Daily Report: 03 YG 00400 23-Jun-2017 Friday DPR-387
Daily Report: 03 YG 00400 23-Jun-2017 Friday DPR-387
Daily Report: 03 YG 00400 23-Jun-2017 Friday DPR-387
Test
Sample
Taken
LTI Free Day UA,UC Near Miss FAI MTC LTA Daily TBT
HSE Conducted By
Safety Officer
Works Carried out Details
Trades Of Work Location Remark
1 Install decking sheet at 1st floor At grid (B-C)
2 Install main beam at 2nd to 4th floor At grid (A)
3 Tightening bolt & nuts at 1st and 2nd Floor At grid (A-B)
4 Welding work at deck sheet at 1st floor At grid (B-C)
5 Pump water at passenger lift and car lift area
6 Removed unnecessary materials from site
7 Housekeeping work
8 25 Trace departed from site
Special Event
Visitors Site
Purpose
on site Instruction