ANALISA HARGA SATUAN PEKERJAAN

1 1 M Galian Tanah Biasa Sedalam 1,00 Meter (SNI 5.1)

No. : Uraian Satuan Kuantitas

I TENAGA
1 Pekerja Oh 0.7500
2 Mandor Oh 0.0250

Jumla
Overhead + Profit 10%
Total Jumla
2 1 M Urugan Kembali (SNI 6.9)

No. : Uraian Satuan Kuantitas

I TENAGA
1 Pekerja Oh 0.1920
2 Mandor Oh 0.0192

Jumla
Overhead + Profit 10%

3 1 M Urugan Pasir (SNI 6.11)

No. : Uraian Satuan Kuantitas

I BAHAN
1 Pasir Urug M 1.2000

II TENAGA
1 Pekerja Oh 0.3000
2 Mandor Oh 0.0100

Jumla
Overhead + Profit 10%
Total Jumla

4 1 M Pasangan Batu Bata tebal 1/2 bata 1 Pc : 5 Ps (SNI 2007)

No. : Uraian Satuan Kuantitas

I BAHAN
1 Bata Merah 5 x 11 x 22 M 70.0000
2 Semen / PC (@ 50 Kg) Zak 0.1936
3 Pasir Pasang M 0.0450

II TENAGA
1 Pekerja Oh 0.3000
2 Tukang Batu Oh 0.1000
3 Kepala Tukang Oh 0.0100
4 Mandor Oh 0.0150

Jumla
Overhead + Profit 10%
Total Jumla

5 1 M Plesteran 1 Pc : 6 Ps t = 15 mm (SNI 2007)


No. : Uraian Satuan Kuantitas

I BAHAN
1 Semen / PC (@ 50 Kg) Zak 0.0883
2 Pasir Pasang M 0.0270

II TENAGA
1 Pekerja Oh 0.3000
2 Tukang Batu Oh 0.1500
3 Kepala Tukang Oh 0.0150
4 Mandor Oh 0.0150

Jumla
Overhead + Profit 10%
Total Jumla
6 1 M Acian Semen 1 Pc : 3 Ps + Pasta Semen t = 15 mm (SNI 6.3)

No. : Uraian Satuan Kuantitas

I BAHAN
1 Semen / PC (@ 50 Kg) Zak 0.2300

II TENAGA
1 Pekerja Oh 0.2000
2 Tukang Batu Oh 0.1500
3 Kepala Tukang Oh 0.0150
4 Mandor Oh 0.0100

Jumla
Overhead + Profit 10%
Total Jumla
1 M Pekerjaan Rabat Beton 1 Pc : 3 Ps : 5 Kr (SNI 6.1)
7
No. : Uraian Satuan Kuantitas

I BAHAN
1 Semen / PC (@ 50 Kg) Zak 4.6000
2 Pasir Beton M 0.5200
3 Batu Beton /Bt. Pecah 2/3 Cm M 0.8700

II TENAGA
1 Pekerja Oh 1.2000
2 Tukang Batu Oh 0.2000
3 Kepala Tukang Oh 0.0200
4 Mandor Oh 0.0600

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pekerjaan Beton 1 Pc : 2 Ps : 3 Kr (SNI 6.5)


8
No. : Uraian Satuan Kuantitas

I BAHAN
1 Semen / PC (@ 50 Kg) Zak 4.6400
2 Pasir Beton M 0.5200
3 Batu Beton /Bt. Pecah 2/3 Cm M 0.7800

II TENAGA
1 Pekerja Oh 1.6500
2 Tukang Batu Oh 0.2500
3 Kepala Tukang Oh 0.0250
4 Mandor Oh 0.0800

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pekerjaan Sloef Beton 1 Pc : 2 Ps : 3 Kr ( 90 kg + Bekisting ) (SNI 6.39)


9
No. : Uraian Satuan Kuantitas

I BAHAN
1 Kayu Terentang M 0.2700
2 Paku Campuran Kg 2.0000
3 Besi Beton Polos Kg 90.0000
4 Kawat Beton Kg 3.0000
5 Semen / PC (@ 50 Kg) Zak 6.4600
6 Sirtu M 0.5200
7 Kerikil/Koral M 0.7800

II TENAGA
1 Pekerja Oh 4.8500
2 Tukang Batu Oh 0.3500
3 Tukang Kayu Oh 1.5600
4 Tukang Besi Oh 1.4000
5 Kepala Tukang Oh 0.3310
6 Mandor Oh 0.1700

Jumla
Overhead + Profit 10%
Total Jumla
1 M Pekerjaan Pondasi Siklop 40% Batu Kali (SNI DT -91)
10
No. : Uraian Satuan Kuantitas

I BAHAN
1 Batu Belah 15/20 cm M 0.4800
2 Semen / PC (@ 50 Kg) Zak 3.8800
3 Pasir Beton M 0.3120
4 Kerikil/Koral M 0.4680
5 Besi Beton Polos Kg 126.0000
6 Kawat Beton Kg 1.8000

II TENAGA
1 Pekerja Oh 3.4000
2 Tukang Batu Oh 0.8500
3 Kepala Tukang Oh 0.0850
4 Mandor Oh 0.1700

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pekerjaan Kolom Beton 1 Pc : 2 Ps : 3 Kr ( 100 Kg + Bekisting ) (SNI 6.40)


11
No. : Uraian Satuan Kuantitas

I BAHAN
1 Kayu Terentang M 0.4000
2 Paku Campuran Kg 4.0000
3 Minyak Bekisting Ltr 2.0000
4 Besi Beton Polos Kg 100.0000
5 Kawat Beton Kg 4.5000
6 Semen / PC (@ 50 Kg) Zak 6.4600
7 Pasir Beton M 0.5200
8 Kerikil/Koral M 0.7800
9 Kayu Klas II 5/5 M 0.1500
10 Tripleks 3 mm Lbr 2.8000

II TENAGA
1 Pekerja Oh 7.3000
2 Tukang Batu Oh 0.3500
3 Tukang Kayu Oh 3.3000
4 Tukang Besi Oh 2.1000
5 Kepala Tukang Oh 0.5700
6 Mandor Oh 0.2500

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pekerjaan Balok Beton 1 Pc : 2 Ps : 3 Kr ( 150 Kg + Bekising ) (SNI 6.41)


12
No. : Uraian Satuan Kuantitas

I BAHAN
1 Kayu Terentang M 0.3200
2 Paku Campuran Kg 3.2000
3 Minyak Bekisting Ltr 1.6000
4 Besi Beton Polos Kg 150.0000
5 Kawat Beton Kg 3.0000
6 Semen / PC (@ 50 Kg) Zak 6.4600
7 Pasir Beton M 0.5200
8 Kerikil/Koral M 0.7800
9 Kayu Balok M 0.1400
10 Tripleks 3 mm Lbr 2.8000
11 Dolken 8 cm - 4 m Btg 0.1600

II TENAGA
1 Pekerja Oh 5.9600
2 Tukang Batu Oh 0.3500
3 Tukang Kayu Oh 2.8000
4 Tukang Besi Oh 1.4000
5 Kepala Tukang Oh 0.4550
6 Mandor Oh 0.2080

Jumla
Overhead + Profit 10%
Total Jumla
1 M Pekerjaan Ring Balok Beton 1 Pc : 2 Ps : 3 Kr ( 90 Kg +Bekisting ) (SNI 6.42)
13
No. : Uraian Satuan Kuantitas

I BAHAN
1 Kayu Terentang M 0.3200
2 Paku Campuran Kg 3.2000
3 Minyak Bekisting Ltr 1.6000
4 Besi Beton Polos Kg 90.0000
5 Kawat Beton Kg 2.2500
6 Semen / PC (@ 50 Kg) Zak 6.4600
7 Pasir Beton M 0.5200
8 Kerikil/Koral M 0.7800
9 Kayu Balok M 0.1200
10 Ptripleks 3 mm Lbr 2.8000
11 Dolken 8 cm - 4 m Btg 0.1600

II TENAGA
1 Pekerja Oh 5.8000
2 Tukang Batu Oh 0.3500
3 Tukang Kayu Oh 2.8000
4 Tukang Besi Oh 1.0500
5 Kepala Tukang Oh 0.4200
6 Mandor Oh 0.1850

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pekerjaan Plat Beton 1 Pc : 2 Ps : 3 Kr ( 90 Kg + Bekisting ) (SNI 6.44)


14
No. : Uraian Satuan Kuantitas

I BAHAN
1 Kayu Terentang M 0.2500
2 Paku Campuran Kg 3.0000
3 Minyak Bekisting Ltr 1.2000
4 Besi Beton Polos Kg 90.0000
5 Kawat Beton Kg 3.0000
6 Semen / PC (@ 50 Kg) Zak 6.4600
7 Pasir Beton M 0.5200
8 Kerikil/Koral M 0.7800
9 Kayu Balok M 0.1050
10 Tripleks 3 mm Lbr 2.5000
11 Dolken 8 cm - 4 m Btg 0.0800

II TENAGA
1 Pekerja Oh 5.6000
2 Tukang Batu Oh 0.3500
3 Tukang Kayu Oh 2.3000
4 Tukang Besi Oh 1.4000
5 Kepala Tukang Oh 0.4050
6 Mandor Oh 0.2020

Jumla
Overhead + Profit 10%
Total Jumla
1 M Pekerjaan Lantai Keramik 30 x 30 cm (SNI 6.10)
15
No. : Uraian Satuan Kuantitas

I BAHAN
1 Tegel Keramik 30 x 30 M2 1.0000
2 Semen / PC (@ 50 Kg) Zak 0.2000
3 Pasir Pasang M 0.0215
4 Semen Warna Kg 1.5000

II TENAGA
1 Pekerja Oh 0.2600
2 Tukang Batu Oh 0.1250
3 Kepala Tukang Oh 0.0125
4 Mandor Oh 0.0130

Jumla
Overhead + Profit 10%
Total Jumla
1 M Pasang Konstruksi Kayu Kls. II (SNI )
16
No. : Uraian Satuan Kuantitas

I BAHAN
1 Balok Kayu Kls. I M 1.1000
2 Besi Strip Kg 15.0000
3 Paku Ukuran 5 - 12 Cm Kg 0.1000

II TENAGA
1 Pekerja Oh 4.0000
2 Tukang Kayu Oh 12.0000
3 Kepala Tukang Oh 1.2000
4 Mandor Oh 0.2000

Jumla
Overhead + Profit 10%
Total Jumla
1 M Pasang Gording Kayu Kls. II (SNI )
17
No. : Uraian Satuan Kuantitas

I BAHAN
1 Balok Kayu Kls. II M 1.1000
2 Paku Ukuran 5 - 12 Cm Kg 4.0000

II TENAGA
1 Pekerja Oh 4.0000
2 Tukang Kayu Oh 12.0000
3 Kepala Tukang Oh 1.2000
4 Mandor Oh 0.2000

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pasang Lisplank Kayu Kls. II (SNI )


18
No. : Uraian Satuan Kuantitas

I BAHAN
1 Papan Kayu Kls. II M 0.0145
2 Paku Ukuran 5 - 12 Cm Kg 0.0600

II TENAGA
1 Pekerja Oh 0.1500
2 Tukang Kayu Oh 0.2500
3 Kepala Tukang Oh 0.0250
4 Mandor Oh 0.0750

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pasang List Profil Kayu (SNI )


19
No. : Uraian Satuan Kuantitas

I BAHAN
1 List Profil kayu M 1.0500
2 Paku Campuran Kg 0.0200

II TENAGA
1 Pekerja Oh 0.0210
2 Tukang Kayu Oh 0.0210
3 Kepala Tukang Oh 0.0020
4 Mandor Oh 0.0010

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pasangan Rangka Plafond Kayu Kls. II (SNI 6.39)


20
No. : Uraian Satuan Kuantitas

I BAHAN
1 Balok 4/6 cm, Kls. II M 0.0120
2 Paku Campuran Kg 0.1000

II TENAGA
1 Pekerja Oh 0.1500
2 Tukang Kayu Oh 0.2500
3 Kepala Tukang Oh 0.0250
4 Mandor Oh 0.0750

Jumla
Overhead + Profit 10%
Total Jumla
1 M Pasangan Plafond Gypsum Board t = 9 mm (SNI 6.24)
21
No. : Uraian Satuan Kuantitas

I BAHAN
1 Gypsum Board Lbr 1.0000
2 Paku Kg 0.1100

II TENAGA
1 Pekerja Oh 0.4000
2 Tukang Kayu Oh 0.0500
3 Kepala Tukang Oh 0.0050
4 Mandor Oh 0.0050

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pasangan Pintu, Jendela Jalusi Kayu, Kls. II (SNI 2007)


22
No. : Uraian Satuan Kuantitas

I BAHAN
1 Papan Kayu Kls II T : 5 cm M 0.0640
2 Lem Kayu Kg 0.5000

II TENAGA
1 Pekerja Oh 0.8000
2 Tukang Kayu Oh 2.0000
3 Kepala Tukang Oh 0.2000
4 Mandor Oh 0.0400

Jumla
Overhead + Profit 10%
Total Jumla

1 M Daun Jendela & Pasangan Kaca t = 5 mm (SNI 6.17)


23
No. : Uraian Satuan Kuantitas

I BAHAN
1 Kaca 5 mm M 1.1000
2 Lem Kayu Kg 0.3000

II TENAGA
1 Pekerja Oh 0.0150
2 Tukang Kayu Oh 0.1500
3 Kepala Tukang Oh 0.0150
4 Mandor Oh 0.0008

Jumla
Overhead + Profit 10%
Total Jumla
1 M Pasangan Kusen Pintu dan Jendela Kayu Kls. I (SNI 6.1)
24
No. : Uraian Satuan Kuantitas

I BAHAN
1 Balok 6/12 cm M 1.1000
2 Paku 10 cm Kg 1.2500
3 Lem Kayu Kg 1.0000

II TENAGA
1 Pekerja Oh 6.0000
2 Tukang Kayu Oh 18.0000
3 Kepala Tukang Oh 2.0000
4 Mandor Oh 0.3000

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pasangan Pintu Panil Kayu Kls. I (SNI 6.1)


25
No. : Uraian Satuan Kuantitas

I BAHAN
1 Papan Kayu Kls I M 0.0400
2 Lem Kayu Kg 0.5000

II TENAGA
1 Pekerja Oh 1.0000
2 Tukang Kayu Oh 2.5000
3 Kepala Tukang Oh 0.2500
4 Mandor Oh 0.0500

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pasang Atap Seng Gelombang


26
No. : Uraian Satuan Kuantitas

I BAHAN
1 Seng Gelombang 80 x 180 cm Lbr 0.7000
2 Paku Seng Lbr 0.0200

II TENAGA
1 Pekerja Oh 0.1200
2 Tukang Kayu Oh 0.0600
3 Kepala Tukang Oh 0.0060
4 Mandor Oh 0.0060

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pasang Atap Nok Seng


27
No. : Uraian Satuan Kuantitas

I BAHAN
1 Nok Seng Setengah Lingkaran Lbr 0.3000
2 Paku Seng Lbr 0.0400

II TENAGA
1 Pekerja Oh 0.1500
2 Tukang Kayu Oh 0.0700
3 Kepala Tukang Oh 0.0080
4 Mandor Oh 0.0060

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pasang Atap Nok Campuran


28
No. : Uraian Satuan Kuantitas

I BAHAN
1 Paku biasa 2" - 5" Lbr 0.0500
2 Semen putih Kg 10.8000
3 Pasir Pasang M 0.0320
4 Semen Warna Kg 1.0000

II TENAGA
1 Pekerja Oh 0.1500
2 Tukang Kayu Oh 0.0700
3 Kepala Tukang Oh 0.0080
4 Mandor Oh 0.0060

Jumla
Overhead + Profit 10%
Total Jumla

1 Buah Pasang Engsel Pintu / Jendela Kuningan (SNI 6.5)


29
No. : Uraian Satuan Kuantitas
No. : Uraian Satuan Kuantitas

I BAHAN
1 Engsel Pintu Bh 1.0000

II TENAGA
1 Pekerja Oh 0.0150
2 Tukang Kayu Oh 0.1500
3 Kepala Tukang Oh 0.0150
4 Mandor Oh 0.0008

Jumla
Overhead + Profit 10%
Total Jumla

1 Bh Pasangan Kunci Tanam (SNI 6.2)


30
No. : Uraian Satuan Kuantitas

I BAHAN
1 Kunci Tanam Bh 1.0000

II TENAGA
1 Pekerja Oh 0.0100
2 Tukang Kayu Oh 0.5000
3 Kepala Tukang Oh 0.0100
4 Mandor Oh 0.0050

Jumla
Overhead + Profit 10%
Total Jumla

1 Buah Pasang Grendel Pintu/ Jendela Kuningan (SNI 6.5)


31
No. : Uraian Satuan Kuantitas

I BAHAN
1 Grendel Kuningan Bh 1.0000

II TENAGA
1 Pekerja Oh 0.0150
2 Tukang Kayu Oh 0.1500
3 Kepala Tukang Oh 0.0150
4 Mandor Oh 0.0008

Jumla
Overhead + Profit 10%
Total Jumla
1 Buah Pasang Kait / Hak Angin Jendela Kuningan (SNI 6.5)
32
No. : Uraian Satuan Kuantitas

I BAHAN
1 Kait Angin Kuningan Bh 1.0000

II TENAGA
1 Pekerja Oh 0.0150
2 Tukang Kayu Oh 0.1500
3 Kepala Tukang Oh 0.0150
4 Mandor Oh 0.0008

Jumla
Overhead + Profit 10%

1 M Pengecatan Kayu Baru (SNI 6.9)


33
No. : Uraian Satuan Kuantitas

I BAHAN
1 Cat Meni Kg 0.2000
2 Plamur Kg 0.1500
3 Minyak Cat Ltr 0.1700
4 Cat Penutup Kg 0.3500

II TENAGA
1 Pekerja Oh 0.0100
2 Tukang Cat Oh 0.1050
3 Kepala Tukang Oh 0.0040
4 Mandor Oh 0.0025

Jumla
Overhead + Profit 10%
Total Jumla

1 M Pengecatan Tembok/Dinding/Plafond (SNI 6.14)


34
No. : Uraian Satuan Kuantitas

I BAHAN
1 Plamur Kg 0.1000
2 Cat Dasar Kg 0.1000
3 Cat Penutup Kg 0.2600

II TENAGA
1 Pekerja Oh 0.0200
2 Tukang Cat Oh 0.0630
3 Kepala Tukang Oh 0.0063
4 Mandor Oh 0.0025

Jumla
Overhead + Profit 10%
Total Jumla
1 M2 Pek. Teralis Pagar (Besi Holow 2 x 2)
67
No. : Uraian Satuan Kuantitas

I BAHAN
1 Besi Holow 2 x 2 cm M' 1.0000

II TENAGA
1 Pekerja Oh 1.2000
2 Tukang Las Oh 1.2000
3 Kepala Tukang Oh 0.0120
4 Mandor Oh 0.0006

Jumla
Overhead + Profit 10%
Total Jumla

1 M2 Pek. Teralis Pagar (Besi Holow 4 x 4)


67
No. : Uraian Satuan Kuantitas

I BAHAN
1 Besi Holow 4 x 4 cm M' 1.0000

II TENAGA
1 Pekerja Oh 1.2000
2 Tukang Las Oh 1.2000
3 Kepala Tukang Oh 0.0120
4 Mandor Oh 0.0006

Jumla
Overhead + Profit 10%
Total Jumla
AN PEKERJAAN

Harga Satuan Jumlah


(Rp.) (Rp.)

50,000.00 37,500.00
100,000.00 2,500.00

Jumlah 40,000.00
Overhead + Profit 10% -
Total Jumlah 40,000.00
Harga Satuan Jumlah
(Rp.) (Rp.)

50,000.00 9,600.00
100,000.00 1,920.00

Jumlah 13,333.33
Overhead + Profit 10% -
Total Jumlah 13,333.33

Harga Satuan Jumlah


(Rp.) (Rp.)

146,000.00 175,200.00

50,000.00 15,000.00
100,000.00 1,000.00

Jumlah 191,200.00
Overhead + Profit 10% -
Total Jumlah 191,200.00

)
Harga Satuan Jumlah
(Rp.) (Rp.)

2,250.00 157,500.00
88,457.60 17,125.39
250,200.00 11,259.00

50,000.00 15,000.00
70,000.00 7,000.00
100,000.00 1,000.00
100,000.00 1,500.00

Jumlah 210,384.39
Overhead + Profit 10% -
Total Jumlah 210,384.39
Harga Satuan Jumlah
(Rp.) (Rp.)

88,457.60 7,812.58
250,200.00 6,755.40

50,000.00 15,000.00
70,000.00 10,500.00
88,300.00 1,324.50
100,000.00 1,500.00

Jumlah 42,892.48
Overhead + Profit 10% -
Total Jumlah 42,892.48
6.3)
Harga Satuan Jumlah
(Rp.) (Rp.)

88,457.60 20,345.25

50,000.00 10,000.00
70,000.00 10,500.00
50,000.00 750.00
100,000.00 1,000.00

Jumlah 42,595.25
Overhead + Profit 10% -
Total Jumlah 42,595.25
Harga Satuan Jumlah
(Rp.) (Rp.)

88,457.60 406,904.96
291,900.00 151,788.00
375,300.00 326,511.00

50,000.00 60,000.00
70,000.00 14,000.00
100,000.00 2,000.00
100,000.00 6,000.00

Jumlah 967,203.96
Overhead + Profit 10% -
Total Jumlah 967,203.96

Harga Satuan Jumlah


(Rp.) (Rp.)

88,457.60 410,443.26
291,900.00 151,788.00
375,300.00 292,734.00

50,000.00 82,500.00
70,000.00 17,500.00
100,000.00 2,500.00
100,000.00 8,000.00

Jumlah 965,465.26
Overhead + Profit 10% -
Total Jumlah 965,465.26

ng ) (SNI 6.39)
Harga Satuan Jumlah
(Rp.) (Rp.)

1,496,265.00 403,991.55
24,500.00 49,000.00
11,652.89 1,048,760.10
23,415.00 70,245.00
88,457.60 571,436.10
146,000.00 75,920.00
343,700.00 268,086.00

50,000.00 242,500.00
70,000.00 24,500.00
70,000.00 109,200.00
70,000.00 98,000.00
100,000.00 33,100.00
100,000.00 17,000.00

Jumlah 3,011,738.75
Overhead + Profit 10% -
Total Jumlah 3,011,738.75
Harga Satuan Jumlah
(Rp.) (Rp.)

375,300.00 180,144.00
88,457.60 343,215.49
291,900.00 91,072.80
343,700.00 160,851.60
11,652.89 1,468,264.14
23,415.00 42,147.00

50,000.00 170,000.00
70,000.00 59,500.00
100,000.00 8,500.00
100,000.00 17,000.00

Jumlah 2,540,695.03
Overhead + Profit 10% -
Total Jumlah 2,540,695.03

ting ) (SNI 6.40)


Harga Satuan Jumlah
(Rp.) (Rp.)

1,496,265.00 598,506.00
24,500.00 98,000.00
53,619.90 107,239.80
10,733.32 1,073,332.00
23,415.00 105,367.50
88,457.60 571,436.10
291,900.00 151,788.00
333,600.00 260,208.00
1,496,265.00 224,439.75
59,405.00 166,334.00

50,000.00 365,000.00
70,000.00 24,500.00
70,000.00 231,000.00
70,000.00 147,000.00
100,000.00 57,000.00
100,000.00 25,000.00

Jumlah 4,206,151.15
Overhead + Profit 10% -
Total Jumlah 4,206,151.15

ng ) (SNI 6.41)
Harga Satuan Jumlah
(Rp.) (Rp.)

1,496,265.00 478,804.80
24,500.00 78,400.00
40,000.00 64,000.00
10,733.32 1,609,998.00
23,415.00 70,245.00
88,457.60 571,436.10
291,900.00 151,788.00
333,600.00 260,208.00
1,496,265.00 209,477.10
59,405.00 166,334.00
1,496,265.00 239,402.40

50,000.00 298,000.00
70,000.00 24,500.00
70,000.00 196,000.00
70,000.00 98,000.00
100,000.00 45,500.00
100,000.00 20,800.00

Jumlah 4,582,893.40
Overhead + Profit 10% -
Total Jumlah 4,582,893.40
kisting ) (SNI 6.42)
Harga Satuan Jumlah
(Rp.) (Rp.)

1,496,265.00 478,804.80
24,500.00 78,400.00
40,000.00 64,000.00
10,733.32 965,998.80
23,415.00 52,683.75
88,457.60 571,436.10
291,900.00 151,788.00
333,600.00 260,208.00
59,405.00 7,128.60
144,210.00 403,788.00
1,496,265.00 239,402.40

50,000.00 290,000.00
70,000.00 24,500.00
70,000.00 196,000.00
70,000.00 73,500.00
100,000.00 42,000.00
100,000.00 18,500.00

Jumlah 3,918,138.45
Overhead + Profit 10% -
Total Jumlah 3,918,138.45

g ) (SNI 6.44)
Harga Satuan Jumlah
(Rp.) (Rp.)

1,496,265.00 374,066.25
24,500.00 73,500.00
40,000.00 48,000.00
10,733.32 965,998.80
23,415.00 70,245.00
88,457.60 571,436.10
291,900.00 151,788.00
333,600.00 260,208.00
1,496,265.00 157,107.83
59,405.00 148,512.50
1,496,265.00 119,701.20
50,000.00 280,000.00
70,000.00 24,500.00
70,000.00 161,000.00
70,000.00 98,000.00
100,000.00 40,500.00
100,000.00 20,200.00

Jumlah 3,564,763.67
Overhead + Profit 10% -
Total Jumlah 3,564,763.67
Harga Satuan Jumlah
(Rp.) (Rp.)

61,418.00 61,418.00
88,457.60 17,691.52
250,200.00 5,379.30
18,375.00 27,562.50

50,000.00 13,000.00
70,000.00 8,750.00
100,000.00 1,250.00
100,000.00 1,300.00

Jumlah 136,351.32
Overhead + Profit 10% -
Total Jumlah 136,351.32
Harga Satuan Jumlah
(Rp.) (Rp.)

1,496,265.00 1,645,891.50
26,300.00 394,500.00
24,500.00 2,450.00

50,000.00 200,000.00
70,000.00 840,000.00
100,000.00 120,000.00
100,000.00 20,000.00

Jumlah 3,222,841.50
Overhead + Profit 10% -
Total Jumlah 3,222,841.50
Harga Satuan Jumlah
(Rp.) (Rp.)

1,496,265.00 1,645,891.50
24,500.00 98,000.00

50,000.00 200,000.00
70,000.00 840,000.00
100,000.00 120,000.00
100,000.00 20,000.00

Jumlah 2,923,891.50
Overhead + Profit 10% -
Total Jumlah 2,923,891.50

Harga Satuan Jumlah


(Rp.) (Rp.)

1,496,265.00 21,695.84
24,500.00 1,470.00

50,000.00 7,500.00
70,000.00 17,500.00
100,000.00 2,500.00
100,000.00 7,500.00

Jumlah 58,165.84
Overhead + Profit 10% -
Total Jumlah 58,165.84

Harga Satuan Jumlah


(Rp.) (Rp.)

25,500.00 26,775.00
24,500.00 490.00

50,000.00 1,050.00
70,000.00 1,470.00
100,000.00 200.00
100,000.00 100.00

Jumlah 30,085.00
Overhead + Profit 10% -
Total Jumlah 30,085.00

Harga Satuan Jumlah


(Rp.) (Rp.)

2,156,000.00 25,872.00
22,600.00 2,260.00

55,700.00 8,355.00
78,700.00 19,675.00
88,300.00 2,207.50
93,200.00 6,990.00

Jumlah 65,359.50
Overhead + Profit 10% -
Total Jumlah 65,359.50
Harga Satuan Jumlah
(Rp.) (Rp.)

165,000.00 165,000.00
23,400.00 2,574.00

50,000.00 20,000.00
70,000.00 3,500.00
100,000.00 500.00
100,000.00 500.00

Jumlah 192,074.00
Overhead + Profit 10% -
Total Jumlah 192,074.00

Harga Satuan Jumlah


(Rp.) (Rp.)

1,496,265.00 95,760.96
15,000.00 7,500.00

50,000.00 40,000.00
70,000.00 140,000.00
100,000.00 20,000.00
100,000.00 4,000.00

Jumlah 307,260.96
Overhead + Profit 10% -
Total Jumlah 307,260.96

Harga Satuan Jumlah


(Rp.) (Rp.)

180,200.00 198,220.00
15,000.00 4,500.00

50,000.00 750.00
70,000.00 10,500.00
100,000.00 1,500.00
100,000.00 75.00

Jumlah 215,545.00
Overhead + Profit 10% -
Total Jumlah 215,545.00
Harga Satuan Jumlah
(Rp.) (Rp.)

2,493,000.00 2,742,300.00
25,000.00 31,250.00
15,000.00 15,000.00

50,000.00 300,000.00
70,000.00 1,260,000.00
100,000.00 200,000.00
100,000.00 30,000.00

Jumlah 4,578,550.00
Overhead + Profit 10% -
Total Jumlah 4,578,550.00

Harga Satuan Jumlah


(Rp.) (Rp.)

2,493,000.00 99,720.00
15,000.00 7,500.00

50,000.00 50,000.00
70,000.00 175,000.00
100,000.00 25,000.00
100,000.00 5,000.00

Jumlah 362,220.00
Overhead + Profit 10% -
Total Jumlah 362,220.00

Harga Satuan Jumlah


(Rp.) (Rp.)

42,000.00 29,400.00
29,500.00 590.00

50,000.00 6,000.00
70,000.00 4,200.00
100,000.00 600.00
100,000.00 600.00

Jumlah 41,390.00
Overhead + Profit 10% -
Total Jumlah 41,390.00

Harga Satuan Jumlah


(Rp.) (Rp.)

40,500.00 12,150.00
29,500.00 1,180.00

50,000.00 7,500.00
70,000.00 4,900.00
100,000.00 800.00
100,000.00 600.00

Jumlah 27,130.00
Overhead + Profit 10% -
Total Jumlah 27,130.00

Harga Satuan Jumlah


(Rp.) (Rp.)

25,000.00 1,250.00
4,935.00 53,298.00
250,200.00 8,006.40
18,375.00 18,375.00

50,000.00 7,500.00
70,000.00 4,900.00
100,000.00 800.00
100,000.00 600.00

Jumlah 94,729.40
Overhead + Profit 10% -
Total Jumlah 94,729.40

Harga Satuan Jumlah


(Rp.) (Rp.)
Harga Satuan Jumlah
(Rp.) (Rp.)

52,440.00 52,440.00

50,000.00 750.00
70,000.00 10,500.00
100,000.00 1,500.00
100,000.00 75.00

Jumlah 65,265.00
Overhead + Profit 10% -
Total Jumlah 65,265.00

Harga Satuan Jumlah


(Rp.) (Rp.)

193,000.00 193,000.00

50,000.00 500.00
70,000.00 35,000.00
100,000.00 1,000.00
100,000.00 500.00

Jumlah 230,000.00
Overhead + Profit 10% -
Total Jumlah 230,000.00

Harga Satuan Jumlah


(Rp.) (Rp.)

15,042.00 15,042.00

50,000.00 750.00
70,000.00 10,500.00
100,000.00 1,500.00
100,000.00 75.00

Jumlah 27,867.00
Overhead + Profit 10% -
Total Jumlah 27,867.00
Harga Satuan Jumlah
(Rp.) (Rp.)

17,500.00 17,500.00

50,000.00 750.00
70,000.00 10,500.00
100,000.00 1,500.00
100,000.00 75.00

Jumlah 30,325.00
Overhead + Profit 10% -
Total Jumlah 30,325.00

Harga Satuan Jumlah


(Rp.) (Rp.)

36,750.00 7,350.00
25,500.00 3,825.00
24,455.00 4,157.35
50,232.00 17,581.20

50,000.00 500.00
70,000.00 7,350.00
100,000.00 400.00
100,000.00 250.00

Jumlah 41,413.55
Overhead + Profit 10% -
Total Jumlah 41,413.55

Harga Satuan Jumlah


(Rp.) (Rp.)

25,500.00 2,550.00
20,700.00 2,070.00
35,400.00 9,204.00
50,000.00 1,000.00
70,000.00 4,410.00
100,000.00 630.00
100,000.00 250.00

Jumlah 20,114.00
Overhead + Profit 10% -
Total Jumlah 20,114.00
Harga Satuan Jumlah
(Rp.) (Rp.)

45,000.00 45,000.00

50,000.00 60,000.00
70,000.00 84,000.00
100,000.00 1,200.00
100,000.00 60.00

Jumlah 190,260.00
Overhead + Profit 10% -
Total Jumlah 190,260.00

Harga Satuan Jumlah


(Rp.) (Rp.)

