IS:4064 Air-break switches, Air-break dis-connector, Air-break switch dis-connector and fuse
combination for voltages not exceeding 1000V AC. or 1200 V DC.
IS:4237 General requirements of switch gears and control gears for voltages not exceeding
1000V AC.
IS:8623 Factory-built assemblies of switch gears and control gears for voltages not exceeding
1000V AC. Or 1200 V DC.
It shall also comply with Indian Electricity Rules. In case of any conflict between
requirements of the above, the more stringent requirement shall govern. In case of
conflict between standards and specific requirement of the data sheet, the latter shall
govern.
4.1
Type of crane
4.2
Tag No:
4.3
Quantity Required
: 1 No.
4.4
Installation Location
4.5
Rated Capacity
: 10 Ton 1 No.
4.6
Design Capacity
4.7
4.8
Area Classified
: Non-hazardous Safe
1. TECHNICAL REQUIREMENTS
1. The EOT crane shall include hoisting machine, long traverse / cross traverse,
safety devices, electric controls, etc. to make the unit complete in all respects.
A) Platform Two full-length plat forms along the span of EOT crane & DSL
maintenance cage for servicing LT machineries and LT wheels.
Platform shall have MS chequered plates of 5mm thick hand rails and toe guard.
Sufficient walking space 1.5 metres in front of panel and 1 metre in
front of LT gear box shall be provided for maintenance of shaft on long
travel gear box side and in front of control panels.
On the other side clear width of 750 mm be maintained and festoon /
trailing trolleys for CT/Hoist supply cables to be provided inside the
platform The DSL maintenance cage shall have access ladder hand rail,
toe guard & chequered MS plates of 5mm thick with 1 rubber mat
over the plate and comfortable space for at least two persons to work.
Both end walkway along the end carriage bridging the girders with
handrail.
The handrails 1 dia MS/GI pipe shall be provided on both sides of
crane on the platform and on end carriage to entire span and width of
crane. The distance between handrails shall not be more than 300mm.
The support for platform and handrails shall be made out of robust
Angle iron at an interval of not more than 900mm.
The wheelbase in the end carriage shall be preferably be not less than
1/5th of the span. The wheels shall be placed in the centre line of the
end carriage so that the crane will run true and not cross bind and also
should have minimum 15mm clearance all around
2. Two full length cat-walk platforms (600mmX9000mm) (0.6mX90m) size with MS
Limit Switches I. Hoist: a) Rotary geared limit switch for over hoisting and over lowering
limitations and also.
b) Counter weight gravity type limit switch.
II Long travel / Cross travel: Two way Roller lever type limit switch
on each.
III Antidrag limit switches : 2 Nos. for each crane.
Make : Strom craft / Speed-N-System / equivalent
Hook block Single shank C type hook supported on thrust bearing for 360 degree
free swivelling sheaves with suitable bearings, wire rope guard against
slipping. The hook block shall be subjected to 100% over load test and
certificate for the same shall be furnished (closed type hook block).
Hook block shall be provided with safety latch. [Totally enclosed
round type Hook block]
Bridge &
End carriage Box type shall be made of suitable thickness plates, angles, channels
etc., with necessary diapragms and stiffners. The vibrations generated
by lifting / unloading etc., shall be damped within 15 seconds
(specified limits) as per latest IS and the deflection with 125% SWL
shall be within specified limits (span / 900) mm as per latest IS and the
same shall be taken care in design. All the welded joints shall be
subjected to non destructive die penetration / radio graphic test for
tension zone and conducting of such test shall be made clear in QAP.
Wheels All wheels have to be sorbitized to a hardness of 300 to 350 BHN to a depth
of 10 to 15mm. The clear drawing of bearing housing and bearing
description to be made clear in GA drawing. The wheels shall be
320mm dia with 22218E bearings.
