Nothing Special   »   [go: up one dir, main page]

1C.5.1-Voltage Fluctuation and Flicker: 1 Scope

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Engineering Handbook

Volume 1General
Section 5.1Voltage Fluctuation and Flicker
Part CPower Quality
21 Jan 14 1C.5.1 Page 1 of 10
1C.5.1Voltage Fluctuation and Flicker
1 Scope
This document contains guidelines regarding maximum acceptable levels of voltage fluctu-
ation and light flicker in the power system. This document also discusses the causes of
voltage fluctuation and light flicker, and gives advice on minimizing this problem. This doc-
ument does not deal with voltage transients and other shortterm disturbances from normal
system operations; these are discussed in Engineering Handbook document 1C.6.1.
2 Application of Guidelines
These guidelines should be used during the planning and design of new additions to the
power system, including new loads. These guidelines should also be used to evaluate the
impact of existing loads. Fluctuations greater than the limits in these guidelines may be al-
lowed if the local customers are tolerant. All new installations should be designed to meet
these limits if other customers are exposed. For flicker problems with existing loads, and in
the absence of objective flicker meter measurements, customer intolerance to voltage fluctu-
ations is indicated by the first complaint, at which point the problem should be investigated.
3 Definitions
The following expressions are defined as used in this standard.
flicker meter. A device used to measure voltage fluctuations and objectively infer light
flicker therefrom. The inferring methodology is defined in both IEC 61000415 and the
IEEE 1453 standard for North America.
extra high voltage (EHV). Voltage greater than 230 kV.
high voltage (HV). Voltage greater than 35 kV but less than or equal to 230 kV.
HVAC. Heating, Ventilating, and Air Conditioning equipment. This includes heat pumps.
light flicker. Variable light production from a light source, sometimes due to voltage fluctu-
ation.
low voltage (LV). Less than or equal to 1 kV.
medium voltage (MV). Voltage greater than 1 kV but less than or equal to 35 kV.
P
lt
. Perception of light flicker in the long term. Long term is usually defined as a 2-hour inter-
val.
P
st
. Perception of light flicker in the short term. Short term is defined as a 10-minute interval.
point of common coupling (PCC). The nearest point on the power system where a potentially
offending fluctuating electrical load could be sensed by a load sensitive to the fluctuation. In
the absence of clear agreement on where the PCC is located, the PCC shall be defined as the
point where the power system containing the fluctuating load attaches to PacifiCorps power
system.
Engineering Handbook
Volume 1General
Part CPower Quality
Section 5.1Voltage Fluctuation and Flicker
21 Jan 14 1C.5.1 Page 2 of 10
voltage fluctuation. A sudden and noticeable change in rms voltage level, usually caused by
changing system loads. For example, a fluctuation from a voltage sag due to a large motor
start is comprised of two changes.
4 Limits and Their Applications
The limits presented here apply to those portions of the power system where voltage fluctu-
ations can be observed by other customers. These points are not only the portions of the
power system to which customers are presently connected, but also locations to which other
customers could eventually be connected (see the definition for PCC above). The utility
shall not be expected to design or build a system to handle excessive voltage fluctuations
caused by customer equipment. It is important for customers to realize that these limits exist
to protect all customers quality of service and the operability of their equipment. Good ser-
vice quality requires cooperation between the utility and the customers.
The guidelines in this document are comprised of four limits: (1) flicker, (2) infrequent
events, (3) magnitudeduration, and (4) bounded magnitude. All four limits apply. These
limits are to be used as guidelines only references upon which good judgment should be
based. These limits apply only to voltage fluctuations caused by events such as motor start-
ing, fluctuating loads and system switching, not to steady-state voltage levels.
4.1 Flicker Limits
Voltage flicker does not actually exist, though this term is often heard. When lamps
produce fluctuating light levels, and this is recognized by someone, we call this, light
flicker, or simply, flicker. Flicker can be produced either by a problem in the light
source or a fluctuation in the source voltage. If someone complains of flicker, and it is
caused by voltage fluctuation, then its cause needs to be found. Sometimes flicker is
caused by load fluctuations in the customers equipment near the flickering lamp. Such
problems can often be easily solved. If not, investigation must be taken beyond the
meter into the utility system. This usually dictates that the flicker must be objectively
measured.
