Wellhead Safety GE Oil Gas Pressure Control
Wellhead Safety GE Oil Gas Pressure Control
Wellhead Safety GE Oil Gas Pressure Control
Non-wellhead Professionals
Presented by
Larry Benson, Regional Operations Manager
GE Oil & Gas
Pressure Control
11-0147-1
5/18/2011
Safety Moment
11-0147-2
5/18/2011
Agenda
The GE acquisition
Wellhead/Christmas tree safety
Customer-initiated
Gate valves
Actuators
Exposed wellhead housings
Hidden pressures
Branch information
Tyler
Shreveport
11-0147-3
5/18/2011
GE Acquisition
WGPC is part of GE Oil & Gas, Drilling &
Production
Surface wellhead elements will merge
11-0147-5
5/18/2011
Barricades
Site security
11-0147-7
5/18/2011
Body fittings
Potential leaks
Bonnet/body
Stem
Fittings
11-0147-8
5/18/2011
11-0147-9
5/18/2011
Pressure relief
valve
11-0147-10
5/18/2011
11-0147-11
5/18/2011
11-0147-12
5/18/2011
11-0147-13
5/18/2011
11-0147-15
5/18/2011
Separate
threaded cap
eliminated in
Type HP
One-way Type H
Two-way Type H
Two-way Type HP
11-0147-16
5/18/2011
Branch Information
3 acres
6,300 sq.ft.
37,700 sq.ft.
Capabilities:
Equipment preparation & inventory
management
Assembly & hydrostatic testing to 30,000
psi
Welding & painting
Rental equipment/Frac equipment
Crane truck service (24,700 lbs payload)
Service tools, BPV Lubricators, and other
service equipment
2 Super Service Trailers with 10K hydro
test pumps
2 Field Greasing Units
Personnel
Service 10
Total
29
H2S certified personnel
11-0147-18
5/18/2011
Updated 8/10/10
3 acres
2,750 sq.ft.
32,065 sq.ft.
Capabilities:
Equipment reparation & inventory
management
Assembly & hydrostatic testing to 30,000 PSI
Painting
Rental equipment/Frac equipment
Crane truck service (32,220lbs payload)
Service tools/BPV Lubricators
Personnel
Service 25
Total
51
Updated 8/10/10
11-0147-19