Project Report
Project Report
Project Report
TRAINING REPORT
OF
EIGHT WEEKS INDUSTRIAL TRAINING,
UNDERTAKEN AT
P
K ENTERPRISES
IN
MANUFACTURING
ON
QUALITY ASSORANCE
SUBMITTED IN PARTIAL FULFILLMENT OF THE DEGREE
OF
BACHELOR OF TECHNOLOGY
IN
DEPARTMENT OF MECHANICAL ENGINEERING
Submitted By: SACHIN GUPTA
Name: SACHIN GUPTA
Programme: B.TECH
University Roll No.:130020101069
ACKNOWLEDGEMENT
"We have taken efforts in this summer training. However, it would not have
been possible without the kind support and help of organizations. We would
like to extend our sincere thanks to all of them.
We are highly indebted to Mr. Nishant khera for his guidance and constant
supervision as well as for providing necessary information regarding the
training & also for their support in completing the training.
We would like to express our gratitude towards our parents & member of
organisations for their kind co-operation and encouragement which help me in
completion of this training.
We would like to express our special gratitude and thanks to organisation
people for giving us such attention and time.
Our thanks and appreciations also go to our mentor and people who have
willingly helped us out with their abilities."
Preface
Summer training is essential for the fulfilment of b.tech curriculam. It provides
an apportunity to the student to understand the industry with special emphasis
on the development of skill in analyzing interoperating practical problem
through application of company.
This report document the work done during the summer training internship at
P K Enterprises Faridabad under the guidance of Mr. Nishant khera
.the report first shall give the over view work done during the period of
internship. The technical details about the machine and its various interface and
conclusion draw out of it.
I have tried my best to keep the report simple yet technically correct. I hope I
succed in my attempt.
Table of content
1. Company Profile
2. Introduction of Assigned Job
2.1 Quality Assurance Requirement
2.2 Common Principal for Quality Assurance
2.3 Quality Assurance flowchart
3. Modular description of the Assigned Job
3.1 Gauges
3.2 R & D Machines
4. Detailed Analysis of individual module
4.1 Gauges
4.1.1 Plug Gauge
4.1.2 Snap Gauge
4.1.3 Thread Gauge
4.1.4 Micrometer
4.2 Machines
4.2.1 Design Endurance Test Machine
4.2.2 Design Product Validation Testing
4.2.3 Design Testing
5. Industry Application
6. Conclusion
7. Bibliography
8. References
Company Profile
Conclusion
The journey of Eight-week industrial internship ends here. In the span of eight weeks, I learned
a lot about the Quality Assurance in manufacturing department of M/s QH Talbros Ltd. The
outcome of this internship was fabulous. Getting an industrial touch at this time of the carrier
gave me a boost to look forward towards the industry. When the work started, we have lots of
the question to answer and complete the task but the main and foremost important thing was to
learn about the industry.
Every new day I faced the new opportunities regarding different new machines in R & D
Quality Assurance department
Every day we learn new things in quality assurance. The quality assurance team is one of the
main part of the industry. Every physical component that we can see was once checked by the
team.
Bibliography
1)
2)
3)
4)
5)
References
1) Research Information Network (forthcoming) Use and relevance of web
2.0 resources for researchers.
2) Research Information Network (2010) Peer review: a guide for
researchers
3) ASQ History of Quality. Assurance 17 November 2014
4) http://www.nctr.usf.edu
5) Thareja, Mannu; Thareja, Priyavrat (February 2007). "The Quality
Brilliance Through Brilliant People". Quality World 4 (2).