4.1.1 Flicker Meter
Flicker produced by fluctuating source voltage is measured indirectly by a flicker
meter. The modern flicker meter measures voltage fluctuation and infers light
flicker by taking into account the following: how often the voltage fluctuation
occurs, how abruptly the voltage fluctuates, the kind of lamp, the sensitivity of
the eye to light, and the brains perception. All of these factors are modeled in a
modern IEEE 1453 compliant flicker meter (this measurement is more complex
than simply measuring voltage fluctuation and frequency).
Fortunately, despite its internal complexity, an IEEE flicker meters output is
simple: if the output is greater than 1.0, the flicker is generally irritable to hu-
mans; if less than 1.0, it is not. These results have been successfully validated
with many years of real-world testing in several countries. The flicker meters
main output is in a unit called P
st
, meaning, Perception of light flicker in the
short term.
Engineering Handbook
Volume 1General
Section 5.1Voltage Fluctuation and Flicker
Part CPower Quality
21 Jan 14 1C.5.1 Page 3 of 10
Planned load characteristics should be obtained directly from the customer or
equipment manufacturer. Gathering data for existing fluctuations requires the use
of a recording voltmeter having a time resolution smaller than the occurrence of
the flicker. Many recording voltmeters do not have sufficient resolution to per-
form this task.
4.1.2 Flicker Measurement Method
It is PacifiCorps policy to measure flicker with an IEEE 1453 compliant [1]
flicker meter at the PCC. Such flicker meters shall have passed an internation-
ally-accepted test protocol known to qualify digital flicker meters in real-world
testing in the range of 0.2 < P
st
< 4.0. Since flicker often comes and goes, and
human irritation to flicker is subjective, there is an objective methodology estab-
lished by the IEEE [1] for measuring with the flicker meter.
4.1.3 Planning and Compatibility Levels
The IEEE concepts are intended to allocate allowable voltage fluctuation in a fair
and equitable manner among fluctuating loads, and to ensure that these fluctu-
ations do not adversely impact customers by causing noticeable light flicker.
They are best understood by referring to Figure 1.
Figure 1Probability of Flicker and Corresponding Levels
In this figure, there is a distribution of P
st
levels at which flicker events typically
occur. Collectively, they are called the Disturbance Level. The probability of
disturbances, or flicker events, typically peaks where P
st
is at or below 0.5 in a
power system unless there is a major flickering load nearby. At a transmission
substation in a quiet area, P
st
probability typically peaks around 0.2. The Im-
munity Level indicates the number of flicker-sensitive devices that would fail if
Engineering Handbook
Volume 1General
Part CPower Quality
Section 5.1Voltage Fluctuation and Flicker
21 Jan 14 1C.5.1 Page 4 of 10
the P
st
level were that high. Or, perhaps more to the point, it can be viewed as the
number of customer light flicker complaints that would be received if the P
st
level
were that high.
When a utility sets limits for flicker, it is appropriate to set a not-to-exceed level
where only a very small number of customers would complain. This is called the
Compatibility Level in Figure 1. Under most conditions, this level would
rarely be exceeded. In order to plan a power system such that exceedance of
Compatibility Levels would indeed be rare, a Planning Level is set below the
Compatibility Level. At the Planning Level, no customer complaints for flicker
should be received. Also, the Planning Level is set more conservatively because
it is intended for higher power system voltages where the power systems capacity
to absorb flicker events can be shared among multiple large fluctuating loads.
This is sometimes called having flicker margin.
4.1.4 Specific Flicker Limits
It is PacifiCorps policy that flicker events caused by fluctuating voltage under
any load on its power system shall not exceed the P
st
or P
lt
values shown in
Table 1 as measured at the PCC within the statistical guidelines of 4.1.5. These
limits are the same as the limits in [3].
Table 1Flicker Compatibility and Planning Levels
Compatibility Levels Planning Levels
Voltage Level LV & MV MV HV & EHV
P
st
1.0 0.9 0.8
P
lt
0.8 0.7 0.6
Please note in Table 1 that only MV events have both a Compatibility Level and a
Planning Level. This means that individual compatibility problems between ex-
isting LV & MV customers are resolved at the P
st
= 1.0 level, and future MV in-
stallations are more conservatively planned for the P
st
= 0.9 level. Specific tools
for planning are found in IEEE 1453.1. When very large new fluctuating loads
are planned, these tools may be used by planners to evaluate requirements for the
new loads.
