Grease Interceptor
Grease Interceptor
Grease Interceptor
1530 S. West Temple, SLC, UT 84115 Building or P.U. Accela Permit # :________________________
l A Grease Interceptor connection and survey and inspection fee is required ($322.00 fee). Contact Development
Review if you have any questions. A Development Review signature approval is required on this form.
l The minimum sized Grease Interceptor permitted is 500 gallons. Maximum sized unit is 4000 gallons.
Enter Calculations X X X =
> Here
Step 1 Step 2 Step 3 Step 4 Step 5 Step 6
Number of Meals Per Peak Hour: Notes:
Seating Meal Factor Meals per
Capacity Peak Hour
x =
Note: The purpose of this worksheet is to assist the business in complying with permit submittal requirements. It is not a complete list of permit or code requirements and
should not be used as a substitute for applicable laws and regulations
http://www.slcgov.com/utilities/