1 (1) - Pump
1 (1) - Pump
1 (1) - Pump
Equipment :
System :
Description
Specification
Remarks
2. Pump
No.
Acceptance Recording
Criteria
/Check
Check Point
Witness
Remarks
1. Motor
Name Plate Rating
Voltage
Frequency
Visual
10%
0.04
Connection with the motor with main terminal box drawing.
Visual
All Gaskets
Visual
All bolts and nuts
Visual
Check oil level for oil lubricated
Visual
Foreign materials and general cleanliness in motor
Visual
Switch on of the space heater when motor is stop
Visual
Megohmmeter (applying 1000 V)
100 M-ohm
The rotor turns freely
Visual
Rotation ( Viewed from load side)
C.W
2. Pump
Alignment between
pump and motor
Parallel
Angular
Complete Installation
Other accessories installation
Foundation bolts
Check Line-Up to Suction
All bolts and nuts
Suction Valve
Discharge Valve
Prime
Flushing, Sealing is available
Check Level for Lube Oil
Certified by
Test Executor
Name
0.1mm '(T.I.R)
0.05mm
Visual
Visual
Visual
Visual
Visual
Open
Visual
Visual
Visual
Visual
Signature
Date
DOOSAN
KEPCO SPC
Equipment
System
Manufacturer
Output (KW)
Temperature (deg.C)
Voltage (V)
Humidity (%)
Description
Rotation Direction
(Viewed from load side)
Noise Level(dB A)
Vibration
(mm/sec. RMS)
No.
Criteria
Serial No.
Recording
Remarks
Vertical (DE/NDE)
Horizontal (DE/NDE)
Axial (DE/NDE)
Item
Time(min)
30
60
90
120
150
180
210
240
Remarks
"R" Phase
Current (A)
(No load)
"S" phase
"T" Phase
Motor
Temp' (deg.C)
DE Side
NDE Side
Remarks:
<Measure Point>
Certified by
Test Executor
DOOSAN
Name
Signature
Date
KEPCO SPC
Equipment :
System :
Check Time
Check Item
Pressure
(Bar G)
Vibration
(mm/sec. RMS)
Temp. ()
Motor
Pump
Motor
Pump
Current (A)
at Full Load
5
6
7
Ambient Temp. ()
Noise Level (dB(A))
Revolution (rpm)
0 min.
Suction
Discharge
TDH (Bar)
NDE
DE
NDE
DE
"V" (NDE/DE)
"H" (NDE/DE)
"A" (NDE/DE)
"V" (DE/NDE)
"H" (DE/NDE)
"A" (DE/NDE)
"R" Phase
"S" Phase
"T" Phase
30 min.
60 min.
= Dis.- Suc.
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
at 1 m distance
"U" Phase
"U" Phase Spare
"V" Phase
Motor
Winding Temp () "V" Phase Spare
"W" Phase
"W" Phase Spare
Flow Rate (t/hr)
Remarks :
Start Time ;
<Measure Point>
Certified by
Test Executor
Name
Signature
Date
DOOSAN
KEPCO SPC