BIM Ex Plan
BIM Ex Plan
BIM Ex Plan
AND PROCEDURE
Sara Pace
Paul Kuehnel
Mike Lucas
Jon Brangan
Jon Brangan
jmb5346@psu.edu
Structural
Engineer
Paul Kuehnel
pkk5001@psu.edu
Mechanical
Engineer
Sara Pace
sap5103@psu.edu
Lighting &
Electrical
Designer
Mike Lucas
lwm124@psu.edu
BIM Manager
Build
Navisworks Models
Run Clash Detections
Alert Responsible Parties of Interferences
Coordinate Effective Design Alternatives
BIM Manager
Jon Brangan
Organization Roles
Paul Kuehnel
Organization Roles
Structural Project Manager
Model
Engineered Systems
Structural Members
Provide Structural Revit Model
Collaborate Effective Design Solutions
Organization Roles
Sara Pace
Engineered Systems
Ductwork
Mechanical Equipment
Provide Mechanical Revit Model
Collaborate Effective Design Solutions
Mike Lucas
Organization Roles
Engineered Systems
Panelboards, Switchboards & Switchgear
Lighting Components
Conduits
Provide Lighting & Electrical Revit Model
Collaborate Effective Design Solutions
NUMBER OF
TOTAL STAFF
FOR BIM USE
ESTIMATED
WORKER HOURS
LEAD CONTACT
3D Coordination
Building Stimulus
TBD
Mike Lucas
Design Authoring
Building Stimulus
TBD
Paul Kuehnel
Structural
Analysis
Building Stimulus
TBD
Paul Kuehnel
Lighting Analysis
Building Stimulus
TBD
Mike Lucas
Energy Analysis
Building Stimulus
TBD
Sara Pace
Mechanical
Analysis
Building Stimulus
TBD
Sara Pace
4D Modeling
Building Stimulus
TBD
Jon Brangan
Cost Estimation
Building Stimulus
TBD
Jon Brangan
BIM USE
Project Information
Project Information
PROJECT PHASE /
MILESTONE
PRELIMINARY PLANNING
September 1, 2010
All Disciplines
EXISTING CONDITIONS
CONFIRMATION AND
MODELING
October 4, 2010
All Disciplines
October 5, 2010
All Disciplines
All Disciplines
PROPOSAL
December 3, 2010
All Disciplines
IMPLEMENTATION OF
PROPOSAL
December 4, 2010
TBD
All Disciplines
Remainder to be
determined upon Spring
Semester
TBD
TBD
TBD
Project Information
GOAL DESCRIPTION
BIM Uses
Design Authoring
Site Utilization Planning
Existing Conditions
Modeling
LEED Evaluation
Energy Analysis
Structural Analysis
Cost Estimation
4D Modeling
3D Coordination
Daylight
integration/Lighting
analysis
Design Reviews
Collaboration Procedures
Meeting Procedures
MEETING TYPE
PROJECT STAGE
FREQUENCY
PARTICIPANTS
LOCATION
BIM REQUIREMENTS
KICK-OFF
Organizational
Once
Building Stimulus
Members
BIM EXECUTION
PLAN
DEMONSTRATION
Once
Building Stimulus
& Practitioners
107 EUB
DESIGN
COORDINATION
Design
Development
Daily
Building
Stimulus
Members
Interactive Workspace
333 Sacket:
Software
BIM USE
DISCIPLINE
(if applicable)
SOFTWARE
VERSION
DESIGN AUTHORING
Architect
Revit
Construction Manager
Revit
Construction Manager
Revit
LEED Evaluation
MS Excel
MS Excel 2010
Energy Analysis
Mechanical Engineer
Trace, Revit
Structural Analysis
Structural Engineer
4D Modeling
Construction Manager
Navisworks, Synchro
Cost Estimation
Construction Manager
All Disciplines
Revit, Navisworks
L/E Engineer
All Disciplines
Revit
Site Utilization
Planning
Existing Conditions
Modeling
3D Coordination
(Design)
Daylight Integration &
Lighting Analysis
Design Reviews
Computers/Hardware
Processor:
Operating System:
Memory:
Storage:
Graphics:
Monitors:
Quality Control
DEFINITION
RESPONSIBLE
PARTY
SOFTWARE
PROGRAM(S)
FREQUENCY
VISUAL CHECK
All Project
Managers
Revit
INTERFERENCE
CHECK
BIM
Manager
Navisworks
STANDARDS
CHECK
All Project
Managers
Revit
Continuously
All Project
Managers
Revit
Continuously
MODEL
INTEGRITY
CHECKS
Continuously
Weekly
Information Exchange
Information Exchange
Information Exchange
Process Map
Level 1: Building Stimulus Process Map
Design Development
Schematic Design
Perform Engineering
Analysis
Perform Engineering
Analysis
Engineer
Engineering
Analysis
Engineer
Design Development
Schematic Design
Perform Cost
Estimation
Perform Cost
Estimation
Contractor
Schematic Design
Process
Start
Process
Cost
Estimation
Design
Authoring
Design Development
Design Development
Perforn 3D
Coordination
All Disciplines
3D Marco
Coordination
Arch, SE, ME
Design
Authoring
All Disciplines
Cirtual
Prototyping
Architect
Info. Exchange
Program Model
Possible
Project
Delays
Possible
Project
Delays
Cirtual
Prototyping
Create 4D Model
4D Modeling
S.D. Cost
Estimation
Contractor
S.D.