Crab The crab frames shall be constructed from rolled steel and also there shall not be
any gap for free fall of components and dripping of the oil. Also, there
should be sufficient spacing available in ease of maintenance with
antiskid chequered plate of 5mm thick and crab should be surrounded
by hand rails for protection of personnel during maintenance.
Hoist RopeDrum Hoist Rope Drum shall be made out of Mild Steel Barrel fixed on single shaft
run throughout the drum with left hand and right hand grooves. It shall
be fitted with flexible steel wire rope with hemp core rope. The rope
shall be firmly anchored on the barrel. The rope drum shall be
provided with flanges on both ends to prevent slippage of wire rope. A
rope guide shall be provided to avoid over lapping of wire rope on the
drum, compensating pulleys may also be provided to ensure that the
ropes do not foul the grooves while winding or unwinding. The
transmission between the gear box and the hoist drum shall be made by
means of flexible geared coupling to take care of axial and angular mis
alignment. The grooves shall be sufficient size to grip the wire rope
properly. The factor of safety for hoist wire rope shall not be less than
8.0 or as per latest IS.
5.2 Rails : 45 kg/metre for bay length of 100 metres.
5.3 Control panel shall have weatherproof enclosure.
5.4 The EOT Crane shall be provided with Gong bell for alerting during movement from
pendent/remote control.
5.5 Painting
All exposed un-machined / carbon steel parts shall receive,
1. A commercial blast surface preparation.
2. Two primer coats of Zinc Chromate (25microns/coat).
3. Two coats of enamel finish paint (25microns/coat) of golden yellow.
5.6 Radiographic tests shall be carried out by the vendor for all Butt weld joints under
tension.
5.7 Anti Fall arrangement
5.8 Anti Derail arrangements
5.9 limit switches for all motions
6.0 VENDORS SCOPE OF SUPPLY
The following major items shall be supplied (but not limited to) along with necessary
accessories.
6.1 E.O.T. Crane
2. Drive machine with motor for the lift, long & cross traverse.
6.3 Safety gears
6.4 Terminal and final limit switches.
5. One set of complete maintenance tools
7. Erection & Commissioning of cranes
8. Electric power provided with only one point of supply per crane at floor level,
7. ELECTRICAL
Lighting
System Crane shall be provided with power supply for lighting from a suitable
transformer of appropriate capacity 415V/230V. Bridge girder lights
400 watts Metal halide / HPMV lamps 3 numbers, fittings mounted on
antivibration mountings and hooked to chain to prevent falling and
supply for this lighting transformer to be tapped from main control
switch which inturn get power supply through a main switch and main
DSL system & shall be controlled from pendent push button station.
Electrics The Electrics such as motors, contactors, protective relays, timers etc., shall
be of BEML approved brands.
a. Motors SIEMENS, GEC / ALSTOM, NGEF, AEI
b. Contactors SIEMENS ONLY
c. Relays SIEMENS, L&T, BCH.
d. Timers SIEMENS / BCH ONLY
7.1.1 The panel shall be of front wired with readily accessible terminal blocks for making
connection to external equipment.
2. The trailing cable shall be with PVC/XLPE multistrand Copper cable
8.1 Vendor shall carry out complete erection & commissioning of the equipment being
supplied by the firm.
8.2 Vendor shall carry out the complete erection according to the agreed Programme. All the
materials shall be moved from their place of storing into the plant by vendor, BEML
will provide clear storage and erection space only.
8.3 Vendor shall provide all the necessary skilled / unskilled workmen and shall also depute
experienced erection / commissioning engineer for supervision of the work. Welders
employed by vendor shall be Class I welders and shall be acceptable to BEML /
consultant.
8.4 Vendor shall provide all necessary equipment to execute and complete the work. These
shall also include welding sets as well as equipment like megger, tong tester, ammeter,
bell battery set etc. required for testing of electrical equipment / installation, welding
sets and other equipment so brought with proper gate entries at BEML IP gate will be
allowed to be taken back after satisfactory commissioning of EOT cranes.
5. All erection tools and tackles as and when required to suit the erection
programme shall be provided by Vendor.
8.0 (A) CONSULTANT
Vendor (Manufacturer) is totally responsible for design, manufacture, stage wise
inspection & supply of EOT crane to the required span and commissioning at site.
However, BEML reserves right to appoint a third party for inspection and cross
verification in case it is required. The vendor has to provide all facility for inspection
by the consultant / third party inspector.
Vendor shall submit GA Drawings & Designs, calculations of Bridge Girder, End
carriage, Gear boxes, Motors & Crab wheel and Wheel bearing hook block, Wire rope
drum and wire rope duly approved by BEML approved consultant. Vendor shall take
up production of the above items after getting clearance from BEML.
9.0 INSPECTION AND TESTING
9.1 Access to the manufacturing shop of vendor at all reasonable times shall be available to
the BEML / Consultant.
2. Performance Testing as per IS:4666-1980 / 3177 / 807
10.0 GUARANTEE
Unless otherwise specified in General Purchase conditions regarding guarantee, the
following shall govern:
10.1 Vendor shall guarantee that all materials used in the equipment are new and have been
subjected to regular acceptance procedure and are free from any defect regarding
quality, form and appearance.
10.2 The equipment and all the apparatus shall be guaranteed for design, raw materials and
workmanship for a period of 12 months from the date of commissioning or 18 months
from the date of receipt at site, whichever is earlier. BEML / Consultant approval of
Vendor, design will not relieve them of their responsibility from the satisfactory
performance of such item.
3. All the equipment / items shall be capable of performing the duties specified
11.1 After the components are tested, all exposed machined surfaces shall be suitably
protected / coated by approved type of easily removable protective compound.
2. Vendor shall ensure that the unmachined external CS surfaces are coated as
of
Drawing / Documents
For
Approval
Prior
to
despatch
1.
2.
Design calculations
3.
4.
5.
7.
--
8.
--
9.
--
10.
Installation drawings.
Vendor shall furnish the final record documents as listed above along with or
immediately after the supply/despatch of the equipment. The reports and other
documents shall be grouped for each equipment and all the documents shall be
provided in a folder.
13.0 DEVIATIONS
The deviations shall be as discussed / agreed during Technical discussion.
14.0 BEMLS SCOPE OF WORK
2. Electrical power at 415 volts, 3 phase, 50 Hz, AC at a convenient location.
2. This crane is required to be installed at location indicated in this specification.
The dimensions such as head room clearance, side clearance, exact span, bay
length etc., has to be ascertained before taking up the crane design and
manufacture. However, all dimension given in this Technical Specification are
approximate and for reference only.
13.
14.
15.
16.
17.
18.
The firm shall depute qualified & skilled Engineers to attend the problems.
The firm shall arrange all necessary tools needed for commissioning / servicing.
The firm shall be ready to work on Sundays & general holidays if need arises.
The firm shall take necessary pass for their employees to enter the factory
premises (work spot).
The firm shall declare all their items that are returnable at our security and obtain
necessary pass.
The firm shall arrange ESI & PF coverage to their employees / labourers if any
from their end and issue Photo identity cards with ESI/PF numbers.
The firm shall indicate ESI numbers of all the labourers hired or employees in
advance in order to prepare work permit inside the factory.
BEML will not have any kind of binding towards compensation in case of injury /
death to the firms employees while working in BEML premises or otherwise.
The firm shall make its own arrangement for boarding & lodging. However, during
working hours within factory, they can avail our canteen facility at cost.
BEML will not have any binding on damages or loss to the tools, meters etc.,
brought by the firm for commissioning purpose.
The firm shall arrange general insurance to their equipment and tools wherever
necessary.
The firm shall take safety permits for our Safety department wherever found
necessary and especially while working at heights, with chemicals, explosives and
high voltage areas.
The firm shall arrange to bring their own safety gadgets.
The firms personnel shall not carry any objectionable material like explosives, cell
phones, battery-operated instruments, weapons etc., knowingly or unknowingly.
The employee of the firm shall follow general rules, regulations & disciplinary
instructions of the company.
Factory working hours 7.00am to 3.00pm (1 st shift) & 3.00pm to 11.00pm
(2nd shift).
Legal jurisdiction Bangalore.
Delivery of EOT crane should be at the earliest in case of Purhase Order.
DATA SHEET
ANNEXURE - I
1.
Tag No.
S-1-EOT-10T 01.
2.
Type of crane
3.
Make
4.
Rated Capacity
10 T 1 No.
5.
Lift (Meter) :
10 Metres.
Span (Meter) :
Rail
Elevation
ground (Meter) :
7(a)
Traverse length
above
100 Metres
10.
C.T.Speed (MPM) :
11
L.T.Speed (MPM) :
6mtrs/min 10 T
:
20mtrs/min 10 T
30mtrs/min for 10 T
12
Frequency of use :
M7 duty for 10 T
13
Type of Control :
Hook block
No of falls
4 falls
Limit Switches
14
15.
16.
Electric Controller
16.3.1
Motor
O/L : Shall be provided
Protection / Single phasing /
Phase Reversal / Short cut
16.3.2 Motor Phase Failure
Protection
: 110 Volts AC
:
17.
17.1 Type
Insulation : Class F
17.5 Weight, Kg
:
:
18
Drive Motor
traverse
for
cross :
18.1 Type: TEFC / Slip ring induction motor as per IS 325, Make:Alstom
18.2 Rated KW / Speed, :
RPM
18.3 Winding
Class
19
Insulation : Class F
18.5 Weight, Kg
19.1 Type
20
19.5 Weight, Kg
20.2 Type
of
arrangement
21
GEAR BOX
traverse
for
Cross
21.2 Type
of
arrangement
for
Long
23.
24
25.
Weights
26
Lubrication system
27
28
29
30
Buzzer/alarm arrangement.
To be provided
Wheel base
LT
CT
To be specified in GA dwg
Wheel load
LT
CT
31
NOTE : The firm has to visit BEML before quoting and before taking up manufacturing works.
For taking up details like span, height of lift, rail clearance etc.
EOTSP10TSIST
13.
14.
15.
16.
17.
The firm shall depute qualified & skilled Engineers to attend the problems.
The firm shall arrange all necessary tools needed for commissioning / servicing.
The firm shall be ready to work on Sundays & general holidays if need arises.
The firm shall take necessary pass for their employees to enter the factory
premises (work spot).
The firm shall declare all their items that are returnable at our security and obtain
necessary pass.
The firm shall arrange ESI & PF coverage to their employees / labourers if any
from their end and issue Photo identity cards with ESI/PF numbers.
The firm shall indicate ESI numbers of all the labourers hired or employees in
advance in order to prepare work permit inside the factory.
BEML will not have any kind of binding towards compensation in case of injury /
death to the firms employees while working in BEML premises or otherwise.
The firm shall make its own arrangement for boarding & lodging. However, during
working hours within factory, they can avail our canteen facility at cost.
BEML will not have any binding on damages or loss to the tools, meters etc.,
brought by the firm for commissioning purpose.
The firm shall arrange general insurance to their equipment and tools wherever
necessary.
The firm shall take safety permits for our Safety department wherever found
necessary and especially while working at heights, with chemicals, explosives and
high voltage areas.
The firm shall arrange to bring their own safety gadgets.
The firms personnel shall not carry any objectionable material like explosives, cell
phones, battery-operated instruments, weapons etc., knowingly or unknowingly.
The employee of the firm shall follow general rules, regulations & disciplinary
instructions of the company.
Factory working hours 7.00am to 3.00pm (1 st shift) & 3.00pm to 11.00pm
(2nd shift).
Legal jurisdiction Bangalore.
~~~~~