Appendix 14-I-A Application For Setting Up Eou/Sezs or Units in Special Economic Zone
Appendix 14-I-A Application For Setting Up Eou/Sezs or Units in Special Economic Zone
Appendix 14-I-A Application For Setting Up Eou/Sezs or Units in Special Economic Zone
Please read the general instructions given in EOU/SEZ Scheme before filling this application and also
some important guidelines given at the end of this application.
3.
The application may be sent electronically or otherwise. But the same will be treated as incomplete
without its own permanent e-mail and will not be considered.
Indicate Whether The Application Is For
AUTOMATIC APPROVAL
OR
BOARD OF APPROVAL
The application should be submitted to the Development Commissioner of the concerned Special Economic
Zone(for setting up EOUs/units in SEZ) in 3 copies alongwith a crossed Demand Draft of Rs. 5,000/- drawn
in favour of the Pay & Accounts Officer, Ministry of Commerce & Industry, Department of Commerce,
payable at the Central Bank of India, Udyog Bhavan, New Delhi. (NO FEE SHALL BE CHARGED FOR
RENEWEL/ EXTENSION OF LOP/ BROAD BANDING ETC.)
______________________________
Date :
______________________________
Date__________Month____________Year __________
I.
Amount Rs.
___________________
Draft No.
___________________
Draft date
___________________
Drawn on
___________________
(Name of the Bank)
Payable at
____________________
_________________________________
Full Address
_________________________________
_________________________________
_________________________________
others
_________________________________
Pin Code
_________________________________
Tel. No.
_________________________________
Fax No.
_________________________________
_________________________________
Web-Site, if any
_________________________________
_________________________________
_________________________________
Digital Signature
_________________________________
_________________________________
_________________________________
II.
Note:-
III.
IV.
(1)
__________________________
(2)
(a)
Please indicate if the proposed location is in a Centrally Notified Backward Area [Please tick () the
appropriate entry].
No. ______________Yes_________________ if yes, indicate category
(b)
Indicate whether it is within 25 Kms from the periphery of the standard urban area limit of city
having population above one million according to 1991 census.
Yes_____________ No. __________________
(c)
(d)
If not, does it come under the category of non-polluting industries as notified by the Govt.
Yes ___________ No. _______________
V.
Item(s) Description
Capacity(Unit = )
________________
________________
________________
unit)
________________
________________
________________
VI.PRODUCTION (In case of more than one item, supplementary sheets may be used)
Quantity (Unit __________)
(Value (In Rupees)
Not required for service unit)
1st year
2nd year
3rd year
4th year
5th year
___________________
___________________
___________________
___________________
___________________
VII.
Indigenous Requirement:
a)
b)
Capital Goods
Raw material, components, consumables,
packing material, fuel etc. during the
period of 5 years
__________________
__________________
__________________
__________________
__________________
(Value in Rupees)
TOTAL:
-----------------------------------------------
VIII.
US $ (Thousand)
1st year
2nd year
3rd year
4th year
5th year
Total:
IX.
INVESTMENT:
(RS. IN LAKHS)
(a)
Land
________________________
(b)
Building
________________________
(c)
________________________
________________________
(US $ Thousand)
________________________
(iii)
________________________
(d)
X.
No_____________
(a)
(b)
(c)
(d)
(e)
(f)
XI.
Lumpsum payment
Design & Drawing fee
Payment to foreign technician
Royalty (on exports)
Royalty (on DTA sales if envisaged)
Duration of agreement
_____________________
_____________________
_____________________
____________________%
____________________
________________(No.of years)
(i)
$ Thousand)
(Rs.lakhs)
(a)
Authorized
________________
________________
(b)
Subscribed
________________
________________
(c)
Paid up Capital
________________
________________
Note:
If it is an existing company, please give the break up of the existing and proposed capital structure
(ii)
(a)
Foreign holding
(b)
(US $ Thousand)
_____________ ___________________
(i)
Repatriable
_____________ ___________________
(ii)
Non-repatriable
_____________ ___________________
(c)
Resident holding
_____________ ___________________
(d)
_____________ ___________________
(e)
FOB value of
exports in first
five years
XIII.
Foreign Exchange
outgo on
(I)
Import of
machinery
(ii)
Import of raw
materials and
components
(iii
Import of spares
and consumables
(iv)
Repatriation of dividends
and
profits to foreign
collaborators
(v)
(vi)
Royalty
Lump sum know-how
fee
(vii)
(viiii)
(ix)
Payment on training of
Indian technicians abroad
(x)
Commission on
Export etc.