56,250.00 56,250.00

50,000.00 60,000.00
70,000.00 84,000.00
100,000.00 1,200.00
100,000.00 60.00

Jumlah 201,510.00
Overhead + Profit 10% -
Total Jumlah 201,510.00
DAFTAR HARGA UPAH DAN

NO NAMA TENAGA KERJA HARGA

1 Tukang kayu Trampil Rp 70,000.00


2 Tukang besi beton trampil Rp 70,000.00
3 Tukang batu trampil Rp 70,000.00
4 Tukang Cat Rp 70,000.00
5 Tukang Las Rp 70,000.00
6 Kepala tukang Rp 100,000.00
7 Kepala tukang kayu Rp 100,000.00
8 Kepala tukang Besi Beton Rp 100,000.00
9 Kepala tukang Besi Konstruksi/ Profil Rp 100,000.00
10 Kepala tukang Batu Rp 100,000.00
11 Pekerja Rp 50,000.00
12 Mandor Rp 100,000.00
DAFTAR HARGA BAHAN MATERIAL
NO NAMA MATERIAL HARGA
1 Batu bulat 15 Cm Rp 196,000.00
2 Batu Pecah Rp 221,100.00
3 Kerikil beton/ Bt. Pecah Rp 333,600.00
4 Kerikil beton/ Bt. Pecah 2/3 Rp 375,300.00
5 Kerikil Kasar Rp 343,700.00
6 Pasir urug Rp 146,000.00
7 Pasir pasangan Rp 250,200.00
8 Pasir Beton Rp 291,900.00
9 Sirtu Rp 146,000.00
10 Tanah urug Rp 125,100.00
11 Batu Bata Rp 2,250.00
12 Semen Portland 50 kg Rp 88,457.60
13 Semen warna Rp 18,375.00
14 Semen putih Rp 4,935.00
15 Besi beton 8 Rp 10,276.79
16 Besi beton 10 Rp 11,652.89
17 Besi beton 12 Rp 10,733.32
18 Besi beton 16 Rp 12,423.47
19 Besi Holow 2 x 2 cm Rp 45,000.00
20 Besi Holow 4 x 4 cm Rp 56,250.00
21 Besi Plat Strip 3/4' x 1/8 x 6m Rp 26,300.00
22 Kawat beton Rp 23,415.00
23 Paku campur Rp 24,500.00
24 Paku Seng Rp 29,500.00
25 Paku Asbes Rp 23,400.00
26 Paku biasa 2" - 5" Rp 25,000.00
27 Seng Gelombang 0,2 mm Rp 42,000.00
28 Nok Seng Setengah Lingkaran Rp 40,500.00
29 Seng gelombang BJLS 0.20 Rp 59,472.00
30 Keramik 30x30 kualitas Sedang Rp 61,418.00
31 Keramik 30x30 kualitas Baik Rp 96,700.00
32 Gypsum Board 9 mm Rp 165,000.00
33 Tripleks 3 mm (122x244) Rp 59,405.00
34 Kaca bening 5 mm (152x122) Rp 180,200.00
35 Kayu balok kls I (10/10x3m) Rp 2,493,000.00
36 Papan kayu kls I (5/10x3m) Rp 2,493,000.00
37 Kayu balok kls II (6/12x3m) Rp 1,496,265.00
38 Papan kayu kls II (3/25x3m) Rp 1,496,265.00
39 list profil 5 cm Rp 25,500.00
40 Lem Kayu Rp 15,000.00
41 Kunci Pintu Kualitas Baik Rp 193,000.00
42 Minyak Bekisting Rp 40,000.00
43 Plamur Tembok Rp 25,500.00
44 Cat Dasar Rp 20,700.00
45 Cat tembok kualitas baik Rp 35,400.00
46 Cat Menie Rp 36,750.00
47 Cat glotex Rp 50,232.00
48 cat minyak kayu / besi nerek gloteks Rp 24,455.00
49 Lem Pipa Rp 96,600.00
50 Engsel pintu Kuningan Rp 52,440.00
51 Engsel jendela Kuningan Rp 29,946.00
52 Grendel jendela Rp 15,042.00
53 Kait Angin Rp 17,500.00
ARGA UPAH DAN BAHAN

SATUAN

Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
harga terakhir UP 20% Hasil Harga
SATUAN
m3 196,000.00 39,200.00 235,200.00
m3 221,100.00 44,220.00 265,320.00
m3 333,600.00 66,720.00 400,320.00
m3 375,300.00 75,060.00 450,360.00
m3 343,700.00 68,740.00 412,440.00
m3 146,000.00 29,200.00 175,200.00
m3 250,200.00 50,040.00 300,240.00
m3 291,900.00 58,380.00 350,280.00
m3 146,000.00 29,200.00 175,200.00
m3 125,100.00 25,020.00 150,120.00
bh 2,250.00 450.00 2,700.00
zak 88,457.60 17,691.52 106,149.12
kg 18,375.00 3,675.00 22,050.00
kg 4,935.00 987.00 5,922.00
kg 10,276.79 2,055.36 12,332.15
kg 11,652.89 2,330.58 13,983.47
kg 10,733.32 2,146.66 12,879.98
kg 12,423.47 2,484.69 14,908.16
m' 45,000.00 9,000.00 54,000.00
m' 56,250.00 11,250.00 67,500.00
Lbr 26,300.00 5,260.00 31,560.00
kg 23,415.00 4,683.00 28,098.00
kg 24,500.00 4,900.00 29,400.00
kg 29,500.00 5,900.00 35,400.00
bh 23,400.00 4,680.00 28,080.00
kg 25,000.00 5,000.00 30,000.00
lbr 42,000.00 8,400.00 50,400.00
Bh 40,500.00 8,100.00 48,600.00
lbr 59,472.00 11,894.40 71,366.40
dos 61,418.00 12,283.60 73,701.60
dos 96,700.00 19,340.00 116,040.00
m2 165,000.00 33,000.00 198,000.00
lbr 59,405.00 11,881.00 71,286.00
m2 180,200.00 36,040.00 216,240.00
m3 2,493,000.00 498,600.00 2,991,600.00
m3 2,493,000.00 498,600.00 2,991,600.00
m3 1,496,265.00 299,253.00 1,795,518.00
m3 1,496,265.00 299,253.00 1,795,518.00
m' 25,500.00 5,100.00 30,600.00
kg 15,000.00 3,000.00 18,000.00
bh 193,000.00 38,600.00 231,600.00
kg 40,000.00 8,000.00 48,000.00
kg 25,500.00 5,100.00 30,600.00
kg 20,700.00 4,140.00 24,840.00
kg 35,400.00 7,080.00 42,480.00
kg 36,750.00 7,350.00 44,100.00
kg 50,232.00 10,046.40 60,278.40
kg 24,455.00 4,891.00 29,346.00
Kg 96,600.00 19,320.00 115,920.00
bh 52,440.00 10,488.00 62,928.00
bh 29,946.00 5,989.20 35,935.20
bh 15,042.00 3,008.40 18,050.40
bh 17,500.00 3,500.00 21,000.00

10
2
3.8
1.5
5
1
23.3
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Kantor Kepolisian Pengendali Pengaw
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN
1 Papan Proyek, P3K dan Mobilisasi Demobilisasi
2 Pemasangan Bowplank

B PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan pasir bawah pondasi T=5 cm
3 Urugan pasir bawah lantai
4 Urugan tanah kembali

C PEKERJAAN PONDASI
1 Pas. Batu Kosong Pondasi
2 Pas. Pondasi Batu Gunung

D PEKERJAAN STRUKTUR BETON


1 Kolom Praktis 15 /15
2 Sloef Struktur 15/20
3 Pekerjaan Plat Teras
4 Ring Balk 13/13
5 Balok Latai 12/12
6 Kanopi Jendela t=10 cm
7 Meja Pantry beton t=10cm

E PEKERJAAN PASANGAN BATU


1 Pasangan Dinding Batu Bata 1 : 4
2 Pasangan Dinding Batu Alam Tiang Teras

F PEK. PLESTERAN DAN ACIAN


1 Plesteran 1 : 5
2 Acian dinding

G PASANGAN LANTAI KERAMIK


1 Pas. Rabat Tb.5 cm
2 Pas. Lantai Keramik 40/40
4 Pas. Lantai Keramik KM/WC 20/20
5 Pas. Dinding Keramik 20/25 Ex. Roman

H PEK. KUSEN, PINTU, JENDELA & KACA MATI


1 Kusen Pintu & Jendela
2 Daun pintu Panil Bayam
3 Daun Jendela Pasangan Kaca
4 Pas. Kaca Mati Kaca 5 mm (polos)
5 Lubang Ventilasi Bayam 20/30
6 Pintu Teakwood KM/WC

I PEKERJAAN ATAP & PLAFOND


1 Pek. Kuda-kuda kayu Kelas.I
2 Pek. Rangka Atap Gording
3 Pek. Kaso & Reng
4 Pas. Atap Metal Roof
5 Pek. Nok Metal Roof
6 Pek. Plafond Gypsumboard
7 Rangka Plafond Besi Hollow
8 Plafond Rangka Kayu dan Penututp Tripleks Pada Overstek
9 Pek. Lisplank Bayam 2 x 2/20
10 Beugel, angkur & baut Kuda-kuda

J PEK. PENGECATAN DAN RESIDU


1 Pengecatan Kayu
2 Pengecatan Tembok
3 Residu Kayu+ meni
4 Pengecatan Plafond

K PEKERJAAN PENGGANTUNG DAN KUNCI


1 Kunci Tanam Pintu Depan
2 Kunci Tanam Pintu Kamar
3 Handel Pintu Depan
4 Engsel Pintu
5 Engsel Jendela
6 Grendel Jendela
7 Hak Angin

L PEKERJAAN SANITASI & SUN SCREEN


1 Pas. Closet Duduk
2 Bak Mandi Fiber
3 Kran Air 3/4" Ex. Onda
4 Floor Drain 3"
5 Septiktank & Peresapan
6 Bak Cuci Piring + Kran Bebek
7 Sun Screen Hollow 3/3

M PEK. INSTALASI LISTRIK


1 Titik Nyala
2 Saklar Ganda + Fitting Ex.Broco
3 Saklar Tunggal + Fitting Ex. Broco
4 Stop Kontak Ex.Broco
5 Lampu Sumpit Philips 18 watt
6 Lampu Sumpit Philips 9 watt
7 Panel MCB
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
: Pembangunan Kantor Kepolisian Pengendali Peng
KECAMATAN / KOTA : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN STRUKTUR BETON
E PEKERJAAN PASANGAN BATU
F PEK. PLESTERAN DAN ACIAN
G PASANGAN LANTAI KERAMIK
H PEK. KUSEN, PINTU, JENDELA & KACA MATI
I PEKERJAAN ATAP & PLAFOND
J PEK. PENGECATAN DAN RESIDU
K PEKERJAAN PENGGANTUNG DAN KUNCI
L PEKERJAAN SANITASI & SUN SCREEN
M PEK. INSTALASI LISTRIK

Jumlah

PPN 10%
Jumlah Total

Dibulatkan

Terbilang :
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2


sian Pengendali Pengawas Pelabuhan KPPP

HARGA
SAT. VOL.
SAT. JUMLAH

Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00


M' 82.00 Err:509 Err:509
Err:509

M3 43.05 Rp 40,000.00 Rp 1,722,000.00


M3 2.08 Rp 191,200.00 Rp 397,696.00
M3 5.20 Rp 191,200.00 Rp 994,240.00
M3 10.76 Rp 13,333.33 Rp 143,500.00
Rp 3,257,436.00

M3 6.56 Err:509 Err:509


M3 34.85 Err:509 Err:509
Err:509

M3 3.70 Rp 4,206,151.15 Rp 15,563,285.01


M3 2.46 Rp 3,011,738.75 Rp 7,408,877.32
M3 0.48 Rp 3,564,763.67 Rp 1,711,086.56
M3 1.39 Rp 3,918,138.45 Rp 5,429,756.26
M3 0.13 Rp 3,918,138.45 Rp 507,790.74
M3 2.18 Rp 3,011,738.75 Rp 6,577,637.42
M3 0.24 Rp 3,011,738.75 Rp 722,817.30
Rp 37,921,250.61

M2 340.30 Rp 210,384.39 Rp 71,593,808.38


M2 9.12 Rp 210,000.00 Rp 1,915,200.00
Rp 73,509,008.38

M2 544.48 Err:509 Err:509


M2 544.48 Rp 42,595.25 Rp 23,192,260.63
Err:509

M2 5.20 Rp 967,203.96 Rp 5,029,460.59


M2 93.00 Err:509 Err:509
M2 11.00 Err:509 Err:509
M2 41.40 Err:509 Err:509
Err:509

M3 0.89 Rp 4,578,550.00 Rp 4,076,054.14


M2 6.72 Rp 362,220.00 Rp 2,434,118.40
M2 15.61 Rp 215,545.00 Rp 3,364,657.45
M2 3.65 Rp 175,000.00 Rp 638,750.00
bh 6.00 Err:509 Err:509
bh 3.00 Err:509 Err:509
Err:509

M3 0.12 Rp 3,222,841.50 Rp 388,674.68


M3 0.56 Rp 2,923,891.50 Rp 1,637,379.24
M2 193.38 Rp 89,000.00 Rp 17,210,375.00
M2 193.38 Rp 41,390.00 Rp 8,003,791.25
M1 29.15 Rp 125,000.00 Rp 3,643,750.00
M2 104.00 Rp 192,074.00 Rp 19,975,696.00
M2 104.00 Err:509 Err:509
M2 41.58 Rp 187,900.00 Rp 7,812,882.00
M1 49.80 Rp 58,165.84 Rp 2,896,658.96
Ls 1.00 Rp 500,000.00 Rp 500,000.00
Err:509

M2 63.39 Rp 41,413.55 Rp 2,625,345.02


M2 544.48 Err:509 Err:509
Ls 1.00 Rp 200,000.00 Rp 200,000.00
M2 145.58 Rp 20,114.00 Rp 2,928,196.12
Err:509

bh 1.00 Rp 230,000.00 Rp 230,000.00


bh 7.00 Rp 230,000.00 Rp 1,610,000.00
psg 2.00 Rp 500,000.00 Rp 1,000,000.00
Bh 27.00 Rp 65,265.00 Rp 1,762,155.00
Bh 28.00 Rp 65,265.00 Rp 1,827,420.00
Bh 14.00 Rp 65,265.00 Rp 913,710.00
Bh 14.00 Rp 30,325.00 Rp 424,550.00
Rp 7,767,835.00

bh 3.00 Err:509 Err:509


bh 3.00 Rp 250,000.00 Rp 750,000.00
Bh 2.00 Err:509 Err:509
Bh 1.00 Err:509 Err:509
Bh 1.00 Rp 2,500,000.00 Rp 2,500,000.00
Bh 1.00 Err:509 Err:509
M' 14.25 Err:509 Err:509
Err:509

TTK 17.00 Rp 100,000.00 Rp 1,700,000.00


BH 7.00 Err:509 Err:509
BH 4.00 Err:509 Err:509
BH 14.00 Err:509 Err:509
BH 13.00 Err:509 Err:509
BH 4.00 Err:509 Err:509
BH 1.00 Rp 200,000.00 Rp 200,000.00
Err:509
HARGA
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2


olisian Pengendali Pengawas Pelabuhan KPPP

JUMLAH

Err:509
Rp 3,257,436.00
Err:509
Rp 37,921,250.61
Rp 73,509,008.38
Err:509
Err:509
Err:509
Err:509
Err:509
Rp 7,767,835.00
Err:509
Err:509

lah Err:509

10% Err:509
h Total Err:509

atkan Err:509

Terbilang :

Ternate, 1 Desember 2009


Konsultan Perencana,
PT Bintang Inti Rekatama

Ir. Iriansyah Tadjuddin


Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Pos Jaga Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN PEKERJAAN SAT.

A PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank M'

B PEKERJAAN TANAH
1 Galian Tanah Pondasi M3
2 Urugan pasir bawah pondasi T=5 cm M3
3 Urugan pasir bawah lantai M3
4 Urugan tanah kembali M3

C PEKERJAAN PONDASI
1 Pas. Batu Kosong Pondasi M3
2 Pas. Pondasi Batu Gunung M3

D PEKERJAAN STRUKTUR BETON


1 Kolom Praktis 15 /15 M3
2 Sloef Struktur 15/20 M3
3 Pekerjaan Plat Dak Atap M3
4 Lisplank Beton 10/50 M3
5 Ring Balk 13/13 M3
6 Balok Latai 12/12 M3

E PEKERJAAN PASANGAN BATU


1 Pasangan Dinding Batu Bata 1 : 4 M2
2 Profil Beton M2

F PEK. PLESTERAN DAN ACIAN


1 Plesteran 1 : 5 M2
2 Acian dinding M2

G PASANGAN LANTAI KERAMIK


1 Pas. Rabat Tb.5 cm M2
2 Pas. Lantai Keramik 30/30 M2
4 Pas. Lantai Keramik KM/WC 20/20 M2
5 Pas. Dinding Keramik 20/25 Ex. Roman M2

H PEK. KUSEN, PINTU, JENDELA & KACA MATI


1 Lubang Ventilasi Bayam 20/30 bh
2 Pintu Teakwood KM/WC bh

I PEKERJAAN ATAP & PLAFOND


1 Pek. Plafond Gypsumboard M2
2 Rangka Plafond Besi Hollow M2

J PEK. PENGECATAN DAN RESIDU


1 Pengecatan Tembok M2
2 Pengecatan Plafond M2

K PEKERJAAN PENGGANTUNG DAN KUNCI


1 Kunci Tanam Pintu Km/Wc bh
2 Engsel Pintu Bh

L PEKERJAAN SANITASI & SUN SCREEN


1 Pas. Closet Duduk bh
2 Bak Mandi Fiber bh
3 Kran Air 3/4" Ex. Onda Bh
4 Floor Drain 3" Bh
5 Septiktank & Peresapan Bh
6 Sun Screen Hollow 3/3 M'

M PEK. INSTALASI LISTRIK


1 Titik Nyala TTK
2 Saklar Ganda + Fitting Ex.Broco BH
3 Saklar Tunggal + Fitting Ex. Broco BH
4 Stop Kontak Ex.Broco BH
5 Lampu Sumpit Philips 18 watt BH
6 Lampu Sumpit Philips 9 watt BH
7 Panel MCB BH
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
: Pembangunan Pos Jaga Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN STRUKTUR BETON
E PEKERJAAN PASANGAN BATU
F PEK. PLESTERAN DAN ACIAN
G PASANGAN LANTAI KERAMIK
H PEK. KUSEN, PINTU, JENDELA & KACA MATI
I PEKERJAAN ATAP & PLAFOND
J PEK. PENGECATAN DAN RESIDU
K PEKERJAAN PENGGANTUNG DAN KUNCI
L PEKERJAAN SANITASI & SUN SCREEN
M PEK. INSTALASI LISTRIK

Jumlah

PPN 10%
Jumlah Total

Dibulatkan

Terbilang :
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2

HARGA
VOL.
SAT. JUMLAH

21.50 Err:509 Err:509


Err:509

11.29 Rp 40,000.00 Rp 451,500.00


1.08 Rp 191,200.00 Rp 205,540.00
0.80 Rp 191,200.00 Rp 152,960.00
2.82 Rp 13,333.33 Rp 37,625.00
Rp 847,625.00

1.29 Err:509 Err:509


9.14 Err:509 Err:509
Err:509

0.58 Rp 4,206,151.15 Rp 2,422,743.06


0.65 Rp 3,011,738.75 Rp 1,942,571.49
1.92 Rp 3,564,763.67 Rp 6,844,346.25
0.80 Rp 3,564,763.67 Rp 2,851,810.94
0.36 Rp 3,918,138.45 Rp 1,423,655.60
0.09 Rp 3,918,138.45 Rp 366,737.76
Rp 15,851,865.10

53.75 Rp 210,384.39 Rp 11,308,161.04


12.00 Rp 176,000.00 Rp 2,112,000.00
Rp 13,420,161.04
107.50 Err:509 Err:509
107.50 Rp 42,595.25 Rp 4,578,989.16
Err:509

0.80 Rp 967,203.96 Rp 773,763.17


13.75 Rp 136,351.32 Rp 1,874,830.65
2.25 Err:509 Err:509
10.80 Err:509 Err:509
Err:509

1.00 Err:509 Err:509


1.00 Err:509 Err:509
Err:509

16.00 Rp 192,074.00 Rp 3,073,184.00


16.00 Err:509 Err:509
Err:509

107.50 Err:509 Err:509


16.00 Rp 20,114.00 Rp 321,824.00
Err:509

1.00 Rp 230,000.00 Rp 230,000.00


3.00 Rp 65,265.00 Rp 195,795.00
Rp 425,795.00

1.00 Err:509 Err:509


1.00 Rp 250,000.00 Rp 250,000.00
1.00 Err:509 Err:509
1.00 Err:509 Err:509
1.00 Rp 2,500,000.00 Rp 2,500,000.00
2.20 Err:509 Err:509
Err:509

3.00 Rp 100,000.00 Rp 300,000.00


1.00 Err:509 Err:509
1.00 Err:509 Err:509
2.00 Err:509 Err:509
2.00 Err:509 Err:509
1.00 Err:509 Err:509
1.00 Rp 200,000.00 Rp 200,000.00
Err:509
HARGA
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2

JUMLAH

Err:509
Rp 847,625.00
Err:509
Rp 15,851,865.10
Rp 13,420,161.04
Err:509
Err:509
Err:509
Err:509
Err:509
Rp 425,795.00
Err:509
Err:509

Err:509

Err:509
al Err:509

n Err:509

rbilang :

Ternate, 1 Desember 2009


Konsultan Perencana,
PT Bintang Inti Rekatama

Ir. Iriansyah Tadjuddin


Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Ruang Genset Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN PEKERJAAN SAT.

A PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank M'

B PEKERJAAN TANAH
1 Galian Tanah Pondasi M3
2 Urugan pasir bawah pondasi T=5 cm M3
3 Urugan pasir bawah lantai M3
4 Urugan tanah kembali M3

C PEKERJAAN PONDASI
1 Pas. Batu Kosong Pondasi M3
2 Pas. Pondasi Batu Gunung M3

D PEKERJAAN STRUKTUR BETON


1 Kolom Praktis 15 /15 M3
2 Sloef Struktur 15/20 M3
3 Pekerjaan Plat Dak Atap M3
4 Lisplank Beton 10/50 M3
5 Ring Balk 13/13 M3

E PEKERJAAN PASANGAN BATU


1 Pasangan Dinding Batu Bata 1 : 4 M2
2 Profil Beton M2
F PEK. PLESTERAN DAN ACIAN
1 Plesteran 1 : 5 M2
2 Acian dinding M2

G PASANGAN LANTAI
1 Pas. Rabat Tb. 20 cm Landasan Mesin Genset M2
2 Pas. Lantai Plur/Acian M2

H PEK. KUSEN, PINTU, JENDELA & KACA MATI


1 Lubang Ventilasi Bayam 20/30 bh
2 Pintu Teakwood bh

I PEKERJAAN PLAFOND
1 Pek. Plafond Gypsumboard M2
2 Rangka Plafond Besi Hollow M2

J PEK. PENGECATAN DAN RESIDU


1 Pengecatan Tembok M2
2 Pengecatan Plafond M2

K PEKERJAAN PENGGANTUNG DAN KUNCI


1 Kunci Tanam Pintu Km/Wc bh
2 Engsel Pintu Bh

L PEK. INSTALASI LISTRIK


1 Titik Nyala TTK
2 Saklar Ganda + Fitting Ex.Broco BH
3 Saklar Tunggal + Fitting Ex. Broco BH
4 Stop Kontak Ex.Broco BH
5 Lampu Sumpit Philips 18 watt BH
6 Lampu Sumpit Philips 9 watt BH
7 Panel MCB BH
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
: Pembangunan Ruang Genset Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN STRUKTUR BETON
E PEKERJAAN PASANGAN BATU
F PEK. PLESTERAN DAN ACIAN
G PASANGAN LANTAI
H PEK. KUSEN, PINTU, JENDELA & KACA MATI
I PEKERJAAN PLAFOND
J PEK. PENGECATAN DAN RESIDU
K PEKERJAAN PENGGANTUNG DAN KUNCI
L PEK. INSTALASI LISTRIK

Jumlah

PPN 10%
Jumlah Total

Dibulatkan

Terbilang :
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2


Pelabuhan

HARGA
VOL.
SAT. JUMLAH

22.00 Err:509 Err:509


Err:509

11.55 Rp 40,000.00 Rp 462,000.00


1.10 Rp 191,200.00 Rp 210,320.00
1.50 Rp 191,200.00 Rp 286,800.00
2.89 Rp 13,333.33 Rp 38,500.00
Rp 997,620.00

1.32 Err:509 Err:509


9.35 Err:509 Err:509
Err:509

0.86 Rp 4,206,151.15 Rp 3,634,114.59


0.66 Rp 3,011,738.75 Rp 1,987,747.57
3.60 Rp 3,564,763.67 Rp 12,833,149.22
1.50 Rp 3,564,763.67 Rp 5,347,145.51
0.37 Rp 3,918,138.45 Rp 1,456,763.87
Rp 25,258,920.76

77.00 Rp 210,384.39 Rp 16,199,598.13


12.00 Rp 176,000.00 Rp 2,112,000.00
Rp 18,311,598.13

154.00 Err:509 Err:509


154.00 Rp 42,595.25 Rp 6,559,668.19
Err:509

7.50 Rp 967,203.96 Rp 7,254,029.70


30.00 Rp 42,595.25 Rp 1,277,857.44
Rp 8,531,887.14

10.00 Err:509 Err:509


2.00 Err:509 Err:509
Err:509

30.00 Rp 192,074.00 Rp 5,762,220.00


30.00 Err:509 Err:509
Err:509

154.00 Err:509 Err:509


30.00 Rp 20,114.00 Rp 603,420.00
Err:509

2.00 Rp 230,000.00 Rp 460,000.00


6.00 Rp 65,265.00 Rp 391,590.00
Rp 851,590.00

10.00 Rp 100,000.00 Rp 1,000,000.00


4.00 Err:509 Err:509
2.00 Err:509 Err:509
8.00 Err:509 Err:509
8.00 Err:509 Err:509
2.00 Err:509 Err:509
1.00 Rp 200,000.00 Rp 200,000.00
Err:509
HARGA
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2


et Pelabuhan

JUMLAH

Err:509
Rp 997,620.00
Err:509
Rp 25,258,920.76
Rp 18,311,598.13
Err:509
Rp 8,531,887.14
Err:509
Err:509
Err:509
Rp 851,590.00
Err:509

Err:509

Err:509
al Err:509

n Err:509

rbilang :

Ternate, 1 Desember 2009


Konsultan Perencana,
PT Bintang Inti Rekatama

Ir. Iriansyah Tadjuddin


Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Station BBM Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN PEKERJAAN SAT.

A PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank M'

B PEKERJAAN TANAH
1 Galian Tanah Pondasi M3
2 Urugan pasir bawah pondasi T=5 cm M3
3 Urugan pasir bawah lantai M3
4 Urugan tanah kembali M3

C PEKERJAAN PONDASI
1 Pas. Batu Kosong Pondasi M3
2 Pas. Pondasi Batu Gunung M3

D PEKERJAAN STRUKTUR BETON


1 Kolom Praktis 15 /15 M3
2 Sloef Struktur 15/20 M3

E PEKERJAAN PASANGAN BATU


1 Pasangan Dinding Batu Bata 1 : 4 M2

F PEK. PLESTERAN DAN ACIAN


1 Plesteran 1 : 5 M2
2 Acian dinding M2
G PASANGAN LANTAI
1 Pas. Rabat Tb. 20 cm Landasan Tabung BBM M2
2 Pas. Lantai Plur/Acian M2

H PEKERJAAN ATAP & PLAFOND


1 Pek. Kuda-kuda kayu Kelas.I M3
2 Pek. Rangka Atap Gording M3
3 Pas. Atap Metal Roof M2
4 Pek. Nok Metal Roof M1

I PEK. PENGECATAN DAN RESIDU


1 Pengecatan Tembok M2

J PEK. INSTALASI LISTRIK


1 Titik Nyala TTK
2 Saklar Ganda + Fitting Ex.Broco BH
3 Stop Kontak Ex.Broco BH
4 Lampu Sumpit Philips 18 watt BH
5 Panel MCB BH
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Station BBM Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN STRUKTUR BETON
E PEKERJAAN PASANGAN BATU
F PEK. PLESTERAN DAN ACIAN
G PASANGAN LANTAI
H PEKERJAAN ATAP & PLAFOND
I PEK. PENGECATAN DAN RESIDU
J PEK. INSTALASI LISTRIK

Jumlah

PPN 10%

Jumlah Total

Dibulatkan
Terbilang :
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2


elabuhan

HARGA
VOL.
SAT. JUMLAH

40.00 Err:509 Err:509


Err:509

21.00 Rp 40,000.00 Rp 840,000.00


2.00 Rp 191,200.00 Rp 382,400.00
4.80 Rp 191,200.00 Rp 917,760.00
5.25 Rp 13,333.33 Rp 70,000.00
Rp 2,210,160.00

2.40 Err:509 Err:509


17.00 Err:509 Err:509
Err:509

0.72 Rp 4,206,151.15 Rp 3,028,428.83


1.20 Rp 3,011,738.75 Rp 3,614,086.50
Rp 6,642,515.32

60.00 Rp 210,384.39 Rp 12,623,063.48


Rp 12,623,063.48

120.00 Err:509 Err:509


120.00 Rp 42,595.25 Rp 5,111,429.76
Err:509
24.00 Rp 967,203.96 Rp 23,212,895.04
96.00 Rp 42,595.25 Rp 4,089,143.81
Rp 27,302,038.85

0.22 Rp 3,222,841.50 Rp 696,133.76


0.84 Rp 2,923,891.50 Rp 2,456,068.86
140.40 Rp 41,390.00 Rp 5,811,156.00
14.00 Rp 125,000.00 Rp 1,750,000.00
Rp 10,713,358.62

120.00 Err:509 Err:509


Err:509

4.00 Rp 100,000.00 Rp 400,000.00


2.00 Err:509 Err:509
2.00 Err:509 Err:509
4.00 Err:509 Err:509
1.00 Rp 200,000.00 Rp 200,000.00
Err:509
HARGA
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2


elabuhan

JUMLAH

Err:509
Rp 2,210,160.00
Err:509
Rp 6,642,515.32
Rp 12,623,063.48
Err:509
Rp 27,302,038.85
Rp 10,713,358.62
Err:509
Err:509

Err:509

Err:509

al Err:509

n Err:509
rbilang :

Ternate, 1 Desember 2009


Konsultan Perencana,
PT Bintang Inti Rekatama

Ir. Iriansyah Tadjuddin


Direktur
RENCANA ANGGARAN BIAY
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
NAMA SEKOLAH : SDN TAMAMAUNG
LOKASI : JL. AP. PETTARANI III
KECAMATAN / KOTA : PANAKUKANG / MAKASSAR
SUMBER DANA APBD : DANA INSENTIF DAERAH (DID)
TAHUN ANGGARAN : 2011

No. URAIAN PEKERJAAN SAT.

I PEKERJAAN PERSIAPAN
1 Mobilisasi & Demobilisasi Alat-alat Kerja Ls
2 Pembongkaran dan Angkut Puing-puing Bongkaran Unit
3 Penyediaan Listrik dan Air Kerja Ls
4 Pertolongan Pertama Pada Kecelakaan (P3K) Ktk
5 Laporan dan Foto Dokumentasi Berkala Ls
6 Penyemprotan Anti Rayap Garansi 3 Tahun Ls

II PEKERJAAN TANAH
1 Galian Tanah Pondasi M3
2 Urugan Tanah kembali dipadatkan M3
3 Urugan Pasir bawah lantai dipadatkan M3

III PEKERJAAN PONDASI DAN BETON


A LANTAI 1
1 Urugan Pasir bawah lantai kerja T=10 cm M3
2 Lantai Kerja Pondasi Poer & Sloef 1 Pc : 3 Ps : 5 Kr , T=7 cm M3
3 Pondasi Plat Poer (PR 1 & PR 2) M3
4 Kolom 30/45 K1. M3
5 Kolom 30/30 K2. M3
6 Sloef 20/30 M3
7 Balok 30/60 B1. M3
8 Balok 20/30 B2. M3
9 Lisplank Beton 8/50 M3
10 Finishing / Pengecetan Beton M2

B LANTAI 2
1 Plat Beton T=12 cm M3
2 Kolom Utama 30/45 K1. M3
3 Kolom 30/30 K2. M3
4 Kolom 10/15 Teras M1
5 Ringbalk 10/15 Teras M1
6 Ringbalk 15/20 M3
7 Finishing / Pengecetan Beton M2

IV PEKERJAAN DINDING
1 Pasangan Dinding Batu Bata 1 Pc : 5 Ps M3
2 Plesteran 1 Pc : 6 Pp M2
3 Acian Pasta Semen M2
4 Finishing / Pengecetan Dinding M2
V PEKERJAAN KUSEN, PINTU, JENDELA & JALUSI
A KUSEN, PINTU DAN VENTILASI TYPE PV.
1 Kusen 4/14 Kayu Kelas I M3
2 Pintu Panil Kayu Kelas I M2
3 Ventilasi Silang Balok 3/5 Kayu Kelas II M2
4 Pas. Kaca Mati T=5 mm M2
5 Kunci Tanam Pintu 2x putar Kw. 1 Bh
6 Engsel Pintu Kuningan Bh
7 Finishing / Pengecetan Kayu M2

B KUSEN JENDELA DAN VENTILASI TYPE JV.


