12
bed room1 1 1 3.00 3.62 - 10.86
bed room1 1 1 1.65 1.15 - 1.90
bed room2 1 1 3.05 3.62 - 11.04
dining 1 1 4.55 3.90 - 17.75
dining 1 1 1.50 1.30 - 1.95
hall 1 1 3.60 4.65 - 16.74
hall 1 1 14.10 0.43 - 6.06
office 1 1 2.80 5.00 - 14.00
ded -1 1 2.25 0.75 - -1.69
ded -1 1 1.65 0.75 - -1.24
bedroom1 1 2 6.80 -- 2.62 35.63
CB sides 1 2 3.00 0.55 - 3.30
CB base & top 1 2 1.55 0.55 - 1.71
deduct door 1 -1 0.92 -- 2.13 -1.96
add sides of door 1 2 5.18 0.15 - 1.55
deduct w1 1 -2 1.52 -- 1.37 -4.16
deduct w2 1 -1 0.92 -- 1.37 -1.26
lobby side 1 2 1.45 3.00 - 8.70
deduct toilet door 1 -2 0.84 - 2.13 -3.58
bedroom 2 1 2 6.80 -- 2.62 35.63
CB sides 1 2 3.00 0.55 - 3.30
CB base & top 1 2 1.55 0.55 - 1.71
deduct door 1 -2 0.92 -- 2.13 -3.92
add sides of door 1 2 5.18 0.15 - 1.55
deduct window W1 1 -2 1.52 - 1.37 -4.16
deduct window W2 1 -2 0.92 -- 1.37 -2.52
lobby 1 2 1.30 2.75 - 7.15
deduct door 1 -2 0.92 -- 2.13 -3.92
lobby 1 2 1.30 2.75 - 7.15
deduct door 1 -2 0.84 -- 2.13 -3.58
living room 1 2 8.30 -- 2.62 43.49
deduct door 1 -1 1.22 -- 2.13 -2.60
add sides 1 2 5.48 0.15 - 1.64
deduct office door 1 -2 0.92 -- 2.13 -3.92
deduct opening 1 -2 1.80 -- 1.80 -6.48
deduct arch opening 1 0.5 3.14/4 1.80 1.80 -2.55
add for arch faces 1 3.14/ 1.80 0.23 - 0.41
CB sides 1 24 2.13 0.45 - 3.83
CB base & top 1 2 1.20 0.45 - 1.08
office & study room 1 2 7.88 2.62 41.29
deduct door 1 -2 0.92 - 2.13 -3.92
deduct D2 1 -1 1.00 - 2.13 -2.13
add sides 1 2 5.18 0.15 - 1.55
add sides 1 2 5.48 0.15 - 1.64
add CB sides 1 2 2.13 0.45 - 1.92
CB base & top 1 2 2.30 0.45 - 2.07
kitchen room 1 2 6.50 - 3.00 39.00
deduct D 1 -1 0.84 - 2.13 -1.79
deduct W1 1 -1 0.92 - 1.05 -0.97
deduct W2 1 -1 0.61 - 1.05 -0.64
CB base & top 1 2 2.20 0.45 - 1.98
kitchen 1 1 4.03 2.50 - 10.08
C.B in kitchen 3 2 0.62 - 1.92 7.14
C.B planks 1 3 2.30 - 0.62 4.28
Front elevation 1 1 8.78 - 3.20 28.10
Outer varandah ceiling 1 1 7.70 1.50 - 11.55
Ded door 2 1 1.20 - 2.10 -5.04
Ded W1 -1 1 0.87 1.35 - -1.17
Ded W2 -1 1 1.80 1.35 - -2.43
Ded V1 -1 1 4.33 0.60 - -2.60
Ded V2 -1 1 2.51 0.60 - -1.51
319 #REF!
sqm sqm
13 Supply and fixing cupboard shutters and frames using 18mm thick
one side laminated (Echoboard) particle board or equivalent
including fixing hardware like MS powder coated piano hinges of
size 18mm x 18mm, brass ball catchers, alluminum tower bolts and
handles, locks, fevicol, teak wood beading etc.,screws and nails
including cost and conveyance of all materials, labour charges, all
incidental and operational charges etc., complete for finished item of
Supply and fixing cupboard shutters and frames using 18mm thick
one side laminated (Echoboard) particle board or equivalent
including fixing hardware like MS powder coated piano hinges of
size 18mm x 18mm, brass ball catchers, alluminum tower bolts and
handles, locks, fevicol, teak wood beading etc.,screws and nails
including cost and conveyance of all materials, labour charges, all
incidental and operational charges etc., complete for finished item of
work at site as per the directions of the Engineer in charge.
Supply & fixing of Flymesh shtters of size 65mm x 20mm fly proof mesh
14 with G.I.fly proof wire mesh incuding cost and conveyance of all materials,
all taxes and labour charges etc. complete for finished item of work
Front door & back door & others 3 1 1.15 2.05 7.0725
7.07 #REF!
sqm
16 Supply and fixing of door frame made of hollow extruded PVC section (Nandi
or equivalent) having dimensions of 40 X 57mm with the wall thickness of
2mm +/- 0.2mm duly reinforced with seasoned wood plank at the hinges side.
The door frame top 2 corners shall be metri-cut/ welded. PVC DOOR FRAME
(Nandi or equivalent) and Supply and fixing of door shutters made of rigid
PVC extruded hollow section(Nandi or equivalent ) of 20mm X 200 mm with
the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue
and groove locking arrangements. The shutter frame is made of 58 X 24 mm
with the wall thickness of 1.5mm +/- 0.15mm section mitre-cut and joined at 4
corners with 125mm X 225mm plastic brackets. The shutter shall be
horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall
be reinforced inside the door shutter during the fabrication of the door shutter
at those points wherever the hardware is fixed on to the door shutter. PVC
DOOR SHUTTER (Nandi or equivalent )
C2 1 1 15 - - 15 75
rm rm
24 Removing 25.4 mm GI pipe and refixing the same BMW-I.79
C2 1 1 15 - - 15 112
rm rm
25 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm -
Prince/Sudhakar or any ISI Brand BMW-G.13
1 1 15.00 - - 15.00 484
m 3m
26 Supplying and Fixing European Water Closet of 1st quality conforming to
IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed
with 'P' trap BMD.13
2 1 - - - 2.00 1860
no each
27 Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked
conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/
Neycer - ISI Mark: 580 mm x 440 mm BMW.D-04
2 1 - - - 2.00 1584
no each
28 Supply & fixing drapery rods (25.4 mm) 1" x 21 G Powder coated with PVC rings BMT-G04
Living Room Entrance Main Door 1 1 1.37 - - 1.37
Living room window 1 1 1.89 1.89
Offc Room door from Living Room 1 1 1.10 1.10
Offc Room Main Door 1 1 1.90 1.90
Offc Room Window 1 1 1.15 1.15
Dining Room Arch 1 1 1.97 1.97
Dining To Offc Room Door 1 1 1.06 1.06
Dining To Kitchen door 1 1 0.95 0.95
Dining To Bathroom 1 1 1.28 1.28
Dining Window 1 1 1.93 1.93
Dining to Back Door 1 1 1.00 1.00
Bed Room Entrance Doors 2 1 0.85 1.70
Bed Room Windows-1 2 1 1.85 3.70
Bed Room Windows-2 2 1 1.10 2.20
23.20 128
rm m
29 a) S & F NP soap dish heavy type with NP SCREWS E
4 1 6.00 243
no each
30 Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm
3 1 3.00 513
no each
31 Supply & fixing towel rod (CP) of 24" long and 3/4 " dia
3 1 3.00 396
no each
32 Repairs to doors and windows by opening the shutters of doors and windows
by providing the necessary fixtures and refixing the same in position including
cost and conveyance of all materials complete for finished item of work as
directed by the Engineer -in- charge of the work
20 1 20.00 333
no each
33 Supplying & Fixing Indian make Flat Back Wash Hand Basin
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with
parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm
nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400
grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI
brackets including wooden block: 450 x 300 mm - Single C.P. Pillar cock
BMW-D.26
4 1 - - - 4 1550
no each
34 S&F 12.7 mm dia NP pillar cock heavy duty Ist quality Indian make Seiko/
Senior/ Nice or equivalent BMW-E.28
5 1 - - -5.00 611
no each
35 S & F 19.05 mm heavy duty NP stop cock Indian make with ISI mark Seiko/
Senior/ Nice or equivalent BMW-E.37
5 1 - - - 5.00 611
no each
36 Supplying & fixing stainless steel sink size 20" x18" x 8 "
(508x457.2x203.2mm) 1 mm thick with accessories BMW-I.123
kitchen 1 1 - - - 1.00 5396
no each
New Items
37 Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old
Wood Work & New Iron Work of approved brand and shade to give an even
shade after throughly brushing the surface to remove all dirt and remains of
loose powdered materials, including cost and conveyance of all materials to
work site and all operaional, incidental, labour charges etc., complete for
finished item of work
1 1 430.00 47
sqm sqm
40 P.C. C.(1:5:10) using 40mm nominal size SS5 gauge HBG metal as per SS 108
machine mixed laid in positon in layers not exceeding 15 CM in thickness
including cost, and conveyance of all materials and water from approved
sources to work site and all operational and incidental labour charges such as
mixing concrete, laying, tamping, curing etc., complete for finished item of
work as per SS 402 for foundations and flooring bed.
