1-1 Checking The Installation Space
1-1 Checking The Installation Space
1-1 Checking The Installation Space
1-1
A. Installation space
The press dimensions are shown below.
There should be enough space between the wall and press to allow operation and maintenance.
Check the entrance of the room that the press will be installed in.
320mm
(12.6")
270mm
(10.6")
470mm
(18.5")
130mm (5.1")
130mm (5.1")
270mm 470mm
(10.6") (18.5")
100 - 150mm
(4" - 6")
Concrete
200 - 300mm
(8" - 12")
Gravel
(Note)
bolt. So please consult a contractor who has this specialized knowledge.
(Reference : Load capacity per 1m2 is over 1,200kg. / Load capacity per square feet is over 246 lbs.)
3. The ceiling height should be over 2,500mm (8' 2").
10
Allen wrench
14mm
Wrench
19mm, 24mm
Jack
Others
1-2
Carrying procedures
A. Lifting procedures
RYOBI 522GE
Lifting gauge set No. 5522 J 010
(Reference)
Mounting the lifting gauge
1)
2)
4)
5)
3)
11
RYOBI 524GE
Lifting gauge set No. 6524 J 010
Mount the 4 gauges on the press using the bolts and lift it using
the wires.
Gauge
B. Jacking up
RYOBI 522GE
(Notice)
illustration.
2. Be careful that the whole press is kept in balance.
12
RYOBI 524GE
(Reference)
Jack up bolt position and point weight (
RYOBI 522GE
[Unit : mm (inch)]
470 (18.5")
a1
b1
c1
a2
b2
c2
411.5
(16.2")
893
(35.2")
d1
d2
Point weight
a1
a2
b1
b2
c1
c2
d1
d2
Total
525
525
525
525
525
525
100
100
3,350
a1
a2
b1
b2
c1
c2
(Unit : kg)
d1
d2
Total
220
220
7,382
(Unit : lbs.)
RYOBI 524GE
[Unit : mm (inch)]
b1
a1
a2
374
(14.7")
b2
1,275.5
(50.2")
c1
d1
c2
d2
1,211
(47.7")
408.5
(16.1")
e1
e2
525
302
(20.7") (11.9")
Point weight
a1
a2
b1
b2
c1
c2
d1
d2
a1
a2
b1
b2
c1
c2
d1
d2
e1
e2
Total
100
100
6,830
e1
e2
Total
220
220
15,056
(Unit : kg)
(Unit : lbs.)
13
Feeder side
Bed
frame
Oil pan
C
B
14
Model
RYOBI 522GE
60mm (2.4")
60mm (2.4")
100mm (3.9")
RYOBI 524GE
50mm (2")
50mm (2")
40mm (1.6")
1-3
Press leveling
RYOBI 522GE
RYOBI 524GE
(1)
(1)
B. Adjustment procedures
RYOBI 522GE
(2) Operation side
(3) Non operation side
(1)
(A)
(B)
(C)
(D)
15
RYOBI 524GE
bolts (A), (B), and (C).
and (E). At this time, be careful not to change the level of
the press section.
(1)
(A)
(B)
(C)
(D)
(E)
(Note)
1. Any oil and foreign particles must be wiped off from the surface where the level is to be positioned.
16
1-4
Press wiring
RYOBI 522GE
RYOBI 524GE
Power supply
Power consumption
7.5kW (27,000kJ,
6,450kcal, 25,590BTU)
13.5kW (48,600kJ,
11,600kcal, 42,060BTU)
Over 5.5mm2
Over 14mm2
B. Wiring procedures
To power source
PE
PE
1)
2)
(Reference)
When using a transformer, connect the transformer so that
it is between the power source and press.
Wires to the power source : Primary side tap in the
transformer
Wires from the press :
Secondary side tap in the
transformer (200V)
(Note)
Check that the connection of the wires (primary side tap) to
the power source matches the voltage of the power source.
17