Tps Manual
Tps Manual
Tps Manual
Page : 1/33
TABLE OF CONTENTS
Purpose of the manual Page 3
Who can access.Page 3
How to access... Page 3
Whom to contact ...Page 3
Menu options
Engineering
BOM Upload from Excel to Oracle Apps ......Page 5
Material Management
Site Receipt Details ....Page 8
Receipt From Customer ..Page 13
Issue.Page 15
Store Returns...Page 18
Cash Purchases Page 20
Commercial
Road Permit Tracking ..Page 22
Invoicing Planning
..Page 24
Drawing & Document Generation & Transmittal
Create Drawing Numbers.Page 26
Create Document Numbers..Page 27
Drawing/Document Numbers...Page 28
Internal Transmittal...Page 29
Print Transmittal....Page 31
Reports...Page 33
Page : 2/33
NOTE: To maintain the system security, a facility of changing the password is provided. It is
recommended that users should change the password every month. Password should be Alpha
numeric with minimum 7 characters and should not be repeated.
Change Password : Press Button Change Password provided in the login screen. Enter your
Username, Old Password and New password. Once password is updated, enter new password and
log on to the system.
Forgot Password : If you forget your password, click on the Forgot Password button provided
in the login screen. You are prompted to enter your Username and if correct username is provided
then your password is mailed to you to your e-mail address as specified in the system.
After successful login, the Main screen as below with restricted access will appear.
For Desktop Users( LAN / WAN Users Regions/site )
Click on the CiTRIX icon on your desktop. Enter user name/password of CiTRIX. If you
have not been provided with this information, contact Local ISG - Helpdesk person for
the same.
After successful login of CiTRIX screen, double-click on the TPS icon available on the
desktop.
Enter Username and Password provided to you when the login screen appears after a
while. If you have not been provided with a username/password, please contact BTG
coordinator for the same.
Page : 3/33
Following is the screen shot that appears after the user logons on to TPS. The menu options are
seen on the left side under the Security Menu. Users will restricted menu items i.e only those
where access is provided. Your can choose your frequently used menu options and push them to
the right side under the option My Favourites.
General Information : Please note that the fields with yellow background are mandatory and
with red asterisk indicate that list of values are attached to the field. Pick lists are attached with
the fields wherever possible. On clicking a field, if the text List of Values appear at the bottom
bar, that indicates the field contains a pick list or list of values. Press F9 to select from the master
list
Various buttons are provided on the right side of the screen
Save Saves the current transactions
Clear Clears the data from the current form.
Cancels Cancels the document.
Exit Exit from the session.
Whom to contact:
For Operational help : Contact your divisional coordinator
For software related queries : Contact your local BTG helpdesk or e-mail
hprism@thermaxindia.com.
Page : 4/33
Following are the menu options with screen layouts for ready reference
1. BOM Upload from Excel to Oracle Apps : This option which allow the user to upload the
BOM from excel file to Oracle Apps BOM. The excel file generated is the output of the
Smart Plan which is an engineering standard software . This process needs to be carried out
in two steps, (a) upload file in TPS and (b) run the request in Oracle Apps to transfer the
details.
(a) BOM Upload from Excel in TPS
Navigation menu:
Login in to TPS. Navigate to Post Sales Engineering Tools BOM Upload from
excel.
Steps
1. On selecting the menu option enter the required inputs
2. Select the excel version viz. Excel 97, 2000 depending on the version on your desktop.
3. Next click on the icon and select the file to be uploaded. You can browse through local
directory and select the file from your hard disk or mapped drives.
4. Check on the following points in the excel file before uploading
a. The first row should contain the field labels
b. From the second row onwards the data begins
c. The 21st column in the excel contains the part numbers to be uploaded.
d. Part numbers are already created in the oracle apps.
e. There are no hidden columns and rows.
f. No macros are set in the excel file.
5. Next select the OC No. to be imported. The approved project list will appear.
6. Enter the assembly code wherein you need to upload the BOM. Ensure that the assembly
code selected is component / child item in the Bill of material for the selected OC.
7. Click on the Import button . The data will get populated in the lower block . Please
note that each row in the excel file will be treated as a single line and if the item repeats it
will be summed up at item level.
8. Click on the Save Button to save the data imported.
9. System will validate the data and displayed appropriate messages if case of failure or
completion of process.
10. Refer screen shot for more details
Page : 5/33
Page : 6/33
9. In case the BOM selected for uploading is already exists in oracle apps, it will first
update all the child items with end effectively date and upload all the child items from the
excel with. The current BOM items will have todays date as new effectively date.
Page : 7/33
Site Receipt:
The process starts with the receipt of material at site against TL GRN made at H/O in Oracle
Apps. In case the material received at site is in short/excess, a Material discrepancy report will
be generated. In case the material received at site is rejected due to some reasons, the details can
be entered in actual receipt quantity. In case material is in damage condition, System will send
email notification to concern buyer.
