Makkah Clock Tower - Mecca Saudi Arabia
Makkah Clock Tower - Mecca Saudi Arabia
Makkah Clock Tower - Mecca Saudi Arabia
The Makkah Clock Tower project was a 50,000 ft (4,500 m) project that required over
10,000 gallons of Thermo-Lag 3000-P. The specification called for a 2 hour UL 1709
hydrocarbon rating for the structural steel beams and column supports. Thermo-Lag
3000-P was able to meet this specification at 310 mils (7.9 mm).
All the steel was primed with Carbomastic 15 and the Thermo-Lag 3000-P was topcoated
with Carboguard 1340 / Carbothane 133 HB for superior weather resistance.
Project Challenge:
This project is a very visible, high profile application. Attaining the highest quality and
aesthetic finish possible was paramount. The specification called for a smooth consistent
finish.
This low thickness requirement translates into tremendous labor savings to install and
overall weight savings to the structure. Thermo-Lag 3000-P had at least a 40% thickness
advantage over closest competitor giving savings in weight and enabling our overall
material cost to be attractive.