Chemical Unloading PDF
Chemical Unloading PDF
Chemical Unloading PDF
1
Work Task Hazards Controls
3. Unloading hose to plant chemical 3a. Injury to operator as a result of 3a. Follow Procedures/ Steps on the Bulk
receiving connection. improper or no use of PPE. Chemical Unloading Checklist.
-Disconnecting transfer hose from plant 3b. Personal Protective Equipment as indicated
receiving station and replace cap on hose in step #2.
connection.
Only trained Auxiliary Operators can perform Supervisor is to maintain proper documentation of training.
Training this task.
Material Safety Data Sheets for Sulfuric Acid & Sodium Hydroxide
Environment, Health, and Safety Manual; Chapter 4, Personal Protective Equipment
Referenced Material Center for Disease Control and Prevention, NIOSH Pocket Guide to Chemical Hazards;
For more information about this JSA and other JSAs, contact:
Department of Environment, Health and Safety
Contact Info UNC-CH, 1120 Estes Drive Extension, Chapel Hill NC 27599 CB# 1650
(919) 962-5507 http://ehs.unc.edu