Annex V-Bill of Quantities (BoQ)
Annex V-Bill of Quantities (BoQ)
Annex V-Bill of Quantities (BoQ)
ANNEX V
1 of 18
UNOPS 72546
COST SUMMARY
PROJECT INFORMATION
Name:
City
Country
Project:
Italian Schools
Torit
Sudan
Construction of Ilubum Primary School in Torit County
PRICE SUMMARY
ITEMS
Ilubum primary school
Total Price
Currency
GRAND TOTAL
TOTAL SUM FOR WORKS IN NUMBERS
TOTAL SUM FOR WORKS IN WORDS
Note: ALL EQUIPMENT, FITTINGS, HARDWARE AND ACCESSORIES SHALL BE NEW / UNUSED /
OF THE HIGHEST MERCHANTABLE QUALITY AND SAMPLES MUST BE APPROVED BY THE UNOPS
ENGINEER PRIOR TO INSTALLATION.
WE CONFIRM BID VALIDITY PERIOD FROM DATE OF BID CLOSING: 90 (NINETY) Days
Company Name:
Name of Company
Representative:
Email of Company
Representative:
Telephone ( Landline):
Telephone (Mobile):
Signature of Company
Representative:
Date:
2 of 18
BILL OF QUANTITIES
BILL NO.
ITEM DESCRIPTION
QUANTITY
1/12
UNIT
1.0
Excavation
Clear the site, cut bushes and grub up roots to prepare for
construction
1.1
1.00
Item
471.00
m2
76.00
m3
Fillings
34.00
m3
81.00
m3
42.00
m3
341.00
m2
26.00
m3
251.00
m2
94.00
m2
7.00
m3
1.2
G
1.3
2.0
Disposal
Cart away any surplus excavated material to deposit as
directed by the engineer
Anti-termite treatment
Anti - termite treatment to stabalized compacted floor area,
fillings and tops of foundation walls: as " Aldrex" or equal
and approved insecticide treatment: applied in accordance
with the manufacturer's printed instructions : include for 10
years warrant
CONCRETE WORKS
Reinforcements shall be paid separately unless
otherwise specified in the item description
In Situ Concrete
Unless otherwise stated the rate shall include the
supply of all materials and labour to achieve the
specified quality of concrete including all mixing,
vibrating, transporting and placing
Concrete class 25/20(1:2:4) in:
Strip footings
PAGE NO.
UNIT
TOTAL PRICE
RATE
55.00
230x230mm lintols
To collection
BILL OF QUANTITIES
BILL NO.
ILUBUM PS
PAGE NO.
2/12
ITEM
REF.
2.2
2.2.1
ITEM DESCRIPTION
QUANTITY
UNIT
Formwork
25mm thick sawn cypress formwork to:
194.00
m2
138.00
2.3
Reinforcement
Rate to include for supplying, cleaning, cutting,
bending, fabricating, placing and the provision of all
necessary temporary fixings and supports etc.
including binding wires, bends, hooks, tying wires,
chairs, distance blocks, steel separators/spacers (d
UNIT
TOTAL PRICE
RATE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Tor steel reinforcement (to BS 4449 and
characteristic strength fy = 460N/mm2) and Mild steel
reinforcement ( to BS 4449 and characteristic
strength fy = 250N/mm2)
0.00
214.00
Kg
703.00
Kg
425.00
Kg
2.3.1
M
2.4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
341.00
m2
0.00
0.00
Concrete sundries
1.00
Item
0.00
1.00
Item
0.00
0.00
3.0
MASONRY WORKS
0.00
3.1
3.1.1
A
3.1.2
B
3.2
3.2.1
C
3.2.1
Note
0.00
Brick Work
Sub-structure Walls
230mm thick solid furnace brick walls: bedded and jointed in
cement and sand (1:4 ) mortar strip foundations
145.00
m2
0.00
Super-structure Walls
230mm thick walls in standard furnace bricks in cement
sand (1:5) mortar: reinforced with hoop iron wall ties laid
horizontally at every 200mm spacing
0.00
345.00
m2
0.00
0.00
0.00
0.00
0.00
137.00
0.00
0.00
341.00
m2
0.00
To Collection
0.00
BILL OF QUANTITIES
BILL NO.
