Nothing Special   »   [go: up one dir, main page]

Subsea Innovation Sealing Solutions

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Subsea Sealing

Solutions and
Riser Hang-off
Equipment

Subsea Sealing
Solutions and Riser
Hang-off Equipment
With over 25 years industry experience,
Subsea Innovation designs and manufactures an
extensive range of standard and bespoke subsea
sealing solutions to suit clients specific project
requirements.
All design work is performed in-house by our team
of engineers using Autodesk Inventor.
Subsea Innovation manufactures elastomeric seals to
exacting standards of quality and precision. Sealing
solutions can be provided for applications with
operating temperatures between -40C to +180C
using elastomeric seals. Higher temperatures can be
accommodated using graphite seals.
Subsea Innovation seals are also designed and tested
to operate in pressures between 0 and 500 bar.g.
Seal activation methods can vary from an active
design which incorporates a self sealing principle
(which requires no external activation force) to
mechanical or hydraulic methods.
Subsea Innovation supplies an extensive range of
sealing options which can be fitted with ROV torque
tool receptacles or alternatively ROV hot stabs and
receptacles for hydraulic activation.
Examples of typical sealing solutions are ROV activated j-tube seals
Passive j-tube seals
Diver installed j-tube seals
Waterstop seals
Topside riser hang-off equipment
With in-house control of design, component
manufacture and assembly, Subsea Innovation is able to
tailor seals to individual project requirements or provides
a specialist bespoke service for one-off designs.

Riser Hang-off Equipment

Passive J-Tube Seals

The purpose of a riser hang-off system is to provide a


structural support between the riser or umbilical and the
outer j-tube.

The Tekseal ROV passive j-tube seal provides a


lower cost alternative to the ROV activated j-tube seal.
The purpose of this seal is to provide a permanent seal
between an existing j-tube and the newly installed
riser/umbilical/cable to provide an annulus which can be
treated with corrosion inhibitor and maintain an over pressure.

Systems can also be supplied with a seal module that


provides full sealing capability in the annulus between the
riser and the j-tube.
The clamp module is fitted with the Tekgrip high integrity
collet system. The collets are energised using a low activation
torque and then become self-energising.

The seal assembly is pre-installed onto the riser/umbilical on


the vessel. This assembly comprises of a series of high integrity
elastomeric sealing elements which seal against the inside of
the bellmouth and the outside of the riser/umbilical.

The hang-off assembly is fitted with a continuous housing


that is pre-installed prior to riser pull-in. Once the pull-in is
complete Subsea Innovation service engineers perform the
final assembly of the unit. It is essential to perform a seal
verification test prior to leaving the worksite.

The disadvantage of this system over the ROV activated seal


is that a re-intervention cannot be performed. Should any
unforeseen problem arise and a leak occurs, the system
cannot be reactivated to achieve a seal.

Technical Specification

All Tekseal assemblies are designed in-house and subjected


to a factory acceptance test at Subsea Innovation to a client
approved procedure. This test is performed on Subsea
Innovations j-tube seal simulator. A full representation of the
bellmouth and riser/umbilical is manufactured and pull in tests
and activation pressures reproduced.

Riser sizes: 2 NS up to 20 NS or to suit client requirements


J-tube sizes: 8 NS up to 40 NS or to suit clients

Technical Specification

Designs are subjected to third party verification and a factory


acceptance test that verifies both load holding and sealing
capability in a test rig that simulates offshore conditions.

requirements
Axial loads: 0 to 1,500 kN
Sealing pressures: 0 to 200 bar.g
Design temperature: -20 to +100C
System coating: Norsok M501 system no: 7

Riser/umbilical diameters: 2 to 36
Bellmouths: 4 to 48
Test pressures: 0 to 10 bar.g
Seal material: Tekthane
Activation: automatic during riser pull in
Installation onto riser: topside
Installation into bellmouth: automatic during riser pull-in

Diver Installed J-Tube Seals

ROV Activated J-Tube Seals

The Tekseal diver installed j-tube seal provides an alternative


method of installation into the j-tube. The purpose of this seal
is to provide a permanent seal between an existing j-tube and
the newly installed riser/umbilical/cable to provide an annulus
which can be treated with corrosion inhibitor and maintain
an over pressure. This assembly is installed after the riser/
umbilical has been pulled into the j-tube.

The Tekseal ROV installed j-tube seal provides a field proven


solution for providing a permanent seal between an existing
j-tube and the newly installed riser/umbilical/cable to provide
an annulus which can be treated with corrosion inhibitor and
maintain an over pressure.

This assembly comprises of a series of high integrity


elastomeric sealing elements which seal against the inside of
the bellmouth and the outside of the riser/umbilical. Once the
seal is fitted into the j-tube the riser/umbilical is centralised
and the final sealing segment is installed. Seal activation
and integrity verification test is performed by the diver using
equipment supplied by Subsea Innovation.

Subsea Innovation has installed over 40 j-tube seal


assemblies worldwide.
The seal assembly is pre-installed onto the riser/umbilical on
the vessel by Subsea Innovation service engineers. Hydraulic
verification checks are performed pre-dive to ensure successful
activation. A heavy duty protection cover is fitted onto the
elastomeric seals to give protection to the seal as it is deployed
from the vessel.

The seal assembly is fitted with cathodic protection which is


designed for the operating lifetime of the assembly.

The pull-in operation pauses just prior to installing the seal


into the j-tube and the ROV removes the protection cover.

All Tekseal assemblies are designed in-house and subjected


to a factory acceptance test at Subsea Innovation to a client
approved procedure. This test is performed on Subsea
Innovations j-tube seal simulator. A full representation of the
bellmouth and riser/umbilical is manufactured and pull in tests
and activation pressures reproduced.

Following seal installation and riser/umbilical lay down,


the seal assembly is activated. This can be achieved from the
topside by a downline system which integrates via an ROV dual
hotstab or alternatively by hydraulic power from the ROV itself.
Once activated the hydraulic medium is removed and the seal
remains activated via Subsea Innovation specifically designed
mechanical locking nuts.

Technical Specification

Using the same activation system a seal verification test is then


performed. This test pressurises between the two elastomeric
seals to ensure a successful seal has been achieved.

Riser/umbilical diameters: 2 to 36
Bellmouths: 4 to 48
Test pressures: 0 to 10 bar.g
Seal material: Tekthane
Activation: diver
Installation onto riser: post installation
installation into bellmouth: post riser pull-in

The advantage of this system is that a re-intervention can be


performed on the hydraulics should a leak be evident.
With other passive systems this is not possible.
The seal assembly is fitted with cathodic protection which is
designed for the operating lifetime of the assembly.
All Tekseal assemblies are designed in house and subjected
to a factory acceptance test at Subsea Innovation to a client
approved procedure. This test is performed on Subsea
Innovations j-tube seal simulator. A full representation of the
bellmouth and riser/umbilical is manufactured and pull in tests
and activation pressures reproduced.
Technical Specification
Riser/umbilical diameters: 2 to 36
Bellmouths: 4 to 48
Test pressures: 0 to 20 bar.g
Seal material: Tekthane
Activation: hydraulic after riser pull-in
Installation onto riser: topside
Installation into bellmouth: automatic during riser pull-in

Project and Risk Management


As a leading supplier of equipment and services to the international
offshore energy and subsea sectors, Subsea Innovation is committed
to providing systems which comply with highest levels of quality
management standards.
Management system standard: BS-EN-ISO 9001:2008
Accredited by Det Norske Veritas
Certificate number: 09840-2006-AQ-LDN-UKAS

Subsea Innovation Project Management is carried to the international


standard of DNV ISO 9001.
A fully dedicated project leader manages the design and manufacture
of each project from initial acceptance through to final system
deployment. Generally the process requires a biweekly sign off with
Subsea Innovation providing relevant electronic reports.
Project schedule charts are supported by master documentation and
an ongoing activity register which relate to the initial activity schedule
as described in the accepted proposal.
Subsea Innovation systems perform in some of the most challenging
engineering environments in the world where component failure can
be catastrophic.
Our dedication to ensuring the implementation of quality procedures
at every stage of the design, build and installation process is clearly
demonstrated by the ongoing performance of our systems in the field.

Subsea Innovation Limited


Unit 3, Roundhouse Road, Faverdale East Business Park
Darlington, Co Durham DL3 0UR United Kingdom
Tel +44 (0) 1325 385270 Fax +44 (0) 1325 385285
Email info@subsea.co.uk www.subsea.co.uk

You might also like