Covering Slab
Covering Slab
Covering Slab
1 Err:509 m3 m3 Err:509
Err:509
2 Err:509 m3 m3 Err:509
Err:509
3 Err:509 m3 m3 Err:509
Err:509
4 Err:509 m3 m3 Err:509
Err:509
Err:509
13 Err:509 m3 m3 Err:509
Err:509
14 Err:509 No No Err:509
Err:509
15 1.000 No No Err:509
Err:509
16 Err:509 kg kg 3.17
Err:509
Err:509
Total
Service Tax-15%(40% of the Total Amount)
Sub total
Unforseen
Grand total
Rs. TWO LAKH FIFTY THOUSAND ONLY
E ELECTRICITY BOARD LIMITED
N SUB-DIVISION, POOVANTHURUTHU
Abstract
ting of Cable Trench ,Covering Slabs , foundation ,Structure and
uruthu
Amount
Err:509
Err:509
Err:509
Err:509
218218.26
57632.00
129896.00
11443.95
7640.40
804.83
4868.16
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
250,000.00
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs ,
foundation ,Structure and Yard fencing at 220kV Sub Station Poovanthuruthu
CONVEYANCE STATEMENT
Item No Description Place Road distance
1 Cement Kottayam 5km
2 Coarse sand/M Sand Kottayam 5km
Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , founda
Yard fencing at 220kV Sub Station Poovanthuruthu
Cost of 1 sqm
Item
Sl. No. No. IN
DATA Particulars Unit
BOOK /
CODE Details of cost for footing size 2.7mx2.7mx 1.00m
Contact area = 10.8 sqm.
MATERIAL:
Assuming shuttering material will become
unserviceable after use of 40 times, Adding for
maintenance @ 10% of cost, Taking salvage value
after full use of material @ 25% of cost Wall form
panel 1250x500 mm
Wall from panel 1250x500mm Qty taken for cost
7319 each
of using =0.34
Corner angle 45x45x5mm, 1.50m long Qty taken
7326 for cost of using = 0.085 each
Data for 1
sqm
Quantity Rate Amount
/1kg
Data for
1m2
488.52
3745.32
992.22
1284.87
5030.19
/1MT
1.05
1 kg
215.81
100.72
316.53
3.17
/1kg
1No
Amount
218218.26
57632.00
129896.00
11443.95
7640.40
804.83
4868.16
824.20
16439.20
36916.10
27550.00
60432.50
0.00
6845.30
49812.00
102980.00
133245.00
4712.00
61144.00
20792.10
33051.00
43447.50
36418.65
1065113.15
63906.79
1129019.94
-479019.94
650,000.00
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
Quantity
Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , foundation ,Struc
Yard fencing at 220kV Sub Station Poovanthuruthu
Sl.
No. Particulars No Length Breadth Hight
Add extra
Total
Centering and shuttering for for the repairing of trench and
covering slab as per the given measurement including
strutting, propping in finished condition etc. and removal of
form for Foundations, footings, bases of columns, etc. as per
the direction of dprt officers at site
Add extra
Total
6
Erection of GI Pipe for sign boards 2 75
Add extra
Total
Add extra
Total
tion ,Structure and
Total Unit
14.000 m3
1.013 m3
1.688 m3
5.000 m3
2.500 m3
24.201
1.799
26.000 m3
28.000
10.000
9.000
4.500
15.000
20.000
50.000
60.000
196.500
3.500
200.000 m2
1300.000
Kg
40.000
5.000
45.000 m2
3.400
0.600
4.000 m3
150.000
150.000
10.000
160.000 kg
180.000
180.000
10.000
190.000 Kg
sinle bay la ct cb pt iso total
110kv 2.2275 3.96 11.88 3.96 8.1 30.1275 482.04
66kv 2.2275 3.96 11.88 0 8.1 26.1675 261.675
220kv 2.2275 3.96 11.88 3.96 8.1 30.1275 180.765
916 column 2.85 293.55 293.55
fencing 450 585 585
964.9725 1803.03
103
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , foundation ,Structure
Yard fencing at 220kV Sub Station Poovanthuruthu
SUB DATA
Sl no. Code Description Unit Qty. Rate
3.4 of Cement mortar 1:4 (1 cement : 4 fine sand)
cpwd
2014
Amount
2394.00
35.97
1979.50
113.94
246.75
25.41
47.90
24.07
4867.54
48.68
4916.22
737.43
5653.65
2299.19
1565.53
7219.18
STRUCTURE
75X75X6
6.8 2.65 4 6 6.8
0.8 4 6 6.8
8.4 4 2 9
50X50X6
4.5 0.7 16 6 4.5
1.35 8 6 4.5
1.3 6 4.5
0.6 20 4.5
60X60X6
WEL 444/NO 30
LY 115/M 20
OV 199
432.48
130.56
604.8
302.4
291.6
35.1
54 1910.34 3.17 6055.778
59.4
15096
2300
2985
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTH
DATA
Name of work: Replacing of damaged Covering Slabs and Repiring the Cable Trench at 2
Poovanthuruthu - Data approval reg.
10
0100 Bandhani
0114 Beldar
overing Slabs and Repiring the Cable Trench at 220kV Sub Station
0.4667
1No
Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , foundation
,Structure and Yard fencing at 220kV Sub Station Poovanthuruthu
Sl.
No. Particulars No Length Breadth Hight
Add extra
Total
Centering and shuttering for for the repairing of
trench and covering slab as per the given
measurement including strutting, propping in
finished condition etc. and removal of form for
Foundations, footings, bases of columns, etc. as per
the direction of dprt officers at site
Add extra
Total
Add extra
Total
Add extra
Total
Dismantling steel work in built up sections in angles,
tees, flats and channels including all gusset plates,
bolts, nuts, cutting rivets, welding etc. including 1 250
dismembering and stacking within 50 metres lead.
8
Covering slabs
Add extra
Total
Removing dry or oil bound distemper, water
proofing cement paint and the like by scrapping,
sand papering and preparing the surface smooth 1 1800
including necessary repairs to scratches etc complete.
11
abs , foundation
u
Total Unit
14.000 m3
1.013 m3
1.688
5.000
2.500
24.201
0.799
25.000 m3
28.000
10.000
9.000
4.500
15.000
20.000
50.000
60.000
196.500
3.500
200.000 m2
1250.000
Kg
40.000
5.000
45.000 m2
2.550
0.200
2.750 m3
150.000
150.000
10.000
160.000 kg
180.000
180.000
10.000
190.000 Kg
250.000
250.000
10.000
260.000 Kg
1.563 m3
1.563
0.237
1.800 m3
700.000
700.000
78.000
778.000 Kg
1800.000
1800.000
100.000
1900.000 m2
m2
m2
m2
m2
m2
m2
m3
m4
118.22
5.3
626.566