4.0
QUANTITY
UNIT
0.00
Roof structures
All steel members shall be applied priming backs &
two coats of an approved gloss paint before fixing.
572.00
146.00
69.00
93.00
41.00
429.00
m2
41.00
144.00
40.00
4.2
4.2.1
G
Roof Covering
Supplying & fixing of gauge 28 pre-painted Super Five
profiled roofing sheets ( 0.32mm ) of approved colour:
fixed with J-bolts to 100 x 50 x 2mm zed purlins ( measured
separately) and rubber capping to tops of bolts
4.2.1.1 Ridges
H
4.3
4.4
K
RATE
0.00
3/12
TOTAL PRICE
UNIT
4.1
PAGE NO.
Supplying & fixing of 110 dia uPVC rain water down pipes:
fixed sloping to feed rainwater harvest uPVC tank
(2000Litres capacity)measured separately; including all
necessary accessories to complete the installation
2.00
No.
2.00
No.
To Collection
0.00
BILL OF QUANTITIES
BILL NO.
4.5
N
QUANTITY
UNIT
Extra Over
11.00
No.
6.00
No.
1.00
No.
5.0
5.1
PAGE NO.
Steel Doors
4/12
TOTAL PRICE
UNIT
RATE
To Collection
0.00
BILL OF QUANTITIES
BILL NO.
5.2
QUANTITY
UNIT
Windows
3.00
No.
4.00
No.
16.00
No.
12.00
No.
210.00
m2
456.00
m2
4.00
No.
341.00
m2
49.00
m2
49.00
m2
6.0
FINISHES
The contractor is advised to refer to the specification prior to
pricing of this section of work
The rate shall include for all temporary rules, screeds,
grounds etc. for raking out joints of new brick work or
hacking new concrete for key, internal & curved angles,
joints between different surfaces arisses quirks, inter
sections between curved or irr
6.1
A
B
6.2
C
6.3
D
6.4
E
7.0
7.1
F
PAGE NO.
5/12
TOTAL PRICE
UNIT
RATE
To Collection
666.00
m2
0.00
BILL OF QUANTITIES
BILL NO.
ITEM DESCRIPTION
QUANTITY
6/12
UNIT
1.0
Excavation
1.1
36.00
m2
7.00
m3
Fillings
3.00
m3
4.00
m3
4.00
m3
16.00
m2
3.00
m3
16.00
m2
1.00
m3
Disposal
2.0
Strip footings
PAGE NO.
UNIT
TOTAL PRICE
RATE
To Collection
BILL OF QUANTITIES
BILL NO.
ITEM DESCRIPTION
QUANTITY
UNIT
Formwork
25mm thick sawn cypress formwork to:
Sides of groundbeams
7.00
m2
16.00
Reinforcement
Tor steel reinforcement (to BS 4449 and
characteristic strength fy = 460N/mm2) and Mild steel
reinforcement ( to BS 4449 and characteristic
strength fy = 250N/mm2)
60.00
Kg
30.00
Kg
16.00
m2
3.1
3.1.1
A
3.1.2
B
Note
Brick Work
Sub-structure Walls
230mm thick solid furnace brick walls: bedded and jointed in
cement and sand (1:4 ) mortar strip foundations
7.00
m2
14.00
m2
16.00
16.00
m2
Super-structure Walls
230mm thick walls in standard furnace bricks in cement
sand (1:5) mortar: reinforced with hoop iron wall ties laid
horizontally at every 200mm spacing
Thermal and Moisture Protection
Damp proof course
D
4.0
PAGE NO.
7/12
TOTAL PRICE
UNIT
RATE
To Collection
BILL OF QUANTITIES
BILL NO.
4.1
ITEM DESCRIPTION
QUANTITY
UNIT
Roof structures
All steel members shall be applied priming backs &
two coats of an approved gloss paint before fixing.