1 1 - - - 1 12867
no each
44 a) S& F 32 mm Nominal Bore GI pipe Light Grade properties & weight as per
IS 1239ISI mark with GI fittings including the cost of pipe & its fittings &
labour charges complete BMW-F.73
C2 1 1 20 - - 15 388
rm rm
Amount
150
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
362
0
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1782
372
2910
3185
6426
3165
1125
1680
7260
3720
ings BMT-G04
2970
1458
1539
1188
6660
6200
3055
3055
5396
2920
2785
20210
3521
11159
6000
12867
5820
#REF!
#REF!
#REF!
#REF!
300
5565
#REF!
VERNMENT OF ANDHRA PRADES
WORKING ESTIMATE
Adminstrative Sanction no. and Rs.6,06,000/-vide High Court ROC No. 327/2015 DII(B)
2) Dt.15.09.2016 of Registrar of High court of AP, Hyd.
amount
6) Name of contractor M/S HIS INFRA & EQUIPMENTS (P) Ltd., Jaggampeta
Supply & fixing of PVC low level system parry ware, slim As directed by completed
18 Engineer-in-Charge
line with internal components & short bend:
S & F CP Long body bib cock fancy type deluxe heavy As directed by completed
19 Engineer-in-Charge
duty 12.7 mm dia Indian make Seiko
As directed by completed
20 Engineer-in-Charge
Supply & fixing bib cock cum health faucet with 1 m long
flexible tube and wall hook of Jaquar make queen series
As directed by completed
21 Engineer-in-Charge
S& F 20 mm Nominal Bore GI pipe Light Grade properties
& weight as per IS 1239 ISI mark with GI fittings
Removing 19.05 mm GI pipe and refixing the sameBMW- As directed by completed
22 Engineer-in-Charge
I.78
Supplying and fixing TV shape mirror with plastic frame As directed by completed
28 Engineer-in-Charge
size 609.6 mm x 457 .2 mm
Supply & Fixing of Towel rod 24 " Jaquar make Queen As directed by completed
29 Engineer-in-Charge
series Ivory gold colour
As directed by completed
Repairs to doors and windows by opening the shutters of
30 Engineer-in-Charge
doors and windows by providing the necessary fixtures and
refixing the same
Supplying & Fixing Indian make Flat Back Wash Hand As directed by completed
31 Engineer-in-Charge
Basin (HSW/Parryware/ Neycer)
As directed by Completed
32 Engineer-in-Charge
S&F 12.7 mm dia NP pillar cock heavy duty Ist quality
Indian make Seiko/ Senior/ Nice or equivalent BMW-E.28
S & F 19.05 mm heavy duty NP stop cock Indian make As directed by completed
33 Engineer-in-Charge
with ISI mark Seiko/ Senior/ Nice or equivalent
As directed by completed
34 Engineer-in-Charge
Supplying & fixing stainless steel sink size 20" x18" x 8 "
(508x457.2x203.2mm) 1 mm thick with accessories
New Items
Painting with Synthetic Enamel paints - One Coat - for As directed by completed
35 Engineer-in-Charge
New Wood Work, Old Wood Work & New Iron Work
Painting with Synthetic Enamel paints - One Coat - old As directed by completed
36 Iron Work of approved brand and shade to give an even Engineer-in-Charge
shade
As directed by completed
Scraping the existing painting up to the plastering surface Engineer-in-Charge
37
by using the electrically operated mechanical scrapper
Supply and fixing of aniodised fixed and sliding window
frames completeusing
P.C. C.(1:5:10) with40mm
all required accessories(
nominal stopper,
size SS5 gauge HBG APSS No. 108 & 403 completed
38 bolts,
metal stripping etc with outer frame of of size 63.50 X
38.10 X 1.65mm (4688) and sliding track having single
groove with size of 61.85 X 31.75 X 1.30mm (8758) and As directed by completed
for sliding shutters the top and vertical rails of 40 X 18 X Engineer-in-Charge
39 1.55mm (8820) and locking rails of size 40 X 18X
1.45mm (8821) and shutters will mounted on nylon rollers
of lift type fixing with 5 mm tinted glass and aluminium
grill including
Providing cost and
& Placing on conveyance of floor
Terrace (at all all materials,
levels) labour As directed by completed
40 charges, all incidental and operational charges etc., Engineer-in-Charge
polyethylene waterstorage tank
complete for finished item of work at site as per the
Supplying and As directed by completed
41 directions of thedriving 50mm
Engineer double filter points 6'-0'' long
in charge.
at spacing of 10'-0'' intervals Engineer-in-Charge
a) S& F 32 mm Nominal Bore GI pipe Light Grade
properties & weight as per IS 1239ISI mark with GI As directed by completed
42 Engineer-in-Charge
fittings including the cost of pipe & its fittings & labour
charges complete BMW-F.73