1 Kusen 4/14 Kayu Kelas I M3
2 Ventilasi Silang Balok 3/5 Kayu Kelas II M2
3 Pas. Jendela Kaca T=5 mm M2
4 Pas. Kaca Mati T=5 mm M2
5 Engsel Jendela Bh
6 Hak Angin Bh
7 Grendel Jendela Bh
8 Finishing / Pengecetan Kayu M2

C KUSEN, VENTILASI KACA & JALUSI KAYU TYPE VJ.


1 Kusen 4/14 Kayu Kelas I M3
2 Ventilasi Silang Balok 3/5 Kayu Kelas II M2
3 Pas. Kaca Mati T=5 mm M2
4 Finishing / Pengecetan Kayu M2

VI PEKERJAAN ATAP
1 Kuda-kuda Atap Kayu Kelas II M3
2 Gording Kayu Kelas II M3
3 Pas. Atap seng Bjls 0,2 mm M2
4 Lisplank Wood Plank 1/30 M2
5 Nok Seng Bjls 0,2 mm M1
6 Finishing / Pengecetan Kayu M2

VII PEKERJAAN KONSOL OVERSTEK LT.1


1 Konsol Kayu Kelas II M3
2 Gording Kayu Kelas II M3
3 Pas. Atap seng Bjls 0,2 mm M2
4 Nok Campuran 1 Pc : 3 Ps : 5 Kr, T=10 cm, L=15 cm M3
5 Rangka Plafond M2
6 Plafond Tripleks M2
7 Lisplank Wood Plank 1/30 M1
8 Lis Plafond Kayu Profil 3x3 cm M1
9 Pengecatan Plafond M2
10 Pengecatan Kayu M2

VIII PEKERJAAN DINDING LT. 1


1 Pasangan Dinding Batu Bata 1 Pc : 5 Ps Di atas Dining Existing M2
2 Plesteran 1 Pc : 6 Pp M2
3 Acian Pasta Semen M2
4 Pengecatan Dinding M2
5 Pintu Panil Kayu Kelas I = 1 Bh M2
6 Trali Pengaman depan kecil = 7 Bh M2
7 Trali Pengaman belakang besar = 8 Bh M2
8 Pengecatan Kayu M2

IX PEKERJAAN PLAFOND LT.1


1 Rangka Plafond Dan Penggantung M2
2 Plafond Tripleks M2
3 Lis Plafond Kayu Profil 3x3 cm M1
4 Pengecatan Plafond M2
5 Pengecatan Kayu M2

X PASANGAN LANTAI
1 Urugan Pasir bawah lantai (Lt.1 T=40 cm & Lt.2 T=5 cm) M3
2 Pasangan Lantai Keramik 30/30 Lantai 1. M2
3 Pasangan Lantai Keramik 30/30 Lantai 2. M2

XI PEKERJAAN FINISHING Ls
REKAPITULASI ANGGARAN BI
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
NAMA SEKOLAH : SDN TAMAMAUNG
LOKASI : JL. AP. PETTARANI III
KECAMATAN / KOTA : PANAKUKANG / MAKASSAR
SUMBER DANA APBD : DANA INSENTIF DAERAH (DID)
TAHUN ANGGARAN : 2011

No. URAIAN

I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III PEKERJAAN PONDASI DAN BETON
IV PEKERJAAN DINDING
V PEKERJAAN KUSEN, PINTU, JENDELA & JALUSI
VI PEKERJAAN ATAP
VII PEKERJAAN KONSOL OVERSTEK LT.1
VIII PEKERJAAN DINDING LT. 1
IX PEKERJAAN PLAFOND LT.1
X PASANGAN LANTAI
XI PEKERJAAN FINISHING

Jumlah 1

PPN 10%

Jumlah Total
Dibulatkan

Terbilang : Dua Ratus Sembilan Puluh Delapan Juta Dua Ratus R


NGGARAN BIAYA
PRASARANA PENDIDIKAN
AS BARU RKB LANTAI 2

HARGA
VOL.
SAT. JUMLAH

1.00 Rp 1,500,000.00 Rp 1,500,000.00


1.00 Rp 1,000,000.00 Rp 1,000,000.00
1.00 Rp 1,000,000.00 Rp 1,000,000.00
1.00 Rp 750,000.00 Rp 750,000.00
1.00 Rp 500,000.00 Rp 500,000.00
1.00 Rp 750,000.00 Rp 750,000.00
Jumlah Rp 5,500,000.00

22.822 Rp 40,000.00 Rp 912,880.00


5.705 Rp 13,333.33 Rp 76,066.67
1.896 Rp 191,200.00 Rp 362,515.20
Jumlah Rp 1,351,461.87

2.200 Rp 191,200.00 Rp 420,640.00


1.287 Rp 967,203.96 Rp 1,244,791.50
1.666 Rp 2,540,695.03 Rp 4,232,797.92
3.969 Rp 4,206,151.15 Rp 16,694,213.90
0.975 Rp 4,206,151.15 Rp 4,100,997.37
1.740 Rp 3,011,738.75 Rp 5,240,425.42
1.267 Rp 3,918,138.45 Rp 4,964,281.41
2.687 Rp 3,918,138.45 Rp 10,528,038.00
0.300 Rp 965,465.26 Rp 289,639.58
119.370 Rp 20,114.00 Rp 2,401,008.18
Jumlah Rp 50,116,833.27

8.109 Rp 3,564,763.67 Rp 28,906,668.61


2.673 Rp 4,206,151.15 Rp 11,243,042.01
0.594 Rp 4,206,151.15 Rp 2,498,453.78
4.000 Rp 4,206,151.15 Rp 16,824,604.58
9.000 Rp 3,918,138.45 Rp 35,263,246.01
0.870 Rp 3,918,138.45 Rp 3,408,780.45
7.290 Rp 20,114.00 Rp 146,631.06
Jumlah Rp 98,291,426.51
Jumlah Rp 148,408,259.78

57.681 Rp 210,384.39 Rp 12,135,182.08


115.361 Rp 42,892.48 Rp 4,948,118.84
115.361 Rp 42,595.25 Rp 4,913,830.40
115.361 Rp 20,114.00 Rp 2,320,371.15
Jumlah Rp 24,317,502.47
0.119 Rp 4,578,550.00 Rp 543,473.89
1.722 Rp 362,220.00 Rp 623,742.84
1.160 Rp 307,260.96 Rp 356,422.71
1.050 Rp 215,545.00 Rp 226,322.25
1.000 Rp 230,000.00 Rp 230,000.00
3.000 Rp 65,265.00 Rp 195,795.00
11.132 Rp 41,413.55 Rp 461,007.36
Jumlah Rp 2,636,764.04

0.118 Rp 4,578,550.00 Rp 540,268.90


1.120 Rp 307,260.96 Rp 344,132.28
1.469 Rp 215,545.00 Rp 316,635.61
2.938 Rp 215,545.00 Rp 633,271.21
4.000 Rp 65,265.00 Rp 261,060.00
4.000 Rp 30,325.00 Rp 121,300.00
2.000 Rp 27,867.00 Rp 55,734.00
8.939 Rp 41,413.55 Rp 370,195.72
Jumlah Rp 2,642,597.71

0.101 Rp 4,578,550.00 Rp 462,433.55


1.120 Rp 307,260.96 Rp 344,132.28
3.024 Rp 215,545.00 Rp 651,808.08
7.780 Rp 41,413.55 Rp 322,197.42
Jumlah Rp 1,780,571.32
Jumlah Rp 7,059,933.08

1.228 Rp 3,222,841.50 Rp 3,957,649.36


0.979 Rp 2,923,891.50 Rp 2,862,489.78
120.960 Rp 41,390.00 Rp 5,006,534.40
6.600 Rp 58,165.84 Rp 383,894.56
11.000 Rp 27,130.00 Rp 298,430.00
6.600 Rp 41,413.55 Rp 273,329.43
Jumlah Rp 12,782,327.53
0.072 Rp 3,222,841.50 Rp 232,044.59
0.108 Rp 2,923,891.50 Rp 315,780.28
12.750 Rp 41,390.00 Rp 527,722.50
0.135 Rp 94,729.40 Rp 12,788.47
10.125 Rp 65,359.50 Rp 661,764.94
10.125 Rp 192,074.00 Rp 1,944,749.25
12.000 Rp 58,165.84 Rp 697,990.11
26.250 Rp 30,085.00 Rp 789,731.25
10.125 Rp 20,114.00 Rp 203,654.25
3.840 Rp 41,413.55 Rp 159,028.03
Jumlah Rp 5,545,253.67

14.500 Rp 210,384.39 Rp 3,050,573.67


29.000 Rp 42,892.48 Rp 1,243,881.78
29.000 Rp 42,595.25 Rp 1,235,262.19
29.000 Rp 20,114.00 Rp 583,306.00
1.722 Rp 362,220.00 Rp 623,742.84
2.450 Rp 190,260.00 Rp 466,137.00
5.600 Rp 201,510.00 Rp 1,128,456.00
27.851 Rp 41,413.55 Rp 1,153,408.78
Jumlah Rp 9,484,768.27

95.213 Rp 65,359.50 Rp 6,223,074.07


95.213 Rp 192,074.00 Rp 18,287,941.76
84.000 Rp 30,085.00 Rp 2,527,140.00
95.213 Rp 20,114.00 Rp 1,915,114.28
2.940 Rp 41,413.55 Rp 121,755.84
Jumlah Rp 29,075,025.95

30.587 Rp 191,200.00 Rp 5,848,234.40


76.043 Rp 136,351.32 Rp 10,368,563.43
76.043 Rp 136,351.32 Rp 10,368,563.43
Jumlah Rp 26,585,361.25

1.00 Rp 1,000,000.00 Rp 1,000,000.00


Jumlah Rp 1,000,000.00
I ANGGARAN BIAYA
PRASARANA PENDIDIKAN
AS BARU RKB LANTAI 2

JUMLAH

Rp 5,500,000.00
Rp 1,351,461.87
Rp 148,408,259.78
Rp 24,317,502.47
Rp 7,059,933.08
Rp 12,782,327.53
Rp 5,545,253.67
Rp 9,484,768.27
Rp 29,075,025.95
Rp 26,585,361.25
Rp 1,000,000.00

Rp 271,109,893.88

Rp 27,110,989.39

al Rp 298,220,883.27
n Rp 298,200,000.00

Puluh Delapan Juta Dua Ratus Ribu Rupiah

Makassar, Februari 2012


Konsultan Perencana,
CV. Corowali Cemerlang

Ir. Firman
Direktur
REKAPITULASI
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
NAMA SEKOLAH : SDN TAMAMAUNG
LOKASI : JL. AP. PETTARANI III
KECAMATAN / KOTA : PANAKUKANG / MAKASSAR
SUMBER DANA APBD : DANA INSENTIF DAERAH (DID)
TAHUN ANGGARAN : 2011

No. URAIAN

1 Pembangunan Rumah Dinas/Mess (4 Unit)

2 Pembangunan Kantor Kepolisian Pengendali Pengawas Pelabuhan KPPP

3 Pembangunan Pos Jaga Pelabuhan

4 Pembangunan Ruang Genset Pelabuhan

5 Pembangunan Station BBM Pelabuhan

6 Err:509

7 Pembangunan Sarana Ibadah Masjid

8 Pembangunan Tempat Wudhu Mesjid

9 Pembangunan Gerbang Masuk Pelabuhan

10 Pembangunan Gudang Pelabuhan

11 Pengaspalan Jalan, Pembuatan Taman, Pedestrian dan Area Parkir

12 Pembangunan Gedung Terminal Penumpang

13 Pembangunan Menara Pengawas Pelabuhan

14 Pembuatan Pagar BRC Area Pelabuhan


Jumlah Total

Terbilang : Empat Belas Millyar Tujuh Ratus Enam Belas Juta Sembilan Ratu
PRASARANA PENDIDIKAN
AS BARU RKB LANTAI 2

JUMLAH

Err:509

Err:509

Err:509

Err:509

Err:509

Rp 298,200,000.00

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509
l Err:509

las Juta Sembilan Ratus Sembilan Puluh Ribu Rupiah

Ternate, 1 Desember 2009


Konsultan Perencana,
PT Bintang Inti Rekatama

Ir. Iriansyah Tadjuddin


Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Sarana Ibadah Masjid
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN PEKERJAAN SAT.

A PEKERJAAN PERSIAPAN
1 Papan Proyek, P3K dan Mobilisasi Demobilisasi Ls
2 Pemasangan Bowplank M'

B PEKERJAAN TANAH
1 Galian Tanah Pondasi M3
2 Urugan pasir bawah pondasi T=5 cm M3
3 Urugan pasir bawah lantai M3
4 Urugan tanah kembali M3

C PEKERJAAN PONDASI
1 Pas. Batu Kosong Pondasi M3
2 Pas. Pondasi Batu Gunung M3

D PEKERJAAN STRUKTUR BETON


1 Kolom Utama/Teras 30 /30 M3
2 Kolom Praktis 15 /15 M3
3 Sloef Struktur 20/20 M3
4 Ring Balk 15/15 M3

E PEKERJAAN PASANGAN BATU


1 Pasangan Dinding Batu Bata 1 : 4 M2
2 Pasangan Batu Bata Penebalan 1 : 4 M2

F PEK. PLESTERAN DAN ACIAN


1 Plesteran 1 : 5 M2
2 Acian dinding M2

G PASANGAN LANTAI KERAMIK


1 Pas. Rabat Tb.5 cm M2
2 Pas. Lantai Keramik 40/40 M2

H PEK. KUSEN, PINTU, JENDELA & KACA MATI


1 Kusen Pintu & Jendela M3
2 Daun Pintu Panil Bayam M2
3 Daun Pintu dan Jendela Pasangan Kaca M2

I PEKERJAAN ATAP & PLAFOND


1 Pek. Kuda-Kuda Atap Konst. Rangka Kayu Kls I M3
2 Pek. Gording 5/10 Kayu Kls II M3
3 Pek. Kaso dan Reng M2
4 Pas. Atap Metal Roof M2
5 Pek. Plafond Gypsumboard M2
6 Rangka Plafond Besi Hollow M2
7 Rangka dan Plafond Tripleks Overstek Lisplank M2
8 Pek. Lisplank Bayam 2 x 2/20 M1

J PEK. PENGECATAN DAN RESIDU


1 Pengecatan Kayu M2
2 Pengecatan Tembok M2
3 Residu Kayu dan Meni Ls
4 Pengecatan Plafond M2

K PEKERJAAN PENGGANTUNG DAN KUNCI


1 Kunci Tanam Pintu Doble Bh
2 Kunci Tanam Pintu Biasa Bh
3 Engsel Pintu Bh
4 Engsel Jendela Bh
5 Grendel Jendela Bh
6 Hak Angin Bh

L PEK. INSTALASI LISTRIK


1 Titik Nyala TTK
2 Saklar Ganda + Fitting Ex.Broco BH
3 Stop Kontak Ex. Broco BH
4 Lampu Sumpit Philips 28 watt BH
5 Lampu Sumpit Philips 9 watt BH
6 Panel MCB BH
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Sarana Ibadah Masjid
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN STRUKTUR BETON
E PEKERJAAN PASANGAN BATU
F PEK. PLESTERAN DAN ACIAN
G PASANGAN LANTAI KERAMIK
H PEK. KUSEN, PINTU, JENDELA & KACA MATI
I PEKERJAAN ATAP & PLAFOND
J PEK. PENGECATAN DAN RESIDU
K PEKERJAAN PENGGANTUNG DAN KUNCI
L PEK. INSTALASI LISTRIK

Jumlah 1

PPN 10%

Jumlah Total
Dibulatkan

Terbilang :
Err:509
Err:509
Err:509
77,010,000
Err:509
Err:509
Err:509
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2