Navigation menu: Material Management Site Receipt Details Site Receipt
Steps
1. Select (Press F9 key for pick list you will get pending TL OC numbers) or enter TL OC
number for receiving material at site.
2. Select or enter TL GRN. By pressing enter key, system will show PO number, PO date,
Supplier code, name, address, GRN date, buyer name, excise invoice number, date, LR
number, LR date, item description, unit and receipt quantity. Also TIL OC number appears in
TIL OC column, if earlier it was linked with TL OC.
3. Enter TIL receipt date, default date appears todays date.
4. Enter the excise invoice number, default appears from TL GRN.
5. Enter the excise invoice date (dd-mm-yyyy) default appears from TL GRN.
6. Enter the excise amount, Cess, S& H Cess and CST amount.
7. Enter the remark if applicable.
8. Enter Actual receipt quantity, default is receipt quantity user can change depends on actual
receipt
Page : 8/33
9.
10.
11.
12.
13. Select division Enviro for ESP, WWS for WTP and TBW/ESD for Boilers and enter OC
number as applicable for the project.
14. Press Display button and press Explode all button.
Page : 9/33
Page : 10/33
Page : 11/33
Page : 12/33
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Steps
Select OC number for receipts from customer.
Enter customer receipt date, default date appears todays date.
Select Receipt type from pick list.
Prepare by, system will show the default login name. You cannot change it.
After save button pressed system will generate receipt number and shows 0in receipt no
filled.
Accept date will appear in accept mode of customer receipt.
Enter challan number, challan date, LR number, LR date, transporter and remark if
applicable.
Enter item code, UOM, item description and receipt quantity.
Stock will show the system if item code exists in stock.
Enter rate if applicable.
Press save button to confirm. System will generate receipt document number.
Page : 13/33
Steps
1. Select OC number for receipts from customer.
2. Enter draft receipt number and press enter. System will display the all details from draft
receipt.
3. Enter accept date, default date appears todays date
4. Enter Accept quantity, default quantity appears from receipt quantity.
5. Press save button to approve customer receipt.
Page : 14/33
Issues
Draft Issue Note:
Navigation: Material Management Issue
Steps
1.
2.
3.
4.
5.
6.
7.
8.
9.
Page : 15/33
Page : 16/33
Steps
1. Select or enter OC number for issue material to site.
2. Once OC number entered customer name will displayed automatically.
3. Enter draft issue number and press enter. System will display the all details from draft
issue.
4. Enter approve date, default date appears todays date
5. Enter issue quantity, default quantity appears from draft issue quantity.
6. Press save button to approve issue. After approve the issue on hand quantity will get
reduced.
Page : 17/33
Store Returns
Draft Store Returns:
Navigation: Material Management Store Returns
Steps
1. Select (Press F9 key for pick list you will get OC numbers those having material issue at
site) or enter OC number for store return material from site.
2. SRN number will get auto generated.
3. Enter draft store return date, default date appears todays date.
4. Enter challan number, challan date, LR number, LR date, transporter and remark if
applicable
5. Select (Press F9 key for pick list you will get all item against selected approved issue
number) or enter valid item code.
6. Enter receipt quantity, default it appears issued quantity.
7. Accept quantity can be enters in accept mode.
8. Press Save button to save draft store returns. System will generate the draft store return
number.
Page : 18/33
Steps
1. Select (Press F9 key for pick list you will get OC numbers those having draft store
returns) or enter OC number for store return material from site.
2. Enter draft store return number and press enter. System will display the all details from
draft store return.
3. Enter approve date, default date appears todays date
4. Enter accept quantity, default quantity appears from draft store return.
5. Press save button to approve store return. After approved the on hand quantity will get
increased.
Page : 19/33
Cash Purchases
Draft Cash Purchase:
Navigation: Material Management Cash Purchases
Steps
1.
2.
3.
4.
Page : 20/33
Steps
1. Select (Press F9 key for pick list you will get OC numbers those having draft cash
purchase store returns) or enter OC number for approve cash purchase store return note.
2. Enter draft cash purchase store return number and press enter. System will display the all
details from draft cash purchase store return.
3. Enter approve date, default date appears todays date
4. Enter accept quantity, default quantity appears from draft cash purchase store return.
5. Press save button to approve store return. After approved the on hand quantity will get
increased.
Page : 21/33
Road Permit Tracking : Road permit tracking menu option will allow the user to keep track of
road permit received from the customer against particular project number.
Navigation menu:
Post Sales Project Management
Steps to be followed
1 Select OC No, Press F9 to get list of order registered.
2 Enter Road Permit no.
3 Enter Road Permit Received Date.
4 Enter Road Permit Received By.
5 Enter Issue date
(Issue By will be the name of person who logged in the system)
6 Enter Issue to (Enter name of person to whom you issue the Road Permit)
7 Select Department, Press F9 to get list of Department.
8 Enter Vendor name, (Vendor issue and inter division issue should be maintained
Separately)
10 Click Save button to save transactions.
Page : 22/33
Find Road Permit : Enter road permit no you want to search and press Find
Button. The Cursor will go to entered Road Permit no.
