Task 46!21!00-740-001-A Bite Test of The Atims
Task 46!21!00-740-001-A Bite Test of The Atims
Task 46!21!00-740-001-A Bite Test of The Atims
TITLE:
A/C Reg.:
46-21-00-740-001-A - BITE Test of the ATIMS
applicability_text
MECH. INSP.
TASK 46-21-00-740-001-A
BITE Test of the ATIMS
B. Referenced Information
REFERENCE DESIGNATION
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External Power
(Ref. 24-41-00-861-002-A-01). Energize the Aircraft Electrical Circuits from the APU
(Ref. 24-41-00-861-002-A-02). Energize the Aircraft Electrical Circuits from Engine 1(2)
De-energize the Aircraft Electrical Circuits Supplied from the
(Ref. 24-41-00-862-002-A). External Power
(Ref. 24-41-00-862-002-A-01). De-energize the Aircraft Electrical Circuits Supplied from the APU
De-energize the Aircraft Electrical Circuits Supplied from the
(Ref. 24-41-00-862-002-A-02). Engine 1(2)
Procedure to Get Access to the SYSTEM REPORT/TEST/INFO
(Ref. 31-32-00-860-013-A). SYS Page
(Ref. 31-60-00-860-001-A). EIS Start Procedure
(Ref. 31-60-00-860-002-A). EIS Stop Procedure
ATIMS SYSTEM TEST pages SHEET 1
3. Job Set-up
Subtask 46-21-00-861-072-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) .
Subtask 46-21-00-860-050-C
B. Aircraft Maintenance Configuration
(1) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001) .
(2) Do the procedure to get the SYSTEM REPORT/TEST/INFO SYS page
(Ref. AMM TASK 31-32-00-860-013) .
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 4
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:00
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-740-001-A
46-21-00 PB 501
TITLE:
A/C Reg.:
46-21-00-740-001-A - BITE Test of the ATIMS
applicability_text
MECH. INSP.
Subtask 46-21-00-865-050-A
C. Make sure that this(these) circuit breaker(s) is(are) closed:
ACTION RESULT
1.On MCDU 1:
· push the line key adjacent to the ATIMS On the MCDU 1:
indication. · the ATIMS page comes into view.
2.On the MCDU 1:
· push the line key adjacent to the SYSTEM On the MCDU 1:
TEST indication. · the TEST IN PROGRESS indication comes
ATIMS SYSTEM TEST pages SHEET 1 into view.
On the upper ECAM DU:
· the COM ACARS FAULT or DATALINK ATSU
FAULT warning comes into view then, goes out
of view after one minute approximately.
On the MCDU 1:
· the TEST OK indication comes into view at the
end of the test.
3.On the MCDU 1:
· push the line key adjacent to the RETURN
indication · the test procedure stops.
5. Close-up
Subtask 46-21-00-860-051-A
A. Put the aircraft back to its initial configuration.
(1) On the MCDU, push the line key adjacent to the RETURN indication until the CFDS menu
page comes into view.
(2) On the MCDU, fully decrease the brightness of the MCDU screen (display off).
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 4
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:00
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-740-001-A
46-21-00 PB 501
TITLE:
A/C Reg.:
46-21-00-740-001-A - BITE Test of the ATIMS
applicability_text
MECH. INSP.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 4
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:00
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-740-001-A
46-21-00 PB 501
TITLE:
A/C Reg.:
46-21-00-740-001-A - BITE Test of the ATIMS
applicability_text
MECH. INSP.
< >
< >
<
<
< >
< >
< *
* < *
N_MM_462100_5_AZMA_01_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 4
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:00
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE