Testing is carried out primarily for unearthing any defects present in the system and to
prevent a defective product reaching the customers. Secondarily, testing is also carried
out to convince the customer that the product conforms to and fulfills the specifications
and the functionality agreed to.
This paper intends to throw light on the complete testing activity and suggest a few
solutions to estimation of testing effort.
White Box testing involves stepping thru every line of code, and every branch in the
code. In Black Box testing, a set of inputs is given and the outputs are compared with the
expected outputs.
1. Product Stage based Testing, namely, Unit, Integration and Systems Testing
2. Purpose based testing, namely, Functional, Positive and Negative Testing
3. Reliability Testing, namely, Load, parallel, Concurrent, Stress Testing
It is also common that every testing produces some defects and it needs to be followed by
Regression Testing to ensure that the defects that were unearthed were indeed rectified
and the process of rectification of defects did not produce further defects.
Unit testing is carried out for every Unit of the software, a form, report etc. Unit testing is
normally white box testing.
Integration testing is carried out – normally using the black box testing – for a stand-
alone module of the software product being developed.
System testing is carried out for the software product on the target systems.
Functional testing is carried out to ensure that all functions intended for the software are
available and are working satisfactorily with out any inaccuracies.
Positive testing is carried to prove that the software works as claimed – normally used in
Acceptance testing before delivery to the clients.
Negative testing is carried out to unearth any possibility of the software failing due to un-
intended usage of the software – very important in software products intended for
consumer market.
Load testing is carried out, especially in web-based applications, to ensure that the
software works well when the expected numbers of users use the software using different
modules of the software. This unearths the issues connected with the bandwidth,
database, sufficiency of RAM, hard disk etc.
Parallel testing is carried out to unearth issues if any, when a number of users same
functionality in simultaneously.
Concurrent testing is carried out to unearth issues when two or more users use the same
functionality and update or modify same data with different values at the same time.
Stress testing is carried out by causing stress – by making unavailable some of the system
resources - to the system to unearth issues connected with unexpected events in the
operation of the system.
It is rare that White box testing is resorted to in testing other than unit testing. It is not
uncommon to use Black Box testing even in Unit testing too.
It is also rare that all the above types of testing are carried out for every project that is
executed in the organization.
1. Functional Testing to ensure that all the functionalities allocated to the software
are working and there are no inaccuracies, when used properly
2. Integration testing – to ensure that the coupling between various software
modules is in order
3. Positive testing to get the software accepted by the client
4. Load testing to ensure that the system does not crash when heavy loads are placed
on it
Organizations carry out the remaining types of testing, on a “if available” – time and
budget – basis or “if mandated” basis.
1. Test Cases based testing – there is a set of test cases and testing is carried out only
against the test cases
2. Intuitive testing – there may be a general description of the functionality and
suggestions/guidelines as to how to go about unearthing defects. Testing is carried
out using the experience and intuition of the tester. Some amount of creativity or
common sense is expected from the tester.
For any software project there would always be a high-level test plan. For every intended
testing, there ought to be set of test cases against which testing is carried out. But
consider the implications –
1. For every numeric (including date type data) data input, we need to have five test
cases – using the Partitioning and Boundary Value Analysis techniques –
a. One value in the acceptable range
b. One value above acceptable range
c. One value below acceptable range
d. One value at the upper boundary of the acceptable range
e. One value at the lower boundary of the acceptable range
2. Size checks for all non-numeric data, one per every data item
3. Logical testing for presence of invalid data – like numerics and special characters
in name data fields etc.
Thus, the test case set for even a moderately complex unit will be voluminous. Modern
projects are large in size and the effort required to prepare exhaustive test case set would
be significantly high. Therefore, it is common (not always, perhaps) to prepare test cases
where it is expected that the tester cannot intuitively figure out the test cases all by
him/her self.
32-78/3 Sainik Nagar Rama Krishna Puram, Secunderabad - 500056
+001-347-394-3138 & +91-40-2722 0771 - www.chemuturi.com - murali@chemuturi.com
Dt. 28th April 2006
Chemuturi Consultants – Do it well or not at all
It is not uncommon that unit testing is carried out without any test cases. Integration
testing, system testing and acceptance testing are normally carried out against test cases.
When we attempt to specify a Unit of Measure, there must be a clear definition of what is
included in it. Secondly, there must be a means to measure the size. Then there must be
some uniformity – need not be identical – in the practices of testing, namely, preparation
of test plans, the comprehensiveness of test cases, the types of testing carried out and
availability of empirical data to normalize various situations to a common measure. The
following aspects need consideration –
The literature I have seen so far does not suggest that all these aspects are well considered
and covered in defining the size measure for testing effort.
One question – Is size measure necessary to estimate testing effort? No – testing effort
can be estimated using Task Based Estimation.
But size measure is important so that comparison can be made between tow projects; it is
important to assess the reasonableness of the effort estimates.
There are four categories of people who would like to carry out test estimation –
1. The project Team who obviously have to carry out testing to ensure that their
work is satisfactory and they can certify it so and pass it on to professional
32-78/3 Sainik Nagar Rama Krishna Puram, Secunderabad - 500056
+001-347-394-3138 & +91-40-2722 0771 - www.chemuturi.com - murali@chemuturi.com
Dt. 28th April 2006
Chemuturi Consultants – Do it well or not at all
independent testing team. This set would carry out all the tests described in
section II
2. The in-house Software Quality Assurance (SQA) Team that would test and certify
the product for customers. This team also would carry out all the tests described in
section II. Their objective is to unearth all defects and make the product as defect
proof as possible while ensuring that the product meets all the specified
functionality.
3. Testing Organizations, whose mainline of business is to test other’s software and
certify the products. Their objective is to ensure that the product meets the end
user expectations. This set would carry out –
a. Mainly Black Box testing
b. Functional Testing
c. System Testing
d. Negative Testing
e. Regression Testing
4. Customers who entrusted their software development to a vendor. Their objective
is to ensure that they are getting what they are paying for. This set would carry out
a. Acceptance Testing / Positive Testing
b. Regression Testing
The type of test estimation carried out by these sets would be different.
1. Project Team – since they carry out testing as part of development work – it may
be taken as a percentage of overall development work. Their purpose would be
mainly to estimate resource requirement and meeting the delivery schedule
2. In-house SQA Team – they need to estimate mainly for the purpose of resource
estimation and meet the delivery schedule
3. Testing Organizations – they need to estimate so that they can offer a fixed price
to the customers and manage a healthy profit for their organizations besides
resource estimation and meeting delivery schedule. For them “Size” of testing
project would have significant appeal.
4. Customers – They really are supported in this activity of acceptance testing by the
vendor organization.
Therefore, the tool for testing estimation, needs to address two different needs –
The term “Test Points” is catchy and perhaps the Unit of Measure for the estimation of
Testing size and effort. This can be used for sizing testing projects. Test Points can be
extracted from the software size estimates.
32-78/3 Sainik Nagar Rama Krishna Puram, Secunderabad - 500056
+001-347-394-3138 & +91-40-2722 0771 - www.chemuturi.com - murali@chemuturi.com
Dt. 28th April 2006
Chemuturi Consultants – Do it well or not at all
Task Based Effort Estimation technique can be used for estimation of effort for testing
projects.
The size of software has a direct bearing on the testing effort. The exception to this,
perhaps, is processing intensive scientific applications. For example, testing a Login
screen would take less effort than registration screen.
We can also conclude that the testing effort is also dependent on the number of testing
types included in the testing project.
Test Point as a size measure for measuring the size of a software-testing project and that
a Test Point is equivalent to a normalized test case.
It is common knowledge that test cases differ widely in terms of complexity and the
activities necessary to execute it. Therefore, the test cases need to be normalized - just the
way Function Points are normalized to one common measure using weighting factors.
Now there are no uniformly agreed measures of normalizing the test cases to a common
size. Also, what is the relation between other software size measures like Function Points,
or Use Case Points etc? Would it be fair to say one Adjusted Function Point would result
in one normalized Test Point? - again no agreement. Perhaps, we may say that one
Adjusted Function Point results in one (or 1.2 or 1.3 etc.) Test Points depending on the
software application at hand. Similarly, we may derive a similar relation in case of other
software size measures too.
There are many types of testing carried on software. Is there a standard saying that these
are the tests that should be included in a Testing Projects? I am afraid - that there is no
agreement here either. Generally - not necessarily - a Testing Project would include
Integration Testing, System Testing and Acceptance Testing - all using the black box
testing technique.
The variety in applications - on which testing depends - is significantly large. The method
for normalization between various application types is not commonly agreed to.
The types of testing carried out varies from project to project. There is no uniformly
agreed to the types of testing to be carried out on any given project.
There is barely enough research and empirical data that strict guidelines can be drawn as
the profession of testing itself is very nascent.
Weights
1. Application weight
2. Programming language Weight
3. Weights for each of the types of testing, namely,
a. Unit Testing
b. Integration Testing
c. System Testing
d. Acceptance Testing (Positive Testing)
e. Load Testing
f. Parallel Testing
g. Stress Testing
h. End to End Testing
i. Functional Testing
j. Negative Testing
All weights are project specific, and are applied only when selected.
Test Point has a weight 1, when the combined weights of the three tests, namely,
Integration, System, and Acceptance tests - is equal to one. When other tests are added to
the project, their weights may be assigned.
We have to compile weights-data for all these tests, and validate them in-house by
comparing the estimates with actual data and conducting a causal analysis of the
variance.
Tools usage is expected to reduce the total time of testing. Perhaps true - but it really
depends on the tool itself. Hence, the weight for the tools usage may be set appropriately.
A weight of 1 indicates that tools usage is indifferent to the testing size - more than 1, the
tool increases the size and hence the effort - less than 1, the tool reduces the size and
hence the effort.
We need to add another weight for the development language in projects that envisage
independent Unit Testing, that is, a person, other than the person who developed the
program, carries out Unit Testing. The weight for the language comes into effect only
when Unit Testing is selected - the reasons being –