1. APPLICATION AREAS
Foundation (Pearl Maison - Doha - Qatar) Metro Station (Riyad Metro Line 3)
Road Tunnel (Turecky Tunnel - Slovakia) Metro Tunnel (Farringdon station - Crossrail project -
London (UK)
UNDERGROUND
TECHNOLOGY
_2 BY MAPEI
2. CONSTRUCTION TYPOLOGIES
DRAINED TUNNELS (UMBRELLA SYSTEM)
Permanent drainage concept
Standard waterproofing system
UNDERGROUND
TECHNOLOGY
BY MAPEI _3
3. WATERPROOFING SYSTEM
3.1. PRE-INJECTION SYSTEM IN PRESENCE
OF WATER
*find all products range and field of application in specific injection synoptic
table.
PRE-INJECTION CONCEPT
Packer
Sheath
(cement+bentonite)
Sheath
Sleeved pipe
(cement+bentonite)
Sleeved pipe
Injected soil
UNDERGROUND
TECHNOLOGY
_4 BY MAPEI
3.2. SYNTHETIC WATERPROOFING MEMBRANE
According to the worldwide experiences (> 50 years) the nowdays most used
polymer is the PVC-P with a life expectancy higher than 100 years.
Mapei has developed in its own laboratories high performance PVC-P and
high flexible FPO membranes.
PVC-P FPO
High workability and good welding characteristics High workability and good welding characteristics
High resistance to root action and microbiological attak High resistance to root action and microbiological attak
Self-extinguish Self-extinguish
Suitable contact with both alkaline and acidic water Suitable contact with both alkaline and acidic water
Formulation without dangerous or harmful substances Formulation without dangerous or harmful substances
for human health and the environment for human health and the environment
UNDERGROUND
TECHNOLOGY
BY MAPEI _5
INNOVATIVE WARNING LAYER CONCEPT *
The thinner warning layer concept allows for the easier detection of any
damage, even when minimal. Such damage may occur during the installation
and/or during all of the subsequent working phases. Thus it helps safeguard
the integrity of the whole waterproofing system.
2. ANALYSIS OF RESULTS
The data analysis shows similar behaviour between the two membranes with
respect to mass loss. The membrane MAPEPLAN TU, on average, loses about
0.24 g after 600 revolutions. The membrane MAPEPLAN TU WL, on average,
loses about 0.21 g after 600 revolutions. The two different membranes, while
showing comparable mass losses near the surface. However, they exhibit a
significantly different visual characteristic in the underlying black layer (see
Pictures below).
3. CONCLUSIONS
The resistance to abrasion assessment according to UNI EN ISO 5470-1 of
the two membranes MAPEPLAN TU and MAPEPLAN TU WL shows a similar TU WL 20 TU S 20
performance (similar mass loss). However, by applying the same mechanical
action (600 revolutions) to the MAPEPLAN TU WL it is far easier to detect
damage to the membrane surface.
Test results
UNDERGROUND
TECHNOLOGY
_6 BY MAPEI
3.2.3. STANDARD AND TESTS
In order to provide CE certification, all MAPEPLAN products for tunnel
& underground structures are tested according to EN 13491 and
EN 13967 standards: Geosynthetic barriers Characteristics required for use
as a fluid barrier in the construction of tunnels and underground structures.
UNDERGROUND
TECHNOLOGY
BY MAPEI _7
CROSSRAIL PROJECT - Farringdon Station - London (UK)
UNDERGROUND
TECHNOLOGY
_8 BY MAPEI
UNDERGROUND
TECHNOLOGY
BY MAPEI _9
3.2.4. SYNTHETIC WATERPROOFING MEMBRANES SYSTEMS
CONSTRUCTION TYPOLOGIES
SYSTEM
DRAINED TUNNEL UNDRAINED TUNNEL FOUNDATION
(UMBRELLA SYSTEM) (FULL ROUND SYSTEM)
1L WS SYSTEM
1LP WS SYSTEM
2LP WS SYSTEM
Intermediate solutions are available and can be developed by MAPEI technical supervisors in order to supply
all technical requirements of a specific project.