(xi)
Foreign Travel
(xii)
Amount of interest to be
paid
on
external
commercial borrowing/
deferred payment credit
(specify details)
Any
other
payments(specify details)
(xiii)
Total (i)to(xiii)
Net Foreign
Exchange earnings
2nd
3rd
4th
5th
Total Total
(5 yrs)
In Rs./In Th
Lakhs US$
in five years
XIV.
XV.
__________________
__________________
(percentage of 5 yrs production)
(Qty.(Unit = )
__________________ ________________
__________________ ________________
Value (Rs. Lacs)
EMPLOYMENT
(All figures in number)
XVI.
Existing
Proposed
--------------
--------------
a)
Supervisory
Men_______________
`Women_____________
_______________
_______________
b)
Non-supervisory
Men_______________
Women_____________
_______________
_______________
XVII.
_________
_________
MARKETING
a)
________
________
No
b)
G. C. A. R. P. A.
________
________
XVIII
OTHER INFORMATION
i)
ii)(a)
(b)
__________________
__________________
Place
:_________
Date
:________
Official Seal/Stamp_________________
_________________
_________________
___________________
Tel. No.
___________________
e-mail
___________________
Web-Site, if any
___________________
Full Residential Address_________________
UNDERTAKING
I/We hereby declare that the above statements are true and correct to the best of my/our knowledge and
belief. I/We will abide by any other condition, which may be stipulated by the concerned Development
Commissioner. I/We fully understand that any Permission Letter granted to me/us on the basis of the
statement furnished is liable to cancellation or any other action that may be taken having regard to the
circumstances of the case if it is found that any of the statements or facts therein are incorrect or false. An
affidavit duly sworn in support of the above information is enclosed.
Place:__________
Date:___________
_________________
_________________
_________________
_________________
_________________
_________________
__________________
__________________
_________________
Official
Seal/Stamp
__________________
Tel. No.
e-mail Address
Web-Site
Full Residential address
Tel. No
__________________
Additional Information may be furnished by existing domestic units seeking conversion into the
EOU/SEZ Scheme as per annexure.
2.
Normally raw material tie-ups are not insisted upon but this may be necessary in cases, such as
granite/marble/sandstone products where availability of raw materials is contingent upon
Government leases etc.
3.
Normally lumpsum amount up to US $ 2 Million and 8% royalty (net of taxes) as amended from
time to time over a period of five years from the commencement of production is allowed as per the
current EOU/SEZ Scheme on account of foreign technology agreement as per the norms of
Department of Industrial Policy and Promotion. In addition selling agency commission is permitted
as per RBI norms.
4.
Cases involving high outgo of foreign exchange for capital goods and raw materials, the
Government prefers raising of funds through external commercial borrowings.
ANNEXURE
PROFORMA TO BE FILLED IN BY THE EXISTING DTA UNITS SEEKING CONVERSION INTO THE
EOU/SEZ SCHEME
a)
b)
c)
d)
e)
f)
g)
h)
Whether conversion of DTA Unit into the EOU/SEZ has been sought
for the full existing capacity of the unit or the proposal is for partial
conversion.(Please give details of the existing capacity etc.)
Whether any expansion of the DTA unit proposed to be converted into
EOU/SEZ has bee envisaged, if so the extent thereof.(Please give
details of the existing capacity and the enhanced capacity etc).
What is the level of existing exports of the unit proposed to be
converted into EOU/SEZ. (Please give details of export performance
item-wise for a minimum of three previous years)
Whether the DTA unit is already under obligation to export, under:
i) Advance Licensing Scheme;
ii) Import of machinery under EPCG scheme;
iii) Any other Scheme.
(Give all relevant details including total E.O. imposed, the E.O.
discharged till date etc.)
Whether your unit is registered with the Customs or Excise authorities.
(Please give details viz. Reg. No., date etc.)
Are you agreeable to have your whole unit customs bonded as
required under the EOU/SEZ scheme?
Whether you are a merchant exporter or a manufacturer exporter.
(Please give details)
What is the age(year of manufacture)and residual life of items/
machinery already installed in your unit, whether they are imported or
indigenous.(Please attach separate sheets giving item-wise details
with value of the new CG as well as existing value of machinery
presently installed).
Date____________
Signature________________________
Name __________________________
Place __________