Commissioning Standard Test
Formats
Description: TRIP CKT. SUPERVISION XR350 Record No. :
Bay no.: Drawing ref.: Sheet :1 of 3
Contractor : Contract no.: Substation No :
3. ELECTRICAL TESTS:
1 FUNCTION TEST:
3 TIMING TEST:
4 BURDEN:
Current
Coil Voltage (V) WATTS (W)
(mA)
CB OPEN Coil A
CB CLOSE Coil B