The contractor will repair existing showers at five stalls in the second floor women's bathroom at the OMH Pilgrim Psychiatric Center. This will involve removing and replacing shower bodies, shower surrounds, and accessories. Work must be completed in phases and coordinated with the on-site construction team, following general safety and approval requirements.
The contractor will repair existing showers at five stalls in the second floor women's bathroom at the OMH Pilgrim Psychiatric Center. This will involve removing and replacing shower bodies, shower surrounds, and accessories. Work must be completed in phases and coordinated with the on-site construction team, following general safety and approval requirements.
The contractor will repair existing showers at five stalls in the second floor women's bathroom at the OMH Pilgrim Psychiatric Center. This will involve removing and replacing shower bodies, shower surrounds, and accessories. Work must be completed in phases and coordinated with the on-site construction team, following general safety and approval requirements.
The contractor will repair existing showers at five stalls in the second floor women's bathroom at the OMH Pilgrim Psychiatric Center. This will involve removing and replacing shower bodies, shower surrounds, and accessories. Work must be completed in phases and coordinated with the on-site construction team, following general safety and approval requirements.
Download as RTF, PDF, TXT or read online from Scribd
Download as rtf, pdf, or txt
You are on page 1of 1
Detailed Scope of Work
Scope Date: 02/17/2017 Revised Scope Date:
Job Order Number: JEM-GC1-OAS-183.00 Project Name: Repair of Existing Showers at 2nd floor Women's Bathroom Rm #014 Project Location: OMH Pilgrim Psychiatric Center Contractor: Jemco Electrical Contractors, Inc. Detailed Scope of Work 1. Introduction: The scope described herein formally instructs the Contractor to furnish all material, labor, equipment and services to perform repair to the existing showers at the Women's Bathroom Rm # 014 located on the 2nd floor. The work described herein is to be completed at a total of five (5) stalls - four (4) standard and one (1) handicapped accessible stall. 2. Detailed Scope: Contractor shall be responsible to effectively perform the following tasks outlined in this section: a. Remove and store all the grab bars, shower appurtenances and accessories for re-use from the stalls. b. Demolish and remove the existing shower surrounds. c. Remove existing shower bodies and replace them with new shower bodies. d. Furnish and install new shower surrounds including any additional roughing required to fit the existing framing. e. Re-install the existing grab bars, shower appurtenances and accessories. f. Furnish and install defective miscellaneous items encountered during construction due to the unforeseen conditions after obtaining approval from DASNY's Construction Project Manager. 3. General Requirements This section indicates the following general and project specific requirements discussed during the Joint Scope Meeting: a. Contractor is responsible to field verify all measurements before procuring the materials. b. Construction is planned to be executed in phases and Contractor is to coordinate with DASNY's Construction Project Manager. c. Working hours for the construction work are 8:00 AM to 4:00 PM. d. Contractor is to coordinate with DASNY's on site Construction Team for obtaining any storage and staging area. e. Contractor shall submit the relevant cut sheets, product data sheets, etc. to DASNY's Construction Team for approval and shall not install any material without approval. f. Contractor shall not perform any work without notifying and coordinating with DASNY's Construction Please reference the Request for Proposal for additional information regarding this job order.