SUMMARY
The AIA
BP 15.01.01
Best Practices
payment bond, and any other sections necessary for
successful price bids. For some projects that have unique
aspects or complex requirements, the architect and owner
elect to have a prebid meeting for potential contractors.
After bid sets are distributed, both the owner and architect
wait for bids to come in. The owner, with the help of the
architect, evaluate the bids and select a winning bid. Any
negotiation with the bidder of price or project scope, if
necessary, should be done before the contract for
construction is signed.
The final step is to award the contract to the selected
bidder with a formal letter of intent to allow construction
to begin.
Deliverables: The final deliverable is a construction
contract. Once this document is signed, project
construction can begin.
page 2 of 2
For More Information on This Topic
See also the 14th edition of the
Handbook, which can be ordered from
the AIA Store by calling 800-242-3837
(option 4) or by email at
bookstore@aia.org.
See also Defining Project Services
beginning on page 952 of the 15th
Edition of the Architects Handbook of
Professional Practice. The Handbook
can be ordered from the AIA Store
online at www.aia.org/store, by calling
800-242-3837 (option 4), or by email
at bookstore@aia.org.
Feedback
The AIA welcomes member feedback on Best Practice
articles. To provide feedback on this article, please
contact bestpractices@aia.org.
Key Terms
Design
Preliminary design
Schematic design
Design development
Construction documents
Bidding or negotiation
Construction contract administration
July 2007
RESOURCES
More Best Practices
The following AIA Best Practices provide additional
information related to this topic:
10.08.01 Qualifications-Based vs. Low-Bid Contractor
Selection
09.04.02 How Roles Change in Design-Build
10.10.04 Terminology: As-Built Drawings, Record
Drawings, Measured Drawings
The Knowledge Resources Staff based this Best Practice
on definitions in the AIA Contract Documents as well as
in the 12th, 13th, and the 14th editions of The Architects
Handbook of Professional Practice.