LILAMA CORPORATION
Document No.: LLM/2013/P-LP1/HSE-00
SITE SAFETY, HEALTH AND
ENVIRONMENT PLAN Job ID.: LP1
(For Bidding purpose)
Sheet No.: 1 of 48
Project Site: Long Duc ward, Long Phu districst, Soc Trang Province, VIETNAM
Work Package:
Contract Number: ..
Revision Status
person injured; this will include coordinating the operation of the Client ambulance, providing
first aid treatment in the first instance on the site and Client medical center, and communicating
CONTRACTOR CLIENTs
Site Manager Project Manager
7. WORKPLACE ENVIRONMENT
7.1. GENERAL REQUIREMENTS
1) Ventilation shall be provided where possible, to remove dusts and poisonous gas in the
areas where such pollutants are produced.
2) The working environment shall be free from the causes of such symptoms as muscle
spasms, nausea and skin irritation.
3) The working area shall be maintained clean by Contractor and/or Sub-contractors'
labourers to prevent disease caused by dirty condition.
4) Maintaining good housekeeping for the clean work environment.
5) Protecting the workers from noise exceeding specified limit.
6) Ensuring all necessary warning and advisory signs are placed.
7.2. SANITATION
A. WATER
1) Drinking water for site workers will be available on site and will be sign posted
WATER FOR DRINKING in both Vietnamese and English
1) Switches shall be of the enclosed safety type, within enclosures grounded, and installed
so as to minimize the danger of accidental operation.
PROPOSED HSE PLAN FOR BIDDING Doc. No: LLM/2013/P-LP1/HSE-00
Rev. No: A
Page 23 of 48
2) Fuses and circuit breakers shall be of the proper rating for the circuit protected.
3) Switches, circuit breakers, fuse panels, and motor controllers in wet locations or outside
shall be in a weatherproof enclosure or cabinet.
4) Over current protection devices must be readily accessible, clearly labeled, not exposed
to physical damage and not placed in the vicinity of easily ignitable materials.
C. Temporary wiring
1) Temporary wiring shall be guarded, buried, or isolated by elevation to prevent
accidental contact by workers or equipment
2) Wires with non-rated weatherproof insulation shall not be enclosed in metal raceways
nor used for wiring in tanks, penstocks and tunnels.
3) Wires shall be insulated from their supports.
4) Exposed empty light sockets and broken bulbs shall not be permitted.
5) Nonmetallic sheathed cable may not be used where precluded by the NEC (National
Electric Code)
a. As portable extension cords.
b. Laying on the ground subject to any type of traffic or potential damages
c. Where subject to frequent flexing.
d. As service entrance cable
D. Overhead line
1) Overhead transmission and distribution lines shall be carried on towers and poles that
provide at clearances over roadways and structures.
2) Clearances shall be adequate for the movement of vehicles and for the operation of
construction equipment
3) Floating plant and associated equipment shall not be sited or placed within 6m of
construction equipment
4) Operations adjacent to overhead lines shall not be initiated until coordinated with the
utility officials.
5) SIGNS/ MARKERS.
All warning signs, danger signs, advisory signs, instruction signs, and the like to be
prominently displayed, of reasonable size to allow readability from 5m, have the primary
signage in Vietnamese, and secondary in English. All signs must be have Vietnamese.
Transformer enclosure to have No Unauthorized Access signs, Danger- HIGH
VOLTAGE signs. Transformer to have clearly displayed Danger- HIGH VOLTAGE
signs and Danger - Electricity
All DBs (CONTRACTOR and Sub-contractor) to have Danger - Electricity signs and
Danger- 400 Volts (or similar) on the doors.
All electrical section mains cable/ DB connection cable in building must be enclosed in
conduit, duct and any other approved means.
All buried cable must be identified and below surface with tape on the surface with
marker posts at a maximum Spacing of 30m and at all junctions and transition points. A
monthly inspection to be carried out by electrical section to ensure that any missing pegs
are replaced.
6. Electrical equipment inspection.
Prior to any electrical section equipment being used on the site, it will be inspected by
safety department, and Client safety department. Equipment will be checked for: general
PROPOSED HSE PLAN FOR BIDDING Doc. No: LLM/2013/P-LP1/HSE-00
Rev. No: A
Page 24 of 48
condition, cable and wiring, connections, casing, switches, grounding resistance,
suitability for work intended, markings and/or warnings, guards and covers, plugs, etc. If
equipment is satisfactory, it will be allowed into the construction site for use. Equipment
which fails in the inspection must be repaired or replaced before re-inspection.
10.2. TEMPORARY ELECTRICAL WIRING
Generator notes
Live parts of wiring or equipment must be guarded to protect all persons or objects from
accidental contact.
Electric wire and cable passing through work areas shall be protected from damage by foot
traffic, vehicles, sharp corners, projections, pinching and crossing/ acids
All electric cord must be doubly insulated. No single of an approved submersible type.
Switches, circuit breakers, fuse panels, motor controllers, and the like, in wet conditions or
outside shall be in weatherproof cabinets/boxes.
Temporary lighting shall be equipped with guards to prevent accidental contact with the
bulb, except when the bulb is deeply recessed within a reflector.
All connections /splicing/ cable junctions must be made via mechanical means.
Twisting wires together and tapping up it strictly prohibited.
All neutral bars must be inside electric box.
All electric box to have lockable cover, with approved electrical staff in control of the keys.
All generators will be connected from the generator earth to the structure being worked on or
to the main plant earth grid
Where small generators are being used with extensions leads being plugged in directly to the
generator these must be fitted with an appropriately sized 30mA RCD/ELCB protection
device.
All generators shall be fitted with an effective silencer.
All generators shall be free of fluid and oil leaks
CABLE AND WIRE DETAIL.
1. Mains:
All damage of cable must be cleared before buried.
Cable markers at max, spacing of 30m, plus junctions and transition points.
2. Temporary Cables/ Wire:
Must be well insulated from scaffolding / handrails/ structural steel
Must not be lying in water, unless approved marine cable and all connections/ sockets etc.,
approved submersible type.
No electric cable/ wire to be run across vehicle access way. This includes, motorbikes,
forklifts, cars, material trolleys, any kind of wheeled vehicles cannot drive over electric cable
or wire.
3. Road Crossings.
Buried minimum 0.5m for mains.
Buried 100-200mm for temporary lines in (steel or PVC pipe)
4. Minimum Cable and Wire requirements: