Progress Measurement Procedure
Progress Measurement Procedure
Progress Measurement Procedure
C-84537-SB-YY1-PRT-WL-00-1004
Originator
COPI Group Owner
Area
Location
System
Document Type
Discipline / Subdiscipline
Old COPI Document No.
:
:
:
:
:
:
:
:
0B
IFA
03 Des 13
Issued for
Approval
TA
WD
TS
HK
NN
Not
Reqd
0A
IFC
11 Nov 13
Issued for
Comment
TA
WD
TS
HK
NN
Not
Reqd
Prepared
Checked
Rev
Status
Issue Date
Project
Engineer
Project
Manager
Unit
Owner
Approved
Contractor Approvals
COPI Approvals
Printed initials in the approval boxes confirm that the document has been signed.
The originals are held within Document Management.
Revision Sheet
ConocoPhillips Indonesia Inc. Ltd
REVISION
DATE
DESCRIPTION OF CHANGE
0A
11 Nov 13
0B
03 Dec 2013
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 3 of 19
Contents
1
2
3
Purpose............................................................................................................................5
Scope...............................................................................................................................5
Definition ........................................................................................................................5
3.1
3.2
3.3
3.4
3.5
3.6
Appendices
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 4 of 19
Appendices
Appendix 1 Weight Factor for Each Work Pack ............................................................ 8
Appendix 2 Weight Factor for Overall Project .............................................................. 12
Appendix 3 Weight Factor for Detailed Design and Construction Engineering ............ 14
Appendix 4 Weight Factor for Construction (Detailed Break Down). ....17
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 5 of 19
1 Purpose
This Progress Measuring Procedure is intended to define the progress calculation
for Suban 13, 14 & 2 Shutdown Tie Ins Provision Project ConocoPhillips Ltd.
2 Scope
This procedure describes the basis concept and method to be used to calculate the
progress achievement of Suban 13, 14 & 2 Shutdown Tie Ins Provision Project by
PT. Shaftindo Energi.
3 Definition
3.1 Work Pack 01 Project Management and Administration
Project Management and Administration are divided into :
1.1.1 General Project Management Service
1.1.2 General Service to Company
Project Management and Administration Progress is measured proportionally
against Engineering, Procurement, Construction, MC and Final Acceptance
Progress, typically given below :
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 6 of 19
3.3.2
3.4.4
3.4.5
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 7 of 19
4 Weight Factors
There is two (2) kinds of weight factors thats used for Progress Calculation :
d. Local Weight Factor, used for each Workpack that shown at point 4. See
Attachment 1.
e. Global Weight Factor, used for final combination of Workpacks. This Weight
Factors is used to get The Project Overall Prrogress. See Attachment 2.
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Appendix 1
Weight Factor for Each Work Pack
Page 8 of 19
Work Tittle
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 9 of 19
Weight Factor
No
Description
(%)
01-01
I
II
01-02
I
6.50%
5.46%
3.26%
4.69%
3.13%
3.13%
9.38%
27.49%
19.02%
17.95%
Work Tittle
100.00%
Weight Factor
No
Description
(%)
02-01
Endorsement
33.33%
02-02
33.33%
02-03
33.33%
100.0%
Work Tittle
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 10 of 19
No
Description
(%)
03-01
51.81%
03-02
48.19%
Work Tittle
100%
Weight Factor
No
Description
(%)
04-01
General
34.24%
04-02
2.67%
04-03
15.33%
04-04
40.95%
04-05
6.81%
100.00%
Work Tittle
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 11 of 19
Weight Factor
No
Description
(%)
05-01
64.72%
05-02
35.28%
Work Tittle
100.00%
Weight Factor
No
Description
(%)
06-01
Final Acceptance
Final Document Completion and reporting
100.00%
100.00%
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Appendix 2
Weight Factor for Overall Project
Page 12 of 19
Work Tittle
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 13 of 19
Weight Factor
No
Description
(%)
31.80%
Engineering
0.35%
Procurement/ Fabrication
7.31%
Construction
51.75%
8.20%
Final Acceptance
0.59%
100.00%
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 14 of 19
Appendix 3
Weight Factor for Detailed Design and Construction Engineering
Work Tittle
No
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 15 of 19
Document
Description
Code
Weight Factor
(%)
C-84537-SB-YY0-PEP-WL-001001
C-84537-SB-YY1-ORG-WL-001002
C-84537-SB-YY1-ORG-WL-001001
0.76%
0.76%
0.76%
C-84537-SB-YY0-PRO-WL-001001
C-84537-SB-YY1-PRT-WL-001005
C-84537-SB-YY0-PLN-WL-001001
C-84537-SB-YY1-PRO-WL-001001
C-84537-SB-YY1-PLN-WL-001002
C-84537-SB-YY1-SHD-WL-001002
C-84537-SB-YY1-SHD-WL-001001
C-84537-SB-YY1-PRT-WL-001001
C-84537-SB-YY1-PRT-WL-001002
C-84537-SB-YY1-PRT-WL-001003
C-84537-SB-YY1-PRT-WL-001004
C-84537-SB-YY1-PRT-WL-001006
C-84537-SB-YY1-PRT-WL-001007
C-84537-SB-YY0-AUD-WL-001001
C-84537-SB-YY0-AUD-WL-001002
N/A
C-84537-SB-YY0-PLN-WL-001002
C-84537-SB-YY0-PRO-WL-001002
C-84537-SB-YY2-PLN-WL-001002
C-84537-SB-YY1-SHD-WL-001005
C-84537-SB-YY2-STF-WL-001001
C-84537-SB-YY0-PEP-WL-001002
C-84537-SB-YY1-PLN-WL-001001
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
C-84537-SB-YY1-CEM-WL-001001
C-84537-SB-YY1-JOB-WL-001001
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 16 of 19
0.76%
0.76%
Construction Procedures
29
30
31
32
C-84537-SB-YY1-STS-WL-001001
C-84537-SB-YY1-PLN-WL-001003
C-84537-SB-YY1-SDR-WL-001001
C-84537-SB-YY1-TQS-WL-001001
0.76%
0.76%
0.76%
0.76%
C-84537-SB-YY0-PLN-WL-001003
C-84537-SB-YY1-ITR-WL-001001
C-84537-SB-YY1-ITR-WL-001002
C-84537-SB-YY1-PRO-WL-001003
Quality Plan
Inspection and test plans
List of equipment and inspection devices
Index of quality procedures and document
0.76%
0.76%
0.76%
0.76%
HSE
37
C-84537-SB-HH0-PLN-WL-001001
0.76%
Drawing
38
39
40
41
42
43
44
C-84537-SB-CC0-SAD-WL-001001
C-84537-SB-CC0-SAD-WL-001002
C-84537-SB-CC0-SAD-WL-001003
C-84537-SB-CC0-SAD-WL-001004
C-84537-SB-CC0-SAD-WL-001005
C-84537-SB-CC0-SAD-WL-001005A
C-84537-SB-CC2-SAD-WL-001001
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
0.76%
33.33%
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 17 of 19
Appendix 4
Weight Factor for Construction (Detailed Break Down)
No
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 18 of 19
Weight
Factor
(USD)
(%)
Description
04-01
General
04-02
75,472.18
34.24%
5,882.36
2.67%
Site management
Civil worker
Rigger and scaffolder
Crane 50 T (including pre hiring inspection )
TMC 8 T ( including pre hiring inspection )
Light vehicle ( including pre hiring inspection )
Lifting gear
Instalation tool
Civil work equipment
Scaffolding material
0.09%
0.03%
0.07%
0.07%
0.03%
0.07%
0.09%
0.09%
0.09%
Site management
Civil worker
Rigger and scaffolder
Crane 50 T (including pre hiring inspection )
TMC 8 T ( including pre hiring inspection )
Light vehicle ( including pre hiring inspection )
Lifting gear
Instalation tool
Civil work equipment
Scaffolding material
0.02%
0.03%
0.24%
0.24%
0.09%
0.09%
0.09%
0.09%
0.09%
Demobilization
0.53%
0.53%
33,798.47
15.33%
2.46%
0.82%
0.47%
0.23%
0.23%
C-84537-SB-YY1-PRT-WL-00-1004 Rev. 0B
Page 19 of 19
Curing time
Concrete test
Pre mobilization chek list
Delevery material stell structure and foundation from JKT to Site
2.46%
Scaning
Manual handigging ( excavation ) for foundation
Install foundation
Install scaffolding
Install pipe rack
Install scaffolding for 24" 150 #
Valve relocation near shutdown tie-in point
0.23%
2.46%
0.23%
0.82%
0.82%
0.82%
0.70%
0.47%
0.35%
0.47%
Shut Down
0.12%
0.12%
0.12%
0.12%
0.12%
0.12%
0.12%
0.12%
0.35%
04-04
90,267.18
40.95%
04-05
15,000.00
6.81%
220,420.19
100.00%
Total Construction