# Description Quantity UOM Unit Price (AED) Total Price (AED) Remarks

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

MFJO545/5 - Blasting Booth 04 Dec 2017

Attachment 1 to SRVLOP…….

# Description Quantity UOM Unit Price (AED) Total Price (AED) Remarks
1 Excavation and backfilling 187 m3 0.00
2 Polythene Sheet 13 m2 0.00
3 Road Base Laying, watering and compaction 1 Lumsum 0.00
4 PCC Concrete 4 m3 0.00
5 Footing and RCC beam concrete 8.5 m3 0.00
6 Solid Blockwall 23 m3 0.00
7 Block Wall with 1 mtr height 27 m3 0.00
8 Plastering of wall inside and out side 55 m2 0.00
9 Interlock fixing and mobelizing 182 m 2
0.00

0.00

Payment terms (30 days PDC, upon below activity completion)


1 0.00
2 0.00
3 0.00
4

Flooring Specification:
1. Cutting, filling and levelling of ground
2. Water flooding
3. Compacting using vibrators
4. 10 cm thick road base
5. Water flooding
6. Compacting using vibrators

Notes:
1. All activities shall be carried out as per Project Specifications, approved drawings and Government Specifications
2. Each activity shall be certified by Engineer in charge
3. Sub Contractor to comply METALFAB QHSE policy
4. Flexel and filling compound shall be provided by METALFAB FOC