Ed 001
Ed 001
Ed 001
6 Refilling
Quantity Remarks
39.396
0.4725
0.568
0.135
4.658
3.78
0.00675
3.288
Detailed Estimate for 220KV Electrical Duct of size 4.28 x 3.
S.No Reference Description
Upto 3m
Above 3m
For Trapezoidal Portion
25.21 Cum
Detailed in
Earthwork
statement
Details In BBS
Statement
Abstract Estimate for 220KV Electrical Duct of size 4.28
S.No Reference
1 RBR-FNDN-1
2 RBR-FNDN-2-i
3 BLD-CSTN-2-2
4 BLD-CSTN-2-14
3.1
3.2
3.3
3.4
3.5
5 RBR-FNDN-8
AP SOR
6
Lead Charges
7 RBR-SPST-8
8 RBR-SPST-8
Estimate in Rs.
25.208 Cum
a= 8.43
1
Bar Bending Schedu
Inner Offsets
4.28 0.6
Trapzoidal width 1 0.49
0.5
Cutting Length
m
1 Raft Bottom main Bar(BS3) 8.86
2 Raft Bottom Distribution Bar(BS4) 1.00
3 Raft top Main Bars (BS1) 3.14
4 Raft top Main Bars (BS6) 1.85
5
6 Raft top Distribution Bars (BS2) 1.00
7 Grating main bar(EBS1) 1.00
8 Grating Distribution bar(BS2) 1.00
9 Hanch Bars(HS1 & HS2) 0.60
10 Wall verticla rods Outer side(SW1) 4.85
11 Wall vertical inner side(SW2) 5.25
12 Walls outside Distribution(SW4) 1.00
13 Walls inside Distribution(SW3) 1.00
14 Top Slab main bar(TS3) 5.88
15 Top Slab main bar(TS6) 3.00
16 Top Slab main bar(TS1) 8.58
17 Top Slab Distribution(TS4) 1.00
18 Top Slab Distribution(TS2) 1.00
Bar Bending Schedule
Trapizodal portion
outer /outer
width
0.35 5.48
1.8 BS3 Bar L
0.89 46.28
2.47 19.76
0.89 8.90
0.62 7.82
1.59 84.83
1.59 91.83
0.89 70.31
0.89 70.31
2.47 87.15
0.89 16.00
2.47 127.16
0.89 32.93
0.89 32.93
884.1
SEIGNORAGE CHARGE
Seignorage Charges For 220KV Electrical Duct of size 4.28 x 3.15 m @2.0M Cushion
S.No Items Factor Qty Rate Amount
1 PCC
Sand 0.45 0.596 50 13.41
Aggregate 0.9 0.596 75 40.23
2 RMC
Sand 0.4 12.32 50 246.35
Aggregate 0.8 12.32 75 739.04
Total 1065.84
AARVEE-GIIC AP-CRDA