Multi Road Permit Entries
1. Enter Prefix (WB00, RJ, OR01 etc).
2. Enter Starting and ending number (1, 10) in R.Permit From and R.Permit to Field respectively
3. Enter Received By.
4. Enter Received Date.
5 Select Department, Press F9 to get list of Department.
Delete Record This is used to delete the selected plan entry for given billing Schedule Item.
Clear - This will clear the details on screen and control will go to OC No.
Page : 23/33
Invoice Planning : Invoice planning option is used to keep track of the monthly planned
invoicing at each billing schedule item level for a given OC. The user to enter the planned amount
for a given month. Once the month is done, the system will calculate the Backlog, Actual and
Surplus Invoice entered. The invoice cannot be planned for closed months, only opened and
future month can be planned.
Navigation Menu :
Steps to follow
1 Select OC No ,Press F9 to get list of order registered .
2 Select Package(like BBOP, STG etc) ,Press F9 to get list of Package registered
3 Select Main group ,Press F9 to get list of Main group for given OC and
Package.
4 Select Sub Group ,Press F9 to get list of Sub group for given OC ,
Package and Main Group .This is optional field.
5 Select Plan Details, The options are All ,Planned and Balance .
By selecting All will display all the item .
By selecting Planned will display only Planned item ( For which planned is
entered).
By selecting Balance will display only Balance item ( For which planned is
not entered).
6 Entered Plan From date and To Date, this field only be editable if you select
Page : 24/33
Page : 25/33
Enter the OC No
Enter the Category viz.. C-Civil, E-Electrical, I-Instrumentation, M-Mechnanical
Enter the Paper code viz. A0,A1,A2,A3
Enter No of Sheets Number field
Enter the drawing Title max field length of 60 characters
Enter the Drawing Type Select from the master list.
The system will display the 10 digit drawing number. (refer screen shot) User to click on
Save Button to save the record.
Page : 26/33
Create Document Numbers : This menu option will allow the user to generate a 10 digit
document number based on the pre-defined logic given below.
Digits
12
345
6
789
10
PP
OC No.
Category
Document Type
O
(Fixed Value)
(Last 3
(M,E,I,C) (based on master list) (Fixed value)
digits)
Navigation menu :
Login in to TPS. Post Sales Drawing & Document Management Document Number
Generation
Steps
1.
2.
3.
4.
5.
Enter the OC No
Enter the Category viz.. C-Civil, E-Electrical, I-Instrumentation, M-Mechnanical
Enter the drawing Title max field length of 60 characters
Enter the Drawing Type Select from the master list.
The system will display the 10 digit drawing number. (refer screen shot) User to click on
Save Button to save the record.
Page : 27/33
Drawing/Document Revision : This menu option will allow the user to generate the next
revision number and update the reason for revising the document / drawing.
Navigation menu :
Login in to TPS. Post Sales Drawing & Document Management Drawing/Document
Number Revision
Steps
1.
2.
3.
4.
Page : 28/33
Internal Transmittal : This menu option will allow the user to create a internal transmittal i.e.
within the division. An email notification will be triggered to the recipient about the transmittal
details.
Navigation menu :
Login in to TPS. Post Sales Drawing & Document Management Drawing Transmittal
Internal Transmittal Create Internal Transmittal.
Steps
1. Enter the OC No Mandatory field
2. Transmittal Number will be auto generated. Internal Transmittal number will begin with
I followed by auto incremented number. For every OC the transmittal number will begin
with 001.
3. From Dept Select from the master list
4. From user default user will be the logon on user, however the name can be changed
5. To Dept Select from the master list
6. To user - Select from the master list
7. Click on the CC Button to select the list of persons
8. Doc type or category or drg/doc type to be selected Optional field
9. Drawing numbers / document numbers will be displayed or user can select the drawing or
document number. User needs to select the reason for transmittal
10. click on the check box for selection of the document/drawing.
11. Click on the Save button and the drawing transmittal will get saved with an e-mail
notification triggered to the recipients of the transmittal
Page : 29/33
Page : 30/33
Print Transmittal : This menu option will allow the user to print the transmittal generated.
Navigation menu :
Login in to TPS. Post Sales Drawing & Document Management Print Transmittal.
Steps
1.
2.
3.
4.
5.
6.
Page : 31/33
Page : 32/33
Reports : This menu option will allow the user to print the transmittal generated in excel format.
The user can keep track of the various drawings/document transmitted for a given OC No.
Navigation menu :
Login in to TPS. Post Sales Drawing & Document Management Drawing transmittal
Reports.
Steps
1. Enter the OC No Mandatory field
2. Enter the Range of Transmittal numbers Optional Field.
3. Enter the range of Dates , Dept, category, Drawing/Document Type, Drawing / Document
Number. All the fields are optional
4. Select the excel version depending on the excel version on your desktop
5. Click on the Save button to generate the output to excel file. ( refer screen Shot)
Page : 33/33