1L WS - 1 LAYER / WATERSTOP
1L Single layer waterproofing membrane
WS Waterstop
Re-injectable hoses
UNDERGROUND
TECHNOLOGY
_10 BY MAPEI
1L WS - 1 LAYER / WATERSTOP
ADVANTAGE:
Primary compartmentalization
STRATIGRAPHY:
1. Substrate
2. Regularization layer - POLYDREN PP
3. Fixing disk- MAPEPLAN DISK
4. Waterproofing membrane - MAPEPLAN
5. Rebend connection - WATERSTOP
6. Back-up injection system (re-injectable hoses + end box) -
IDROSTOP MULTI + MAPEPLAN END BOX
7. MAPEPLAN drainage profile
6 3
UNDERGROUND
TECHNOLOGY
BY MAPEI _11
1LP WS 1 LAYER / PROTECTION / WATERSTOP
ADVANTAGES:
Primary compartmentalization
Injectable compartmentalization
STRATIGRAPHY:
1. Substrate
2. Regularization layer - POLYDREN PP
3. Fixing disk - MAPEPLAN DISK
4. Waterproofing membrane - MAPEPLAN
5. Protection layer (confinement of injection) -
MAPEPLAN PROTECTION
6. Injection valve + injectable hoses -
MAPEPLAN INJECTION VALVLE
7. Colleting - MAPEPLAN END BOX
8. Rebend connection - MAPEPLAN WATERSTOP
5 1
6
3
4
8
7
UNDERGROUND
TECHNOLOGY
_12 BY MAPEI
2LP WS - 2 LAYER / PROTECTION / WATERSTOP (VACUUM SYSTEM *)
ADVANTAGES:
Primary compartmentalization
Injectable compartmentalization
Testable before and after the realization of final lining (vacuum system)
STRATIGRAPHY:
1. Substrate
2. Regularization layer - POLYDREN PP
3. Fixing disk - MAPEPLAN DISK
4. Waterproofing membrane - MAPEPLAN
5. Separation layer MAPEPLAN SEPARATION LAYER
(or MAPEPLAN TU ST embossed membrane)
6. Waterproofing membrane (confinement of injection) - MAPEPLAN
7. Injection valve + injectable hoses + end box -
MAPEPLAN INJECTION VALVE
8. Protection layer- MAPEPLAN PROTECTION
9. Rebend connection - MAPEPLAN WATERSTOP
7
4
6 5
UNDERGROUND
TECHNOLOGY
BY MAPEI _13
VACUUM SYSTEM
COMPARTMENTALISATION / SECTORISATION
By using a double-layered system of PVC-P, in combination with waterstop,
injection valves, hoses, a tunnel waterproofing system can be divided and
compartmentalised into small independent watertight sections. The tunnel/
structure is therefore divided into manageable sections that can be treated
as individual entities.
This system allows us to test for water-tightness at locations suspected
of accidental damage, or in the case of leakage. Furthermore, the water
infiltrations would be limited to the single damaged section/compartment. Any
damage/leakage would remain localised, thus rendering easy rectification,
and thereby mitigating one of the major concerns with traditional PVC-P
applications. This compartmentalization forms this watertight control by
utilising the gap between the two waterproofing membrane layers. This gap
can be exploited to monitor the waterproofing system sealing and allows for
simple future repairs by resin injection.
VACUUM TESTING
The MAPEPLAN Vacuum waterproofing system allows us to objectively test
each section by removal of air between the two PVC-P layers (vacuum).
This testing can be performed several times during various critical stages of
construction:
UNDERGROUND
TECHNOLOGY
_14 BY MAPEI
FUTURE REPAIRS
Through the control and injection valves, it is possible, once the leak has
been identified, to repair the waterproofing system. This is possible even
where the repair is inaccessible (slab / foundation walls). Reparation of the
waterproofing is carried out by injecting a low viscosity resin into the space
between the PVC-P layers sealing any damage that may have occurred
during the construction phases. This type of intervention, through injection,
is minimally invasive, and guarantees limited and rapid intervention times,
thereby avoiding significant interruptions to underground operations.
