acknowledge the receipt of your above letter. We are glad to know that you
are working seriously on the above project. In response to your queries raised we are
pleased to submit the following clarifications:
1. Cost of Production: We are not able to link from where you have derived the cost
of production of coal at Rs.706 per tonne. There is some misunderstanding
regarding the above cost. We like to draw your kind attention to our various
discussions held wherein it has been made amply clear by Mr.B.N.Pan that cost per
tonne of coal from Biharinath underground mines cannot be less than the notified
price of the coal India for that particular grade of coal available at Biharinath. Also
I would request you to reiterate our presentation. After the completion of the
presentation Mr.Sureka himself was convinced and confirmed that if the coal is
made available at price of Rs.1300 per tonne it will be great achievement. Hence we
request you to kindly try and recollect our discussions and please note that it is not
at all possible for us the deliver you coal at mine head for Rs.706/-.
2. Time Frame: As mentioned in our presentation the production of coal activities
will be taken up in phased manner. However, we can begin supply of coal to you
within 2 ½ years from the date of completion of formalities from your end and
handing over of mine site to us.
Registered Office: 21, C.L.M. Lane, Raniganj – 713 347 (W.B.) Tel: +91 341 2449 113 Fax:+91
341 2446 477
Administrative Office: CL – 238, Salt Lake City, Sector – II, Kolkata – 700 091 (W.B.)
Tel: +91 33 32555 039 Fax: +91 33 2321 2762 E-Mail: minop@hotmail.com
We once like to mention here that taking up underground mining activities requires lots of
skills and in-depth planning. However, we have tried to answer to your above queries to the
best possible manner.
Thanking You,
Yours Faithfully,
For Minop Innovative Technologies Pvt Ltd
(Rajiv Ganeriwala)
Director
Registered Office: Ganeriwala Bdg 21, C.L.M. Lane, Raniganj – 713 347 (W.B.) Tel: +91 341 2449 113 Fax:+91 341
2446 477