P
lt
was conceived to provide a longer-term view of flicker, typically two hours.
This is appropriate for two situations: (1) when multiple fluctuating loads must be
considered and these loads require a longer measurement interval for their com-
bined flicker characterization, and (2) when one fluctuating load such as an arc
furnace has a melt cycle that spans several ten-minute P
st
intervals.
When P
lt
is used, it should be calculated every ten minutes using a sliding inter-
val over the last two hours. The advantage of using P
lt
is that it provides a more
stable output for flicker than does P
st
. Especially when following the IEEE pro-
tocol of a one-week measurement session for flicker, reading a P
lt
plot is much
easier than reading a P
st
plot.
Engineering Handbook
Volume 1General
Section 5.1Voltage Fluctuation and Flicker
Part CPower Quality
21 Jan 14 1C.5.1 Page 5 of 10
4.1.5 Statistical Guidelines
The IEEE methodology allows the flicker limits of Table 1 to be exceeded a small
percentage of the time. This section discusses how large this percentage can be.
Generally, it is agreed that limits can be exceeded between 1% and 5% of the time
over a one-week measurement period. For purposes of comparison, of the 1008
10-minute P
st
intervals in a one-week period, a 1% exceedance would allow 10
periods to exceed the limit. This is 1 hour and 40 minutes. A 5% exceedance
corresponds to 8 hours and 20 minutes.
If the times-of-day of exceedance were objectionable, such as during the evenings
when many people had lights turned on in their homes, then the 1% limit would
make more sense. If it were to be exceeded late at night when nearly all were
sleeping, one would expect that the 5% limit would be more appropriate. In gen-
eral, large flickering loads are held to the 1% exceedance limit, especially if com-
mitment for a nocturnal time-of-day of exceedance cannot be assured.
4.2 Infrequent Events
Use of a flicker meter is best suited to voltage fluctuation events that occur frequently,
that is, more often than once per hour. For infrequent events, such as once-per-week
large motor starts, the allowable voltage change from pre-event voltage seen at the
PCC, shall be limited to 6% as an absolute maximum. A better guideline for events
occurring once-per-day, or thereabouts, as measured at the PCC, is 5.0%.
In general, customers are allowed as much self-induced voltage fluctuation as they can
tolerate. However, residential customers using whole-house air-conditioning or heat
pumps (HVAC) would be well served to limit their own voltage fluctuations to 4%.
Voltage fluctuations due to HVAC equipment starts as measured at the PCC (nearest
point where a neighbor connects to the power system, such as the service transformer
secondary) should be limited to 2.5%. Regardless of these limits, if the frequency of
fluctuation is more often than one change per hour, the P
st
flicker limits set forth in 4.1
take precedence if they can be accurately determined.
Mitigation for infrequent events is considered adequate when voltage fluctuations are
controlled such that their magnitude is within the guidelines described earlier in this
section, or their duration does not exceed two electrical cycles. If, however, this brief
voltage fluctuation is severe in magnitude, such as a large impulsive transient, then
notching limits (see Engineering Handbook section 1C.4.1.6) still apply.
4.3 MagnitudeDuration Limits
Most voltage fluctuations are short-lived. They are caused by load that draws current
with an initial large peak magnitude which decays rapidly. Occasionally, however, the
large current draw lasts for a long time. Common examples are tankless water heaters
and large momentum motor start. In such a case, the guidelines in 4.2 might need to be
further restricted in order to avoid adverse customer impacts. Also, in some instances,
taking measures to reduce the voltage fluctuation magnitude will add to its duration.
For more details, refer to [3].
At present, no industry standards for magnitudeduration limits exist. A rule of thumb
is to limit the duration of noticeable voltage fluctuation to less than ten seconds. For
Engineering Handbook
Volume 1General
Part CPower Quality
Section 5.1Voltage Fluctuation and Flicker
21 Jan 14 1C.5.1 Page 6 of 10
noticeable fluctuations lasting ten seconds or longer at a customer site, the magnitude
of fluctuation should be 3% or less, regardless of frequency.