MAPEPLAN TU S MAPEPLAN
SEPARATION LAYER MAPEPLAN TT
UNDERGROUND
TECHNOLOGY
BY MAPEI _15
LAGONEGRO TUNNEL - Highway A3 Salerno-Reggio Calabria - Italy
UNDERGROUND
TECHNOLOGY
_16 BY MAPEI
UNDERGROUND
TECHNOLOGY
BY MAPEI _17
3.2.5 TECHNICAL DRAWINGS
1L WS - 1 LAYER / WATERSTOP
11
9
10 8
UNDERGROUND
TECHNOLOGY
_18 BY MAPEI
1 Substrate (shotcrete)
2 Drainage layer
POLYFOND KIT
13 3 Regularization layer
POLYDREN PP
7 Protection layer
MAPEPLAN PROTECTION
8 Re-injectable hoses
IDROSTOP MULTI
9 Waterbar
MAPEPLAN WATERSTOP
13
10 Injection valve
MAPEPLAN INJECTION VALVE
12
11 Hoses collecting box
7 MAPEPLAN END BOX
4 3 12 Protection screed
13 Final lining
1
14 Compartment overlap detail
Welding
UNDERGROUND
TECHNOLOGY
BY MAPEI _19
2LP WS - 2 LAYER / PROTECTION / WATERSTOP (VACUUM SYSTEM) +
DRAINAGE LAYER*
11
9
10 8
5 6
4 3
11
9
10 8
6
5
4 3
UNDERGROUND
TECHNOLOGY
_20 BY MAPEI
1 Substrate (shotcrete)
2 Drainage layer
POLYFOND KIT
13
3 Regularization layer
POLYDREN PP
12
4 1st Synthetic waterproofing
membrane
7 MAPEPLAN / MAPEPLAN ST
2 5 Separation layer
MAPEPLAN SEPARATION LAYER
14 (compartment)
1
6 2nd Synthetic waterproofing
membrane
MAPEPLAN
7 Protection layer
MAPEPLAN PROTECTION
8 Re-injectable hoses
IDROSTOP MULTI
9 Waterbar
MAPEPLAN WATERSTOP
13 10 Injection valve
MAPEPLAN INJECTION VALVE
12
11 Hoses collecting box
MAPEPLAN END BOX
7
12 Protection screed
2 13 Final lining
14
1 14 Compartment overlap detail
Welding
UNDERGROUND
TECHNOLOGY
BY MAPEI _21
HIGH SPEED RALWAY MILAN-GENOA BASE TUNNEL - Italy
UNDERGROUND
TECHNOLOGY
_22 BY MAPEI
3.2.6 MAPEPLAN ACCESSORIES*
GEOTEXTILE * POLYDREN PP
POLYDREN PP HT Non-woven geotextile to be
*Different weights per square meters used as compensation, levelling,
available upon request
protection and filter layer.
UNDERGROUND
TECHNOLOGY
BY MAPEI _23
WATERSTOP * MAPEPLAN WATERSTOP
MAPEPLAN WATERSTOPS PVC profile designed to
type 4/20 width 320 mm waterproof joints and creates
type 4/20 width 320 mm
compartment.
type 4/30 width 250 mm
type 6/20 width 600 mm
type 6/30 width 500 mm
type 6/30 width 400 mm
Related products:
Plastic Connectors, Ventilation Hoses,
Hot-shrinkage Hoses
UNDERGROUND
TECHNOLOGY
_24 BY MAPEI
INJECTION HOSES MAPEPLAN INJECTION TUBE
Injectable hoses to inject and seal joints
and replacing waterproofing system.
Related products:
Plastic Connectors, Ventilation Hoses,
Hot-shrinkage Hoses
Related products:
Quick Fitting Connector 8-10 mm,
MAPEPLAN Injection Tube 6-8 mm
UNDERGROUND
TECHNOLOGY
BY MAPEI _25
MAPEPLAN CONIC COLLAR MAPEPLAN COLLAR
PVC ancillary product to
waterproof special detail.
UNDERGROUND
TECHNOLOGY
_26 BY MAPEI
HYDROPHILIC SWELLION PROFILE Bentonite, acrylic, polyurethane and
IDROSTOP BTN EPDM based hydrophilic swelling profile.
IDROSTOP CV
IDROSTOP PTZ
IDROSTOP E
UNDERGROUND
TECHNOLOGY
BY MAPEI _27
MTRC - Hong Kong
UNDERGROUND
TECHNOLOGY
_28 BY MAPEI
3.2.7 INSTALLATION TOOLS
UNDERGROUND
TECHNOLOGY
BY MAPEI _29
RED LINE METRO STATION - Doha - Qatar
UNDERGROUND
TECHNOLOGY
_30 BY MAPEI
3.2.8 RISK MITIGATION: CHECK LIST FOR
WATERPROOFING (INSPECTION, WELDING TESTS)
1. ACCEPTANCE OF SUBSTRATE
Verify the compatibility of membrane flexibility
with shotcrete evenness
Substrate smooth, clean as specified
1 Substrate
b 5a
3m
Ra
0,
0,0
a
03 m
Ra
2. LEVELLING LAYER
Verify type (PP) and quality (500 g/mq) of the layer
(according to the substrate)
Verify that lapped are correct
1 Substrate
2 Regularization layer
POLYDREN PP
2
1
UNDERGROUND
TECHNOLOGY
BY MAPEI _31
3. FIXING ELEMENTS
Use an appropriate fixing element (preventive failure of the disk
prevent any possible laceration of the membrane)
Verify number and position of the disk
1 Substrate
2 Regularization layer
POLYDREN PP
3 Fixing element
MAPEPLAN DISK
2 3
4. WATERPROOFING MEMBRANE
Verify type (PVC-P), quality, length and mechanical characteristics
