Daily Activities Report 12-11-2017
Daily Activities Report 12-11-2017
Daily Activities Report 12-11-2017
Piping Activity
1 Continues tube RH fit up & weld inside boiler (LHS top) 12 joint 1 Continues tube RH fit up & weld inside boiler (LHS top) 12 joint 1 Continues tube RH fit up & weld inside boiler (LHS top) 12 joint
2 Continues Tube Instaiiation fit up and weld (RHS top) 12 joint 2 Continues Tube Instaiiation fit up and weld (RHS top) 12 joint 2 Continues Tube Instaiiation fit up and weld (RHS top) 12 joint
3 Continues tube RH fit up & weld inside boiler (Front top) 4 joint. 3 Continues tube RH fit up & weld inside boiler (Front top) 12 joint. 3 Continues tube RH fit up & weld inside boiler (Front top) 12 joint.
4 Continues machine beveling tube RHS/LHS & Front side top.
4 support.)
Continues machine beveling tube RHS/LHS top. (And outside Beveling for try to fit up gride 4 Continues machine beveling tube RHS/LHS & Front side top.
5 Continues spare part tube laydown area & Stock tube (for fit up Tube RH LHS top) (And outside Beveling LHS bottom for preparation fit up gride support.) (And outside Beveling LHS bottom for preparation fit up gride support.)
6 Continues machine beveling tube RHS/LHS top. 5 Continues spare part tube laydown area & Stock tube (for fit up Tube RH LHS top) 5 Continues spare part tube laydown area & Stock tube (for fit up Tube RH LHS top)
7 First fit up gride support LHS No.A06-14700-1101A (68 - 71) 6 Continues First fit up gride support LHS No.A06-14700-1101A (68 - 71) & weld. 4 Joint 6 Continues fit up gride support LHS bottom & weld. 4 joint
Total 4 4 0 0