HARGA
VOL.
SAT. JUMLAH

1.00 Rp 1,000,000.00 Rp 1,000,000.00


80.50 Err:509 Err:509
Err:509

54.74 Rp 40,000.00 Rp 2,189,600.00


3.22 Rp 191,200.00 Rp 615,664.00
6.05 Rp 191,200.00 Rp 1,156,760.00
13.69 Rp 13,333.33 Rp 182,466.67
Rp 4,144,490.67

6.44 Err:509 Err:509


34.21 Err:509 Err:509
Err:509

3.65 Rp 4,206,151.15 Rp 15,331,420.93


1.62 Rp 4,206,151.15 Rp 6,813,964.86
3.22 Rp 3,011,738.75 Rp 9,697,798.76
1.81 Rp 3,918,138.45 Rp 7,096,728.26
Rp 38,939,912.81

124.20 Rp 210,384.39 Rp 26,129,741.41


12.60 Rp 210,384.39 Rp 2,650,843.33
Rp 28,780,584.74
248.40 Err:509 Err:509
248.40 Rp 42,595.25 Rp 10,580,659.60
Err:509

121.00 Rp 967,203.96 Rp 117,031,679.16


121.00 Err:509 Err:509
Err:509

1.18 Rp 4,578,550.00 Rp 5,418,713.93


3.36 Rp 362,220.00 Rp 1,217,059.20
31.44 Rp 215,545.00 Rp 6,776,734.80
Rp 13,412,507.93

1.28 Rp 3,222,841.50 Rp 4,125,237.12


1.76 Rp 2,923,891.50 Rp 5,146,049.04
233.43 Rp 43,000.00 Rp 10,037,490.00
233.43 Rp 41,390.00 Rp 9,661,667.70
121.00 Rp 192,074.00 Rp 23,240,954.00
121.00 Err:509 Err:509
58.56 Rp 167,800.00 Rp 9,826,368.00
52.00 Rp 58,165.84 Rp 3,024,623.81
Err:509

8.40 Rp 41,413.55 Rp 347,873.82


248.40 Err:509 Err:509
1.00 Rp 500,000.00 Rp 500,000.00
179.56 Rp 20,114.00 Rp 3,611,669.84
Err:509

3.00 Rp 230,000.00 Rp 690,000.00


3.00 Rp 460,000.00 Rp 1,380,000.00
24.00 Rp 65,265.00 Rp 1,566,360.00
36.00 Rp 65,265.00 Rp 2,349,540.00
12.00 Rp 65,265.00 Rp 783,180.00
24.00 Rp 30,325.00 Rp 727,800.00
Rp 7,496,880.00
26.00 Rp 100,000.00 Rp 2,600,000.00
13.00 Err:509 Err:509
5.00 Err:509 Err:509
12.00 Err:509 Err:509
13.00 Err:509 Err:509
1.00 Rp 200,000.00 Rp 200,000.00
Err:509
HARGA
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2

JUMLAH

Err:509
Rp 4,144,490.67
Err:509
Rp 38,939,912.81
Rp 28,780,584.74
Err:509
Err:509
Rp 13,412,507.93
Err:509
Err:509
Rp 7,496,880.00
Err:509

Err:509

Err:509

al Err:509
n Err:509

rbilang :

Makassar, Februari 2012


Konsultan Perencana,
CV. Corowali Cemerlang

Ir. Firman
Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Tempat Wudhu Mesjid
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN PEKERJAAN SAT.

A PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank M'

B PEKERJAAN TANAH
1 Galian Tanah Pondasi M3
2 Urugan pasir bawah pondasi T=5 cm M3
3 Urugan pasir bawah lantai M3
4 Urugan tanah kembali M3

C PEKERJAAN PONDASI
1 Pas. Batu Kosong Pondasi M3
2 Pas. Pondasi Batu Gunung M3

D PEKERJAAN STRUKTUR BETON


1 Kolom Praktis 15 /15 M3
2 Sloef Struktur 15/20 M3
3 Ring Balk 13/13 M3

E PEK. PASANGAN BATU, PLESTERAN DAN ACIAN


1 Pasangan Dinding Batu Bata 1 : 4 M2
2 Plesteran 1 : 5 M2
3 Acian dinding M2

G PASANGAN LANTAI KERAMIK


1 Pas. Rabat Tb.5 cm M2
2 Pas. Lantai Keramik 30/30 Motif Kasar M2
4 Pas. Lantai Keramik KM/WC 20/20 M2
5 Pas. Dinding Keramik 20/25 Ex. Roman M2

H PEK. KUSEN, PINTU, JENDELA & KACA MATI


1 Lubang Ventilasi Bayam 20/30 bh
2 Pintu Teakwood KM/WC bh

I PEKERJAAN ATAP & PLAFOND


1 Pek. Kuda-Kuda Atap Konst. Rangka Kayu Kls I M3
2 Pek. Gording 5/10 Kayu Kls II M3
3 Pek. Kaso dan Reng M2
4 Pas. Atap Metal Roof M2
5 Pek. Plafond Gypsumboard M2
6 Rangka Plafond Besi Hollow M2
7 Rangka dan Plafond Tripleks Overstek Lisplank M2
8 Pek. Lisplank Bayam 2 x 2/20 M1

J PEK. PENGECATAN DAN RESIDU


1 Pengecatan Tembok M2
2 Pengecatan Plafond M2

K PEKERJAAN PENGGANTUNG DAN KUNCI


1 Kunci Tanam Pintu Km/Wc bh
2 Engsel Pintu Bh

L PEKERJAAN SANITASI & SUN SCREEN


1 Pas. Closet Jongkok bh
2 Kran Air 3/4" Ex. Onda Bh
3 Floor Drain 3" Bh
4 Septiktank & Peresapan Bh

M PEK. INSTALASI LISTRIK


1 Titik Nyala TTK
2 Saklar Ganda + Fitting Ex.Broco BH
3 Saklar Tunggal + Fitting Ex. Broco BH
4 Stop Kontak Ex.Broco BH
5 Lampu Sumpit Philips 9 watt BH
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Tempat Wudhu Mesjid
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN STRUKTUR BETON
E PEK. PASANGAN BATU, PLESTERAN DAN ACIAN
G PASANGAN LANTAI KERAMIK
H PEK. KUSEN, PINTU, JENDELA & KACA MATI
I PEKERJAAN ATAP & PLAFOND
J PEK. PENGECATAN DAN RESIDU
K PEKERJAAN PENGGANTUNG DAN KUNCI
L PEKERJAAN SANITASI & SUN SCREEN
M PEK. INSTALASI LISTRIK

Jumlah

PPN 10%
Jumlah Total

Dibulatkan

Terbilang :
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2

HARGA
VOL.
SAT. JUMLAH

27.80 Err:509 Err:509


Err:509

14.60 Rp 40,000.00 Rp 583,800.00


1.39 Rp 191,200.00 Rp 265,768.00
1.00 Rp 191,200.00 Rp 191,200.00
3.65 Rp 13,333.33 Rp 48,650.00
Rp 1,089,418.00

1.67 Err:509 Err:509


11.82 Err:509 Err:509
Err:509

0.95 Rp 4,206,151.15 Rp 3,974,812.83


0.83 Rp 3,011,738.75 Rp 2,511,790.11
0.47 Rp 3,918,138.45 Rp 1,840,819.80
Rp 8,327,422.75

48.30 Rp 210,384.39 Rp 10,161,566.10


96.60 Err:509 Err:509
96.60 Rp 42,595.25 Rp 4,114,700.96
Err:509
1.00 Rp 967,203.96 Rp 967,203.96
15.20 Rp 136,351.32 Rp 2,072,540.06
4.80 Err:509 Err:509
17.28 Err:509 Err:509
Err:509

1.00 Err:509 Err:509


2.00 Err:509 Err:509
Err:509

0.28 Rp 3,222,841.50 Rp 886,281.41


0.72 Rp 2,923,891.50 Rp 2,105,201.88
39.00 Rp 43,000.00 Rp 1,677,000.00
39.00 Rp 41,390.00 Rp 1,614,210.00
20.00 Err:509 Err:509
20.00 Rp 192,074.00 Rp 3,841,480.00
10.00 Rp 167,800.00 Rp 1,678,000.00
22.00 Rp 58,165.84 Rp 1,279,648.54
Err:509

96.60 Err:509 Err:509


30.00 Rp 20,114.00 Rp 603,420.00
Err:509

2.00 Rp 230,000.00 Rp 460,000.00


6.00 Rp 65,265.00 Rp 391,590.00
Rp 851,590.00

2.00 Err:509 Err:509


2.00 Err:509 Err:509
2.00 Err:509 Err:509
1.00 Rp 1,500,000.00 Rp 1,500,000.00
Err:509

6.00 Rp 100,000.00 Rp 600,000.00


2.00 Err:509 Err:509
2.00 Err:509 Err:509
1.00 Err:509 Err:509
6.00 Err:509 Err:509
Err:509
HARGA
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2

JUMLAH

Err:509
Rp 1,089,418.00
Err:509
Rp 8,327,422.75
Err:509
Err:509
Err:509
Err:509
Err:509
Rp 851,590.00
Err:509
Err:509

Err:509

Err:509
al Err:509

n Err:509

rbilang :

Makassar, Februari 2012


Konsultan Perencana,
CV. Corowali Cemerlang

Ir. Firman
Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Gerbang Masuk Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN PEKERJAAN SAT.

A PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank M'

B PEKERJAAN TANAH
1 Galian Tanah Pondasi M3
2 Urugan pasir bawah pondasi T=5 cm M3
3 Urugan pasir bawah lantai M3
4 Urugan tanah kembali M3

C PEKERJAAN PONDASI
1 Pas. Batu Kosong Pondasi M3
2 Pas. Pondasi Batu Gunung M3

D PEKERJAAN STRUKTUR BETON


1 Kolom Praktis 15 /15 Pada Loket M3
2 Sloef Struktur 15/20 M3
3 Pekerjaan Plat Dak Atap M3
4 Lisplank Beton 10/50 M3
5 Ring Balk 13/13 M3
6 Pondasi Poer 50x250 cm, Sedalam 1,5 meter M3
7 Kolom 50x250 cm, tinggi 8 meter M3

E PEKERJAAN PASANGAN BATU


1 Pasangan Dinding Batu Bata 1 : 4 M2
2 Profil Beton M2

F PEK. PLESTERAN DAN ACIAN


1 Plesteran 1 : 5 M2
2 Acian dinding M2

G PASANGAN LANTAI KERAMIK


1 Pas. Rabat Tb.5 cm M2
2 Pas. Lantai Keramik 30/30 M2

H PEK. KUSEN, PINTU, JENDELA & KACA MATI


1 Pintu Teakwood Loket bh

I PEKERJAAN ATAP & PLAFOND


1 Pek. Plafond Gypsumboard M2
2 Rangka Plafond Besi Hollow M2

J PEK. PENGECATAN DAN RESIDU


1 Pengecatan Tembok M2
2 Pengecatan Kayu M2
3 Pengecatan Plafond M2

K PEKERJAAN PENGGANTUNG DAN KUNCI


1 Kunci Tanam Pintu bh
2 Engsel Pintu Bh

L PEK. INSTALASI LISTRIK


1 Titik Nyala TTK
2 Saklar Tunggal + Fitting Ex. Broco BH
3 Stop Kontak Ex.Broco BH
4 Lampu Sumpit Philips 18 watt BH
5 Panel MCB BH
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Gerbang Masuk Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN STRUKTUR BETON
E PEKERJAAN PASANGAN BATU
F PEK. PLESTERAN DAN ACIAN
G PASANGAN LANTAI KERAMIK
H PEK. KUSEN, PINTU, JENDELA & KACA MATI
I PEKERJAAN ATAP & PLAFOND
J PEK. PENGECATAN DAN RESIDU
K PEKERJAAN PENGGANTUNG DAN KUNCI
L PEK. INSTALASI LISTRIK

Jumlah

PPN 10%

Jumlah Total
Dibulatkan

Terbilang :
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2


k Pelabuhan

HARGA
VOL.
SAT. JUMLAH

22.50 Err:509 Err:509


Err:509

11.81 Rp 40,000.00 Rp 472,500.00


1.13 Rp 191,200.00 Rp 215,100.00
1.01 Rp 191,200.00 Rp 193,590.00
2.95 Rp 13,333.33 Rp 39,375.00
Rp 920,565.00

1.35 Err:509 Err:509


9.56 Err:509 Err:509
Err:509

1.08 Rp 4,206,151.15 Rp 4,542,643.24


0.68 Rp 3,011,738.75 Rp 2,032,923.65
2.43 Rp 3,564,763.67 Rp 8,662,375.72
1.27 Rp 3,564,763.67 Rp 4,527,249.86
0.38 Rp 3,918,138.45 Rp 1,489,872.14
3.75 Rp 3,011,738.75 Rp 11,294,020.30
20.00 Rp 4,206,151.15 Rp 84,123,022.92
Rp 116,672,107.84

153.00 Rp 210,384.39 Rp 32,188,811.88


78.30 Rp 176,000.00 Rp 13,780,800.00
Rp 45,969,611.88

306.00 Err:509 Err:509


306.00 Rp 42,595.25 Rp 13,034,145.89
Err:509

1.01 Rp 967,203.96 Rp 979,294.01


20.25 Rp 136,351.32 Rp 2,761,114.23
Rp 3,740,408.24

2.00 Err:509 Err:509


Err:509

20.25 Rp 192,074.00 Rp 3,889,498.50


20.25 Err:509 Err:509
Err:509

306.00 Err:509 Err:509


6.30 Rp 41,413.55 Rp 260,905.37
20.25 Rp 20,114.00 Rp 407,308.50
Err:509

2.00 Rp 230,000.00 Rp 460,000.00


6.00 Rp 65,265.00 Rp 391,590.00
Rp 851,590.00

2.00 Rp 100,000.00 Rp 200,000.00


2.00 Err:509 Err:509
2.00 Err:509 Err:509
2.00 Err:509 Err:509
1.00 Rp 200,000.00 Rp 200,000.00
Err:509
HARGA
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2


k Pelabuhan

JUMLAH

Err:509
Rp 920,565.00
Err:509
Rp 116,672,107.84
Rp 45,969,611.88
Err:509
Rp 3,740,408.24
Err:509
Err:509
Err:509
Rp 851,590.00
Err:509

Err:509

Err:509

al Err:509
n Err:509

rbilang :

Makassar, Februari 2012


Konsultan Perencana,
CV. Corowali Cemerlang

Ir. Firman
Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Gudang Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN PEKERJAAN SAT.