39.00
21.00
13.00
3.00
9.00
34.00
m2
5.00
24.00
E
4.2
4.2.1
Roof Covering
Supplying & fixing of gauge 28 pre-painted Super Five
profiled roofing sheets ( 0.32mm ) of approved colour:
fixed with J-bolts to 100 x 50 x 2mm zed purlins ( measured
separately) and rubber capping to tops of bolts
Ridges
J
5.0
PAGE NO.
6.00
No.
8/12
TOTAL PRICE
UNIT
RATE
Sizes
The sizes given in the drawings and description of Bill of
Quantities are finished sizes and subject to same
permitted in the specifications.
The contractor shall check the measurement of openings
physically at the site before fabricating the doors & windows.
To Collection
0.00
BILL OF QUANTITIES
BILL NO.
ITEM DESCRIPTION
QUANTITY
UNIT
5.1
Steel Doors
1.00
No.
1.00
Item
6.0
FINISHES
The contractor is advised to refer to the specification prior to
pricing of this section of work
The rate shall include for all temporary rules, screeds,
grounds etc. for raking out joints of new brick work or
hacking new concrete for key, internal & curved angles,
joints between different surfaces arisses quirks, inter
sections between curved or irr
All samples of materials to be used shall be provided for
approval by the Engineer.
6.1
Wall Finishes
29.00
m2
6.00
m2
16.00
m2
8.00
m2
Floor finishes
D
7.0
PAGE NO.
9/12
TOTAL PRICE
UNIT
RATE
7.1
Wall Painting
Prepare and apply one priming coat and two coats of black
bitumastic paint to rendered plinths
8.00
m2
29.00
m2
To Collection
BILL OF QUANTITIES
BILL NO.
ITEM DESCRIPTION
QUANTITY
UNIT
1.0
78.00
m2
166.00
m3
2.0
CONCRETE WORK
Concrete class 15/20 (1:3:6)in:
16.00
m2
23.00
m3
3.00
m3
230x230mm Lintols
2.00
m3
2.2
Formwork
25mm thick sawn cypress formwork to:
20.00
m2
48.00
4.00
m2
2.3
Reinforcement
Tor steel reinforcement (to BS 4449 and
characteristic strength fy = 460N/mm2) and Mild steel
reinforcement ( to BS 4449 and characteristic
strength fy = 250N/mm2)
31.00
Kg
77.00
Kg
48.00
Kg
116.00
Kg
184.00
m2
16.00
m2
3.0
MASONARY WORK
3.1
Sub-structure Walls
0.00
PAGE NO.
10/12
TOTAL PRICE
UNIT
RATE
3.2
Super-structure Walls
131.00
m2
16.00
m2
To Collection
BILL OF QUANTITIES
BILL NO.
ITEM DESCRIPTION
4.0
ROOF WORK
4.1
Roof structures
QUANTITY
UNIT
17.00
25.00
36.00
33.00
m2
6.00
Nr
6.00
Nr
6.0
Windows
Supply and fixing of window(vents) units comprising
50x50x1.2mm RHS frames, steel louvres as infilling
panel; including painting all complete as detailed on
drawings, specification and to Engineer's approval as
type F.
FINISHES
6.1
Floor finishes
30.00
m2
4.2
D
Roof covering
Supply & fixing of gauge 28 Corrugated GI sheet
roofing with required accessories
5.0
5.1
Doors
5.2
A
6.2
114.00
m2
70.00
m2
184.00
m2
6.3
0.00
PAGE NO.
Plinth finishes
12.00
m2
Prepare and apply one priming coat and two coats of black
bitumastic paint to rendered plinths
12.00
m2
11/12
TOTAL PRICE
UNIT
RATE
6.4
G
3.00
Nr
To Collection
BILL OF QUANTITIES
ILUBUM PS
ITEM DESCRIPTION
(SUMMARY)
Total Amount
Total Bid Amount(In words) including the
Currency:
0.00
PAGE NO.
GENERAL
BILL NO.
QUANTITY
UNIT
SUMMARY
UNIT
RATE
12/12
TOTAL PRICE
Address:
Contact No:
Email:
Signature
Company Stamp