of the membrane
Verify that lapped are correct(overlap 10-12 cm)
Verify that membrane between fixing elements is not in tension
1 Substrate 4 Waterproofing membrane
MAPEPLAN
2 Regularization layer
POLYDREN PP
3 Fixing element
MAPEPLAN DISK
4 3
2
UNDERGROUND
TECHNOLOGY
_32 BY MAPEI
5. WATERSTOP
Verify Waterstops position
Verify that Waterstops are clean and free of residue
Verify welds with a hook
1 Substrate
4 Waterproofing membrane
MAPEPLAN
2 Regularization layer
POLYDREN PP 5 Waterstop
MAPEPLAN WATERSTOP
3 Fixing element
MAPEPLAN DISK
2 4 3
6. PROTECTION LAYER
Verify typologies, quality and thickness of the membrane
1 Substrate
4 Waterproofing membrane
MAPEPLAN
2 Regularization layer
POLYDREN PP 5 Waterstop
MAPEPLAN WATERSTOP
3 Fixing element
5
6
2 4 3
UNDERGROUND
TECHNOLOGY
BY MAPEI _33
7. WELDING OF THE MEMBRANE
Verify that heating wedges are clean
Verify that membrane is clean
Verify the setup of welding machine: temperature, speed,
and pressure
Verify the correct realization of joints
8. WELDING INSPECTION
Double weld According to the supplier Every joint Pressure drop not to be greater
seam joints guidelines than 10% when a 2 bar pressure is
applied for 10 minutes
Single weld According to the supplier Every hand weld Hook test (*)
guidelines
Single weld According to the supplier Every patch Hook test and Vacuum bell test
guidelines (flatness permitting) (**)
UNDERGROUND
TECHNOLOGY
_34 BY MAPEI
I II III IV V
Visual inspection Manual Test Using a Hook Compressed air test Vacuum Bell Test Vacuum Pump Test
double welding joints/patch
I Visual inspection.
After welding, all seams should be visually inspected for good workmanship.
Special attention should be paid to T-joints, penetrations and flashings.
UNDERGROUND
TECHNOLOGY
BY MAPEI _35
IV Vacuum Pump Test.
This test is for testing each compartment prior to casting. To test and control
the membrane surfaces and relative welding of each compartment the
following procedure must be followed:
Identify and number the compartment to be tested.
For each compartment (200 to 250 m2), 4 to 5 valves need to be
installed. To one of these valves must be attached a hose and vacuum
pump. The remaining valves must be hermetically sealed (airtight).
Start the vacuum pump, run until the pressure drop is in the region
0.5-0.6 bar.
Wait until the reading remains stable (1 minute).
Record the initial test pressure (about 0.5-0.6 bar). Wait approximately
10 minutes and take note of the final pressure.
The test passes if the difference between the initial and final pressure
is lower than, or equal to 20%.
Through this vacuum test it is possible to check the integrity of the
waterproofing work. Also it is possible to identify and rectify defects with
minimal time and cost implications.
UNDERGROUND
TECHNOLOGY
_36 BY MAPEI
3.3. POST-INJECTION SYSTEM
WHERE TO USE
1. Sealing of punctual water inflow
UNDERGROUND
TECHNOLOGY
BY MAPEI _37
BACK-UP SYSTEM CONCEPT
Replacing waterstop and sealing joints with acrylic resin injection or
low viscosity PU gel (using re-injectable hoses).
Acrylic or low viscosity PU gel injection with valve inside
compartments made with synthetic waterproofing membrane.
3 1
1 Compartment
4 Injection hoses
2 Acrylic resin ti inject the 5 Collecting hoses box
compartment MAPEPLAN END BOX
MAPEGEL UTT SYSTEM
3 Injection valve
MAPEPLAN INJECTION VALVE
4 3
1 2
UNDERGROUND
TECHNOLOGY
_38 BY MAPEI
3.4. SPRYABLE WATERPROOFING MEMBRANE AND
SYNTHETIC WATERPROOFING MEMBRANE
UNDERGROUND
TECHNOLOGY
BY MAPEI _39
RED LINE METRO STATION - Doha - Quatar
UNDERGROUND
TECHNOLOGY
_40 BY MAPEI
MAPEI UTT
Underground Technology Team
SUPPLIER OF ...
HEADQUARTERS
MAPEI SpA
Via Cafiero, 22 - 20158 Milan
Tel. +39-02-37673.1
Fax +39-02-37673.214
Internet: www.mapei.com
E-mail: mapei@mapei.it /mapeispa