A PEKERJAAN RANGKA BAJA


1 Base Plat Angkur tb. 14 mm KG
2 Angkur Baut 19 p=540 mm BH
3 Tiang Kolom IWF 300x150x6,5 KG
4 Balok IWF150x125x6 KG
5 Rafter Kuda-kuda IWF 200 x125x6 KG
6 Overstek Rafter IWF 150x75x5 KG
7 Plat Buhul tb. 12 mm KG
8 Stiffener Plat 6 mm KG
9 Mur Baut 16 p=50 mm BH
10 Gording CNP 150x50x2,8 KG
11 Tambat Gording Plat tb. 6 mm KG
12 Trektang Besi 12 mm BH
13 Jarum Keras 12 BH
14 Zingcromate ( Pengecatan ) KG

B PEKERJAAN ATAP SPANDEK


1 Pek. Atap Spandek tb. 0.3 M2

C PEK. BATU, PLESTERAN, ACIAN & CAT


1 Pas. Batu Bata 1 : 4 M2
2 Plesteran M2
3 Acian M2
4 Pengecatan Dinding M2

D PEK. FINNISHING
1 Pek. Pembersihan Sisa Pekerjaan Ls
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembangunan Gudang Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN RANGKA BAJA


B PEKERJAAN ATAP SPANDEK
C PEK. BATU, PLESTERAN, ACIAN & CAT
D PEK. FINNISHING

Jumlah

PPN 10%

Jumlah Total

Dibulatkan

Terbilang :
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2

HARGA
VOL.
SAT. JUMLAH

303.20 Err:509 Err:509


97.00 Rp 50,000.00 Rp 4,850,000.00
6,827.18 Err:509 Err:509
1,786.84 Err:509 Err:509
5,698.56 Err:509 Err:509
396.37 Err:509 Err:509
511.83 Err:509 Err:509
24.89 Err:509 Err:509
390.00 Rp 8,500.00 Rp 3,315,000.00
10,470.36 Err:509 Err:509
77.26 Err:509 Err:509
678.00 Rp 10,500.00 Rp 7,119,000.00
22.00 Rp 35,000.00 Rp 770,000.00
26,028.97 Rp 500.00 Rp 13,014,485.61
Err:509

882.00 Rp 87,000.00 Rp 76,734,000.00


Rp 76,734,000.00

832.00 Rp 210,384.39 Rp 175,039,813.61


1,664.00 Err:509 Err:509
1,664.00 Rp 42,595.25 Rp 70,878,492.67
1,664.00 Err:509 Err:509
Err:509

1.00 Rp 2,000,000.00 Rp 2,000,000.00


Rp 2,000,000.00
HARGA
PRASARANA PENDIDIKAN

AS BARU RKB LANTAI 2

JUMLAH

Err:509
Rp 76,734,000.00
Err:509
Rp 2,000,000.00

Err:509

% Err:509

otal Err:509

an Err:509

erbilang :
Makassar, Februari 2012
Konsultan Perencana,
CV. Corowali Cemerlang

Ir. Firman
Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN

PEKERJAAN

DESA / KECAMATAN
KABUPATEN
PROPINSI

No. URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN
1 Pembukaan dan Pematangan Lahan
2 Papan Nama Proyek
3 Direksi Keet/Barak Kerja
4 Mobilisasi dan Demobolisasi
5 Pelaporan dan Dokumentasi

B PEKERJAAN SALURAN/DRAINASE
1 Galian Tanah Saluran Drainase sedalam 80 cm
2 Pasangan Batu Bata 1 : 3
3 Plesteran
4 Pek. Plat Duicker Saluran

C PEKERJAAN PEMBENTUKAN SIRKULASI JALAN


1 Galian Casteen sedalam 30 cm
2 Pek. Alas Pasir Bawah Casteen
3 Pek. Casteen Block Beton
4 Pek. Plesteran Nat Sambungan Casteen
5 Pek. Pengecatan Casteen

D PEKERJAAN PEDESTRIAN PEJALAN KAKI


1 Pek. Tanah Urug
2 Pek. Pasir Urug Bawah Keramik
3 Pek. Rabat Selapis Bata Bawah Lantai Keramik
4 Pek. Keramik Tekstur Kasar 30x30 cm
5 Pek. Border/ Les Batu Koral Tanam 20 cm

E PEKERJAAN TAMAN DUA JALUR DAN AREA PARKIR


1 Pek. Tanah Urug
2 Tanam Pohon Palm Raja Jarak 5 M
3 Rumput Gajah Mini Lokal
4 Tanam Pohon Peneduh Angsana
5 Tanam Bunga Pagar Pangkas Kuning & Asoka

F PEKERJAAN TAMAN TENGAH


1 Pek. Rabat Pejalan Kaki Sisi Jalan
2 Pek. Pasangan Batu Koral Kwaci Tanam
3 Pek. Pagar Keliling Taman
4 Pek. Tanah Urug (Humus/Subur)
5 Pek. Pedestrian Pembagi Taman 30x30
6 Pek. Taman Jaring
- Pek. Cor Beton Bertulang Pondasi Tiang Pipa
- Pek. Tiang Pipa Giv 2"
- Pek. Jaring Pengikat Sling dia 1 cm
- Pas. Batu Bata Pembatas 6 x 6 m
- Pek. Rabat Alas Lantai tb. 6 cm
- Pas. Keramik 40x40 Motif
- Pas. Batu Koral Tanam
- Pengadaan Pot Bunga dan Bunga Asoka

7 Pek. Pembuatan Dudukan Pot


8 Pot dan Bunga Bogenvil
9 Penanaman Bunga Lili Paris
10 Penanaman Bunga Krokot
11 Penanaman Asoka dan Pangkas Kuning
12 Penanaman Rumput Gajah Mini Lokal

G PEKERJAAN TAMAN UCAPAN SELAMAT DATANG


1 Pek. Lantai Rabat Beton
2 Pek. Taman
3 Pek. Pondasi Poer Pilar
4 Pek. Pilar Beton dia 40 cm
5 Pek. Topi Profil Ukir Tiang Pilar
6 Pek. Plat dak
7 Pek. Profil Beton
8 Pek. Penanaman Bunga Semak Hias
9 Pengadaan Huruf " SELAMAT DATANG DERMAGA SAKETA"

H PEK. PENGASPALAN JALAN & AREA PARKIR V=10526 M2


1 Lapis Pondasi Bawah (LPB) Agregat Kasar
2 Lapis Pondasi Atas (LPA) Agregat Halus
3 Primecot (Lapis Pengikat)
4 Aspal (AC - BC) Tb. 5 cm

I PEK. LAMPU JALAN DAN LAMPU TAMAN


1 Pek. Instalasi Titik Nyala Listrik
2 Pek. Jaringan Kabel Instalasi
3 Pengadaan dan Pemasangan Lampu Jalan dan Tiang
4 Pengadaan dan Pemasangan Lampu Taman

J PEKERJAAN FINNISHING
1 Pek. Penyiraman Tanaman
2 Pek. Pembersihan Area Lokasi
REKAPITULASI QUANTITAS HARGA
KEGIATAN

PEKERJAAN

DESA / KECAMATAN
KABUPATEN
PROPINSI

No. URAIAN

A PEKERJAAN PERSIAPAN

B PEKERJAAN SALURAN/DRAINASE

C PEKERJAAN PEMBENTUKAN SIRKULASI JALAN

D PEKERJAAN PEDESTRIAN PEJALAN KAKI

E PEKERJAAN TAMAN DUA JALUR DAN AREA PARKIR

F PEKERJAAN TAMAN TENGAH

G PEKERJAAN TAMAN UCAPAN SELAMAT DATANG

H PEK. PENGASPALAN JALAN & AREA PARKIR V=10526 M2

I PEK. LAMPU JALAN DAN LAMPU TAMAN

J PEKERJAAN FINNISHING
Terbilang :
UANTITAS DAN HARGA
: PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
: PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pengaspalan Jalan, Pembuatan Taman, Pedestrian dan Area Parkir
: PANAKUKANG / MAKASSAR
: HALMAHERA SELATAN
: MALUKU UTARA

URAIAN PEKERJAAN SAT. VOL.

PERSIAPAN
an Pematangan Lahan M2 11,648.00
Ls 1.00
Ls 1.00
Demobolisasi Ls 1.00
n Dokumentasi Ls 1.00

SALURAN/DRAINASE
Saluran Drainase sedalam 80 cm M3 876.16
u Bata 1 : 3 M3 1,081.51
M3 3,956.41
ker Saluran M3 7.17

PEMBENTUKAN SIRKULASI JALAN


n sedalam 30 cm M3 164.28
r Bawah Casteen M3 68.45
Block Beton M' 1,369.00
n Nat Sambungan Casteen Nat 136.90
an Casteen M2 766.64

PEDESTRIAN PEJALAN KAKI


M3 65.94
g Bawah Keramik M3 10.99
lapis Bata Bawah Lantai Keramik M3 10.99
Tekstur Kasar 30x30 cm M2 182.40
Les Batu Koral Tanam 20 cm M2 37.40

TAMAN DUA JALUR DAN AREA PARKIR


M3 57.23
Palm Raja Jarak 5 M PHN 22.00
M2 190.76
Peneduh Angsana PHN 25.00
Pagar Pangkas Kuning & Asoka M' 235.00

TAMAN TENGAH
jalan Kaki Sisi Jalan M3 9.00
n Batu Koral Kwaci Tanam M2 156.00
liling Taman M' 108.00
rug (Humus/Subur) M3 218.70
n Pembagi Taman 30x30 M2 64.80

Beton Bertulang Pondasi Tiang Pipa M3 0.60


g Pipa Giv 2" BTG 25.25
g Pengikat Sling dia 1 cm M' 50.00
Bata Pembatas 6 x 6 m M2 21.60
at Alas Lantai tb. 6 cm M3 0.26
mik 40x40 Motif M2 31.30
Koral Tanam M2 28.00
n Pot Bunga dan Bunga Asoka Ls 8.00

an Dudukan Pot BH 8.00


BH 8.00
unga Lili Paris M' 108.00
unga Krokot M' 108.00
soka dan Pangkas Kuning M' 108.00
umput Gajah Mini Lokal M2 625.00

TAMAN UCAPAN SELAMAT DATANG


M3 2.70
Ls 1.00
M3 3.52
on dia 40 cm M3 5.93
il Ukir Tiang Pilar BH 7.00
M3 6.30
M' 58.80
man Bunga Semak Hias Ls 1.00
uruf " SELAMAT DATANG DERMAGA SAKETA" BH 27.00

SPALAN JALAN & AREA PARKIR V=10526 M2


Bawah (LPB) Agregat Kasar M3 2105.20
Atas (LPA) Agregat Halus M2 10526.00
is Pengikat) M2 10526.00
M3 526.30

JALAN DAN LAMPU TAMAN


Titik Nyala Listrik ttk 105.00
Kabel Instalasi m' 431.00
an Pemasangan Lampu Jalan dan Tiang ttk 25.00
an Pemasangan Lampu Taman ttk 80.00

FINNISHING
man Tanaman BLN 3.00
han Area Lokasi Ls 1.00
ASI QUANTITAS HARGA
: PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
: PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pengaspalan Jalan, Pembuatan Taman, Pedestrian dan Area Parkir
: PANAKUKANG / MAKASSAR
: HALMAHERA SELATAN
: MALUKU UTARA

URAIAN

ALURAN/DRAINASE

EMBENTUKAN SIRKULASI JALAN

EDESTRIAN PEJALAN KAKI

AMAN DUA JALUR DAN AREA PARKIR

AMAN TENGAH

AMAN UCAPAN SELAMAT DATANG

PALAN JALAN & AREA PARKIR V=10526 M2

ALAN DAN LAMPU TAMAN


Jumlah

PPN 10%

Jumlah Total

Dibulatkan

Terbilang :

Makassar, Februari 2012


Konsultan Perencana,
CV. Corowali Cemerlang
HARGA
SAT. JUMLAH

Err:509 Err:509
Rp 500,000.00 Rp 500,000.00
Rp 3,000,000.00 Rp 3,000,000.00
Rp 10,000,000.00 Rp 10,000,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Err:509

Rp 40,000.00 Rp 35,046,400.00
Err:509 Err:509
Rp 42,892.48 Rp 169,700,217.93
Rp 3,011,738.75 Rp 21,588,143.33
Err:509

Rp 40,000.00 Rp 6,571,200.00
Rp 191,200.00 Rp 13,087,640.00
Err:509 Err:509
Rp 50,000.00 Rp 6,845,000.00
Err:509 Err:509
Err:509

Err:509 Err:509
Rp 191,200.00 Rp 2,101,288.00
Rp 967,203.96 Rp 10,629,571.52
Rp 136,351.32 Rp 24,870,480.77
Rp 210,000.00 Rp 7,854,000.00
Err:509

Err:509 Err:509
Err:509 Err:509
Rp 45,000.00 Rp 8,584,200.00
Err:509 Err:509
Err:509 Err:509
Err:509

Rp 967,203.96 Rp 8,704,835.64
Rp 210,000.00 Rp 32,760,000.00
Rp 750,000.00 Rp 81,000,000.00
Err:509 Err:509
Rp 136,351.32 Rp 8,835,565.54

Rp 4,206,151.15 Rp 2,523,690.69
Rp 328,000.00 Rp 8,282,000.00
Rp 25,000.00 Rp 1,250,000.00
Rp 210,384.39 Rp 4,544,302.85
Rp 967,203.96 Rp 250,699.27
Err:509 Err:509
Err:509 Err:509
Rp 180,000.00 Rp 1,440,000.00
Per Unit Err:509
Dikali 4 unit Err:509
Rp 1,500,000.00 Rp 12,000,000.00
Rp 500,000.00 Rp 4,000,000.00
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Rp 45,000.00 Rp 28,125,000.00
Err:509

Rp 967,203.96 Rp 2,612,495.69
Rp 1,000,000.00 Rp 1,000,000.00
Rp 4,206,151.15 Rp 14,792,192.35
Rp 4,206,151.15 Rp 24,961,824.59
Rp 2,500,000.00 Rp 17,500,000.00
Rp 4,206,151.15 Rp 26,498,752.22
Rp 250,000.00 Rp 14,700,000.00
Rp 1,500,000.00 Rp 1,500,000.00
Rp 150,000.00 Rp 4,050,000.00
Rp 107,615,264.85

Err:509 Err:509
Err:509 Err:509
Rp 15,000.00 Rp 157,890,000.00
Rp 1,875,000.00 Rp 986,812,500.00
Err:509

Rp 350,000.00 Rp 36,750,000.00
Rp 120,000.00 Rp 51,720,000.00
Rp 7,500,000.00 Rp 187,500,000.00
Err:509 Err:509
Err:509

Rp 1,500,000.00 Rp 4,500,000.00
Rp 1,000,000.00 Rp 1,000,000.00
Rp 5,500,000.00
JUMLAH

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Rp 107,615,264.85

Err:509

Err:509

Rp 5,500,000.00
Err:509

Err:509

Err:509

Err:509

Makassar, Februari 2012


Konsultan Perencana,
CV. Corowali Cemerlang

Ir. Firman
Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB
Pembangunan Gedung Terminal Penump
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

NO URAIAN PEKERJAAN VOLUME

A PEKERJAAN PENDAHULUAN
1 Pas. Stelling Kerja 1.000 Ls
2 Listrik Kerja 5.000 Bln
3 Direksi Keet 1.000 Ls

B PEKERJAAN TANAH DAN PONDASI


1 Pek. Galian Tanah 264.305 M3
2 Pek. Pas. Batu Kali 1 : 3 28.713 M3
3 Pek Pas. Batu Kosong 13.234 M3
4 Pek. Urugan Tanah Kembali 141.076 M3
5 Pek. Urugan Pasir Bawah Pondasi 2.795 M3
6 Pek. Urugan Pasir Bawah Lantai 22.178 M3

C PEKERJAAN BETON
1 Sloef Beton 20 X 25Cm Beton 1 : 2 : 3 7.094 M3
2 Sloef Beton 10 X 15Cm Beton 1 : 2 : 3 4.255 M3
3 Kolom Praktis 15 X 15Cm Beton 1 : 2 : 3 5.973 M3
5 Kolom Utama 30 X 40Cm Beton 1 : 2 : 3 21.380 M3
7 Ring Balk 15 X 20Cm Beton 1 : 2 : 3 6.040 M3
8 Tiang Beton 25 X 25Cm 4.038 M3
9 Kanopi Beton t = 8Cm 2.904 M3
10 Pondasi Poer Beton 100 X 150 Cm 12.486 M3

D PEKERJAAN DINDING & LANTAI


1 Pas. Dinding 1/2 Bata 1 : 4 910.000 M2
2 Pek. Plesteran 1 : 5 1820.000 M2
3 Penebalan Plester 2 Cm 273.000 M2
4 Pek. Acian Tembok 1820.000 M2
5 Pek. Pas. Batu Bata Bawah Lantai 772.000 M2
6 Pek. Lantai Keramik 40 X 40Cm 772.000 M2
7 Pek. Lantai Keramik Teras 30 X 30Cm 231.600 M2
8 Pek. Lantai WC/KM Keramik 20 X 20 58.000 M2
9 Pek. Tegel Keramik Untuk Dinding WC/KM 20/25 116.000 M2
10 Pek. Lantai Rabat Beton t = 5Cm 1 : 3 : 6 4.420 M3
11 Pek. Rangka Plafond Gypsum 772.000 M2
12 Pek. Plafond Gypsum Board 9m 772.000 M2

E PEKERJAAN DAUN PINTU & JENDELA


1 Pek Kusen Pintu dan Jendela 3.502 M3
2 Pek. Kaca Mati 57.000 M2
3 Pek. Daun Pintu Panil 45.800 M2
4 Pek. Daun Pintu Panil Kaca 35.000 M2
5 Pek. Daun Pintu KM/WC Double Teakwood 7.680 M2
6 Pek. Daun Jendela + Pas. Kaca 25.460 M2