4D Model
S.D. 3D Macro
Coordination
Model
S.D. Engineering
Analysis Model
S.D. Virtual
Prototypes
Struct.
Model
Arch
Model
Possible
Project
Delays
Possible
Project
Delays
Record Model
End
Process
Design Development
Create 4D Model
Struct.
Model
Contractor
Develop Virtual
Prototypes
Schematic Design
Arch
Model
3D Marco
Coordination
Design Development
Develop Virtual
Prototypes
Contractor
Operations
Perforn 3D
Coordination
Schematic Design
Architect
Cost
Estimation
Contractor
Schematic Design
Engineering
Analysis
4D Modeling
D.D.
4D Model
D.D. Virtual
Prototypes
D.D. Cost
Estimation
3D Micro
Coordination
Model
Record
Mdoel
Questions
&
Comments
Design Authoring
Level 2: Design Authoring
Create Design
Development
Architecture Model
Create Schematic
Design
Architecture Model
Architect
Architect
Process
Create Schematic
Design Structural
Model
Structural Engineer
Develop Initial
Architecture Model
Create Schematic
Design MEP Model
Architect
Start
Process
No
Does the
model Meet
requirements
?
Yes
Create Design
Development MEP
Model
Does the
model Meet
requirements
?
Create Other
Models As Needed
All Disciplines
All Disciplines
All Disciplines
Schematic Design
Yes
End
Process
MEP Engineer
Create Other
Models As Needed
Information Exchange
No
Structural Engineer
MEP Engineer
Initial
Architecture
Model
Create Design
Development
Structural Model
All Disciplines
Design
Development
Construction
Equipment
Libraries
Schedule
Process
Add Construction
Equipment
Identify
Construction
Phases
Contractor
Start
Process
No
Contractor
Contractor
No
Contractor
All Phases
Analyzed?
Determine
Temporary
Facilities
Analyze Site
Layout for Phase
transition
Analyze Site
Layout for Space
and Time Conflicts
Is Plan
Acceptable?
Yes
End
Process
Contractor
Insert Phased
Staging Area
Info Exchange
Contractor
Site Utilization
Plan
Design Models
Construction
Models
Info Exchange
Process
Collect Data
Through
Photographs
Collect Current Site
Conditions Data
Responsible Party
Responsible Party
Start
Process
Review Existing
Conditions Models
Compile Existing
Conditions
Information
Responsible Party
Responsible Party
Compile Existing
Conditions Models
End
Process
Responsible Party
Existing
Conditions
Information
Model
LEED Evaluation
Reference Info
Info Exchange
Process
No
Establish LEED
Point Targets
Compile
Information
Owner / Design
Team
Generate
Additional
Required
Information
MEP
MEP
Start
Process
Results
Acceptable?
Yes
End
Process
Energy Analysis
Model
Site Utilization
Plan
Lighting Design
Model
Structural Analysis
Soil Data
Process
Reference Info
Generate
Structural Layout
Structural Engineer
Start
Process
Info Exchange
Snow Loads
Analyze Model
Structural Engineer
Structural Engineer
No
Model
Acceptable?
Yes
Generate
Structural Design
Model
End
Process
Structural Engineer
Arch. Model
Structural Design
Model (Draft)
Structural Design
Model
Energy Analysis
4D Modeling
Process
Reference Info
Level 2: 4D Modeling
Productivity
Information
Lead Times
Set Construction
Sequencing and
Flow
Prepare/Adjust
Schedule
All Disciplines
All Disciplines
No
No
Start
Process
Establish Info.
Exchange
Requirements
Modify 3D Model
Link 3D Elements
to Activities
Validate Accuracy
of 4D Model
All Disciplines
All Disciplines
Contractor
All Disciplines
Model
Correct?
Yes
Schedule
Optimized?
Yes
All Disciplines
Info Exchange
End
Process
3D Model
Schedule (Draft)
4D Model (Draft)
Schedule 4D Model
Cost Estimation
Design Coordination
Reference Info
Contract
Requirements
Company
Standards
Information
Exchange
Requirements
Process
All Disciplines
Define Information
for Disciplines
Create Discipline
Models
Compile Composite
Model
Preform Collsion
Detection
All Disciplines
Contractor
Contractor
``
All Disciplines
Start
Process
End
Process
No
Define Areas of
Coordination
Develop Schedule
for Coordination
All Disciplines
All Disciplines
Yes
Identify Solutions
to Collisions
All Disciplines
Any Collisions?
Start Design
Coordination
Process
Establish a
Protocol to
Address Collisions
Info Exchange
All Disciplines
Arch Model
Structural
Model
MEP Model
Coordination
Model by
Discipline
Existing
Conditions
Information
Model