F PEKERJAAN ATAP RANGKA BAJA


1 Pedestal IWF 200x100x6.5x9 281.600 Kg
2 Rafter IWF 150x75x5x7 3135.440 Kg
3 Pengaku 1/2 IWF 150x75x5x7 178.640 Kg
4 CNP 100x50x2.3 3168.015 Kg
5 Base Plat PL 12mm 100.100 Kg
6 Plat Buhul dan Simpul Momen PL 10 mm 265.160 Kg
7 Stiffener dan Sirip PL 8 mm 184.184 Kg
8 Tambat Gording PL 6m 69.541 Kg
9 Mur-Baut Angkur Dia. 16 mm P. 300 mm 144.000 bh
10 Mur baut Dia. 16 mm P. 50mm 512.400 bh
11 Mur Baut Gording Dia 10mm P.30mm 714.000 bh
12 Tie Rod Dia. 10 mm 152.000 bh
13 Crosstang Dia. 12mm 430.100 Kg
14 Torn Buckle 16.000 bh
15 Balok Kasau 4/6 5.060 m3
16 Kayu reng 2/3 2.860 m3
17 Weremesh dan Aluminium Foil 769.420 m2
18 Atap Spandek Zincalum 769.420 m2
19 Bubungan Metal Roof dan bubungan Jurai 47.000 m'

G PEKERJAAN KUNCI DAN PENGGANTUNG


1 Pek. Kunci Tanam 2L Pintu Utama 6.000 Bh
2 Pek. Kunci Tanam 2L Pintu Biasa 24.000 Bh
3 Pas. Kunci Tanam 2L Pintu Kamar Mandi 6.000 Bh

H PEKERJAAN SANITASI
1 Closed Duduk 6.000 Bh
2 Urinoir 8.000 Bh
3 Pas. Pipa PVC AW Dia. 4" 57.500 M1
4 Instalasi Air Bersih Pipa Dia.3/4" 75.000 M1
5 Kran Air 3/4 8.000 Bh
6 Floor Drain 4.000 Bh
7 Pek. Septic Tank 2.000 Bh

I PEKERJAAN ELEKTRIKAL
1 Pek. Lampu RM 2 X 20Watt 40.000 Bh
2 Pek. Lampu 20 Watt + Bricket Downlight 10Cm 120.000 Bh
3 Pek. Saklar + Stop Kontak 260.000 Bh
4 Pek. Sekring Group + Arde 4.000 ttk
5 Pek. Instalasi Penangkal Petir 1.000 Ls

J PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 1 X Dasar + Akhir 2X 1,820.000 M2
2 Pek. Pengecatan Plafond 717.304 M2
3 Pek. Pengecatan Kayu 172.79 M2

K PEKERJAAN PEMBERSIHAN
1 Pembersihan & Mengangkut Sisa Pekerjaan 1.000 Ls
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB
Pembangunan Gedung Terminal Penump
KELURAHAN / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN PENDAHULUAN
B PEKERJAAN TANAH DAN PONDASI
C PEKERJAAN BETON
D PEKERJAAN DINDING & LANTAI
E PEKERJAAN DAUN PINTU & JENDELA
F PEKERJAAN ATAP RANGKA BAJA
G PEKERJAAN KUNCI DAN PENGGANTUNG
H PEKERJAAN SANITASI
I PEKERJAAN ELEKTRIKAL
J PEKERJAAN PENGECATAN
K PEKERJAAN PEMBERSIHAN

Jumlah

PPN 10%

Jumlah
Pembulatan

Terbilang :
TAN SARANA DAN PRASARANA PENDIDIKAN

NAN 1 RUANG KELAS BARU RKB LANTAI 2


an Gedung Terminal Penumpang
NG / MAKASSAR
A SELATAN

HARGA SATUAN JUMLAH HARGA

Rp. 5,000,000.00 Rp. 5,000,000.00


Rp. 2,500,000.00 Rp. 12,500,000.00
Rp. 7,500,000.00 Rp. 7,500,000.00
Rp. 25,000,000.00

Rp. 40,000.00 Rp. 10,572,208.00


Rp. 967,203.96 Rp. 27,771,798.82
Rp. 191,200.00 Rp. 2,530,379.04
Err:509 Err:509
Rp. 191,200.00 Rp. 534,365.76
Rp. 191,200.00 Rp. 4,240,338.00
Err:509

Rp. 3,011,738.75 Rp. 21,363,768.79


Rp. 3,011,738.75 Rp. 12,814,044.84
Rp. 4,206,151.15 Rp. 25,121,237.72
Rp. 4,206,151.15 Rp. 89,927,511.50
Rp. 3,918,138.45 Rp. 23,665,556.21
Rp. 4,206,151.15 Rp. 16,982,335.25
Rp. 3,011,738.75 Rp. 8,746,089.32
Rp. 3,011,738.75 Rp. 37,604,569.98
Rp. 236,225,113.63

Rp. 210,384.39 Rp. 191,449,796.14


Rp. 42,892.48 Rp. 78,064,304.92
Rp. 42,892.48 Rp. 11,709,645.74
Rp. 42,595.25 Rp. 77,523,351.36
Rp. 210,384.39 Rp. 162,416,750.13
Err:509 Err:509
Rp. 136,351.32 Rp. 31,578,965.71
Rp. 136,351.32 Rp. 7,908,376.56
Err:509 Err:509
Rp. 191,200.00 Rp. 845,104.00
Rp. 27,130.00 Rp. 20,944,360.00
Rp. 58,165.84 Rp. 44,904,030.41
Err:509

Rp. 4,578,550.00 Rp. 16,033,269.41


Rp. 215,545.00 Rp. 12,286,065.00
Err:509 Err:509
Rp. 307,260.96 Rp. 10,754,133.60
Err:509 Err:509
Rp. 307,260.96 Rp. 7,822,864.04
Err:509

Err:509 Err:509
Rp. 50,000.00 Rp. 156,772,000.00
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Rp. 23,059.00 Rp. 3,320,496.00
Rp. 17,559.00 Rp. 8,997,231.60
Rp. 19,649.00 Rp. 14,029,386.00
Rp. 15,000.00 Rp. 2,280,000.00
Err:509 Err:509
Rp. 14,204.00 Rp. 227,264.00
Rp. 1,357,425.00 Rp. 6,868,570.50
Rp. 1,357,425.00 Rp. 3,882,235.50
Err:509 Err:509
Rp. 2,923,891.50 Rp. 2,249,700,597.93
Rp. 41,390.00 Rp. 1,945,330.00
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Rp. 860,000.00 Rp. 6,880,000.00
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Rp. 8,000,000.00 Rp. 16,000,000.00
Err:509

Rp. 310,000.00 Rp. 12,400,000.00


Rp. 210,000.00 Rp. 25,200,000.00
Err:509 Err:509
Rp. 250,000.00 Rp. 1,000,000.00
Rp. 2,500,000.00 Rp. 2,500,000.00
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Rp. 5,000,000.00 Rp. 5,000,000.00


Rp. 5,000,000.00
RGA
TAN SARANA DAN PRASARANA PENDIDIKAN

NAN 1 RUANG KELAS BARU RKB LANTAI 2


an Gedung Terminal Penumpang
NG / MAKASSAR
A SELATAN

JUMLAH

Rp 25,000,000.00
Err:509
Rp 236,225,113.63
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Rp 5,000,000.00

Err:509

Err:509

Err:509
Err:509

Terbilang :

Makassar, Februari 2012


Konsultan Perencana,
CV. Corowali Cemerlang

Ir. Firman
Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RK
Pembangunan Menara Pengawas Pelab
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

NO URAIAN PEKERJAAN VOLUME

A PEKERJAAN PENDAHULUAN
1 Pas. Stelling Kerja 1.000 Ls
2 Listrik Kerja 3.000 Bln

B PEKERJAAN TANAH DAN PONDASI


1 Pek. Galian Tanah 48.600 M3
3 Pek. Batu Kosong Alas Poer 2.430 M3
4 Pek. Urugan Tanah Kembali 12.150 M3
5 Pek. Urugan Pasir Bawah Pondasi 0.810 M3
6 Pek. Urugan Pasir Bawah Lantai 0.380 M3

C PEKERJAAN BETON
1 Pondasi Poer Plat Sumuran 14.700 M3
2 Sloef Beton 30 X 50 Cm 1.575 M3
2 Sloef Beton 20 X 30 Cm Pengikat Sloef 1.146 M3
3 Kolom Utama T=12 m 11.328 M3
5 Kolom Miring 13 X 18 cm 0.800 M3
7 Plat Lantai Beton 3.798 M3
8 Plat Dak Beton 1.944 M3
9 Lisplank Beton 8 X 40 cm 0.806 M3

D PEKERJAAN DINDING & LANTAI


1 Pas. Dinding 1/2 Bata 1 : 4 91.200 M2
2 Pek. Plesteran 1 : 5 182.400 M2
3 Penebalan Plester 2 Cm 27.360 M2
4 Pek. Acian Tembok 182.400 M2
5 Pek. Pas. Batu Bata Bawah Lantai 7.600 M2
6 Pek. Lantai Keramik 30 X 30Cm 35.520 M2
7 Pek. Rangka Plafond Gypsum 28.650 M2
8 Pek. Plafond Gypsum Board 9m 28.650 M2

E PEKERJAAN INTU DAN JENDELA KACA TEMPER


1 Pek. Kusen Pintu 1.000 bh
2 Pek. Daun Pintu Panil Kaca 1.000 bh
3 Pasang Kaca Temper 15 mm, Pd Area Pengawasan 50.400 M2

F PEKERJAAN ATAP RANGKA BAJA DAN TANGGA


1 Rangka Baja Ringan 37.245 m2
2 Penutup Atap Spandek 100.100 m2
3 Jurai Luar 29.600 m'
4 Tangga Putar besi 12.000 m'

G PEKERJAAN KUNCI DAN PENGGANTUNG


1 Pek. Kunci Tanam 2L 1.000 Bh
2 Pek. Engsel 3.000 Bh

H PEKERJAAN ELEKTRIKAL
1 Pek. Lampu Sorot Dalam Menara 1.000 Bh
2 Pek. Lampu 20 Watt + Bricket Downlight 10 Cm 6.000 Bh
3 Pek. Saklar + Stop Kontak 5.000 Bh
4 Pek. Sekring Group + Arde 1.000 ttk
5 Pek. Instalasi Penangkal Petir 1.000 Ls

I PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 1 X Dasar + Akhir 2X 182.400 M2
2 Pek. Pengecatan Plafond 28.650 M2
3 Pek. Pengecatan Kayu 1.00 Ls

J PEKERJAAN PEMBERSIHAN
1 Pembersihan & Mengangkut Sisa Pekerjaan 1.000 Ls
REKAPITULASI QUANTITAS HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RK
Pembangunan Menara Pengawas Pelab
KELURAHAN / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEKERJAAN PENDAHULUAN
B PEKERJAAN TANAH DAN PONDASI
C PEKERJAAN BETON
D PEKERJAAN DINDING & LANTAI
E PEKERJAAN INTU DAN JENDELA KACA TEMPER
F PEKERJAAN ATAP RANGKA BAJA DAN TANGGA
G PEKERJAAN KUNCI DAN PENGGANTUNG
H PEKERJAAN ELEKTRIKAL
I PEKERJAAN PENGECATAN
J PEKERJAAN PEMBERSIHAN

Jumlah

PPN 10%
Jumlah

Pembulatan

Terbilang :
ATAN SARANA DAN PRASARANA PENDIDIKAN

GUNAN 1 RUANG KELAS BARU RKB LANTAI 2


unan Menara Pengawas Pelabuhan
ANG / MAKASSAR
ERA SELATAN

HARGA SATUAN JUMLAH HARGA

Rp. 1,000,000.00 Rp. 1,000,000.00


Rp. 500,000.00 Rp. 1,500,000.00
Rp. 2,500,000.00

Rp. 40,000.00 Rp. 1,944,000.00


Rp. 191,200.00 Rp. 464,616.00
Err:509 Err:509
Rp. 191,200.00 Rp. 154,872.00
Rp. 191,200.00 Rp. 72,656.00
Err:509

Rp. 3,011,738.75 Rp. 44,272,559.57


Rp. 3,011,738.75 Rp. 4,743,488.52
Rp. 3,011,738.75 Rp. 3,451,452.60
Rp. 4,206,151.15 Rp. 47,647,280.18
Rp. 4,206,151.15 Rp. 3,366,098.64
Rp. 3,918,138.45 Rp. 14,881,089.82
Rp. 3,918,138.45 Rp. 7,616,861.14
Rp. 3,011,738.75 Rp. 2,426,738.61
Rp. 128,405,569.08

Rp. 210,384.39 Rp. 19,187,056.49


Rp. 42,892.48 Rp. 7,823,587.48
Rp. 42,892.48 Rp. 1,173,538.12
Rp. 42,595.25 Rp. 7,769,373.24
Rp. 210,384.39 Rp. 1,598,921.37
Rp. 136,351.32 Rp. 4,843,198.89
Rp. 27,130.00 Rp. 777,274.50
Rp. 58,165.84 Rp. 1,666,451.39
Rp. 44,839,401.48

Rp. 550,000.00 Rp. 550,000.00


Rp. 900,000.00 Rp. 900,000.00
Rp. 850,000.00 Rp. 42,840,000.00
Rp. 44,290,000.00

Rp. 3,222,841.50 Rp. 120,034,731.67


Rp. 2,923,891.50 Rp. 292,681,539.15
Rp. 95,000.00 Rp. 2,812,000.00
Rp. 2,200,000.00 Rp. 26,400,000.00
Rp. 441,928,270.82

Err:509 Err:509
Err:509 Err:509
Err:509

Rp. 2,100,000.00 Rp. 2,100,000.00


Rp. 210,000.00 Rp. 1,260,000.00
Err:509 Err:509
Rp. 250,000.00 Rp. 250,000.00
Rp. 2,500,000.00 Rp. 2,500,000.00
Err:509

Err:509 Err:509
Err:509 Err:509
Rp. 250,000.00 Rp. 250,000.00
Err:509

Rp. 1,500,000.00 Rp. 1,500,000.00


Rp. 1,500,000.00
ATAN SARANA DAN PRASARANA PENDIDIKAN

GUNAN 1 RUANG KELAS BARU RKB LANTAI 2


unan Menara Pengawas Pelabuhan
ANG / MAKASSAR
ERA SELATAN

JUMLAH

Rp 2,500,000.00
Err:509
Rp 128,405,569.08
Rp 44,839,401.48
Rp 44,290,000.00
Rp 441,928,270.82
Err:509
Err:509
Err:509
Rp 1,500,000.00

Err:509

Err:509
Err:509

Err:509

Terbilang :

Makassar, Februari 2012


Konsultan Perencana,
CV. Corowali Cemerlang

Ir. Firman
Direktur
DAFTAR QUANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembuatan Pagar BRC Area Pelabuhan
DESA / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

NO URAIAN PEKERJAAN VOLUME

A PEK. TANAH DAN PONDASI


1 Pemasangan Bouplank 1.00 Ls
2 Galian Tanah Pondasi Pagar 252.50 M
3 Pek. Sloef Beton Bertulang 13/13 11.83 M
5 Pas. Batu Bata 1 : 4 245.00 M
6 Pek. Plesteran 1 : 4 490.00 M

B PEK. PAGAR
1 Tiang Pipa GIP 2", Jarak 3 m, tinggi 1,6 m 234.00 ttk
2 Pasang Pagar BRC dia 8 700.00 M'
3 Pek. Pembersihan Sisa Pekerjaan 1.00 Ls

REKAPITULASI QUANTITAS HARGA


KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PENDIDIKAN
Err:509
PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU RKB LANTAI 2
Pembuatan Pagar BRC Area Pelabuhan
KELURAHAN / KECAMATAN : PANAKUKANG / MAKASSAR
KABUPATEN : HALMAHERA SELATAN
PROPINSI : MALUKU UTARA

No. URAIAN

A PEK. TANAH DAN PONDASI

B PEK. PAGAR

Jumlah

PPN 10%

Jumlah

Pembulatan

Terbilang :

Makass
Kons
CV. Co
N PRASARANA PENDIDIKAN

KELAS BARU RKB LANTAI 2


a Pelabuhan

HARGA SATUAN JUMLAH HARGA

Rp 1,000,000.00 1,000,000.00
Rp 40,000.00 10,100,000.00
Rp 3,011,738.75 35,628,869.37
Rp 210,384.39 51,544,175.88
Rp 42,892.48 21,017,312.86
Rp. 119,290,358.11

Err:509 Err:509
Rp 920,000.00 644,000,000.00
Rp 2,000,000.00 2,000,000.00
Err:509

HARGA
N PRASARANA PENDIDIKAN

KELAS BARU RKB LANTAI 2


a Pelabuhan
JUMLAH

Rp 119,290,358.11

Err:509

Jumlah Err:509

PPN 10% Err:509

Jumlah Err:509

Pembulatan Err:509

ang :

Makassar, Februari 2012


Konsultan Perencana,
CV. Corowali Cemerlang

Ir. Firman
Direktur

You might also like