4.4 Bounded Magnitude Limits
Sometimes a voltage level that is near a steady-state voltage range boundary (see En-
gineering Handbook document 1C.2.1) can be an additional constraint to voltage fluc-
tuation magnitude. A fluctuation could possibly push this voltage to a level objection-
able to other customers. An example of this would be a motor start at a location with
an already low, but still allowable, voltage.
In this case, a six percent voltage drop fluctuation would likely cause very observable
and objectionable effects to nearby customers.
In order to prevent such events from happening, the voltage fluctuations should stay
within the limits imposed by ANSI range B, and should only briefly (no more than a
few seconds) exceed the limits of ANSI range A (see Engineering Handbook document
1C.2.1).
4.5 Use of Older Limits
In the past, standards attempted to cover both flicker (more often than one change per
hour in frequency) and less frequent voltage fluctuations. These were generally based
on older magnitudefrequency diagrams such as the old GE curve as represented in
IEEE 519 or IEEE 141. An older PacifiCorp standard described a stairstep emulation
of these curves and extended them to cover less frequent voltage fluctuations. This is
shown below as Figure 2. While this was a useful diagram that served well for many
years, it left the reader with the impression that both the flicker limits and the infre-
quent fluctuation limits had the same scientific basis when, in fact, they didnt. Anoth-
er problem in using this older diagram is that it cannot be effectively applied to
non-rectangular or random voltage fluctuations.
It is PacifiCorps policy that, lacking adequate modeling or measurement tools to pre-
dict or measure flicker in accordance with section 4.1, limits shown in the older mag-
nitudefrequency diagram (see Figure 2) may be used for guidance. However, for in-
frequent fluctuations (fewer than one voltage change per hour) section 4.2 takes preced-
ence over the limits shown in Figure 2.
Engineering Handbook
Volume 1General
Section 5.1Voltage Fluctuation and Flicker
Part CPower Quality
21 Jan 14 1C.5.1 Page 7 of 10
P
e
r
c
e
n
t

V
o
l
t
a
g
e

F
l
u
c
t
u
a
t
i
o
n
Notes 1 and 2: During evening hours, use the next lower step.
Figure 2Historic PacifiCorp MagnitudeFrequency Flicker Diagram
4.6 Customer Facility Limits
Customers are allowed as much self-induced flicker as they will tolerate, as long as
their impact on other customers remains within the limits specified in Sections 4.14.4.
Adhering to these limits sometimes requires a voltage fluctuation study by a PacifiCorp
engineer in the planning stage.
System models must often be prepared before a voltage fluctuation study can be per-
formed. Customers should allow PacifiCorp sufficient time for a system impact study
to be performed. PacifiCorp may charge the customer based on the complexity of the
study. These studies are only valid for the information given at the time of the study.
If the motor or load size changes, another study must be performed. Customers should
understand that the purpose of these studies is to save them money on equipment while
protecting the quality of service in their area. Their cooperation is essential. If a cus-
tomer requires an immediate response, all loads listed below will require inrush mitig-
ating equipment unless a voltage fluctuation study is performed:
1. Three-phase motors over 35 hp that are served from three phase systems
2. Three-phase motors over 10 hp that are served from one- or two-phase systems
(this includes motors served from phase converters.)
3. Single-phase motor over 3 hp served from a transformer that serves other custom-
ers
4. Any other load over 2 kVA that is highly variable in nature (examples: elevators,
xray machines, arc welders, arc furnaces, and so forth.)
Engineering Handbook
Volume 1General
Part CPower Quality
Section 5.1Voltage Fluctuation and Flicker
21 Jan 14 1C.5.1 Page 8 of 10
4.6.1 Commercial or Industrial Facilities
At commercial and industrial sites, the utility may not know if self-induced flick-
er will be greater than allowable limits if it does not affect other customers. This
flicker can be a problem if sensitive loads exist on site. An example of this is a
plant with an office attached in which light flicker is evident.
The utility should not be expected to install equipment to compensate for voltage
fluctuations caused by on-site loads. The utility should install equipment neces-
sary to serve the steady-state metered demand load of the facility. Generally, it is
much more cost effective to reduce the effect of the voltage fluctuations by either
modifying the offending load, or by conditioning the voltage supplied to sensitive
equipment such as programmable controllers. Customers are responsible for
providing the necessary equipment to make the installation meet their require-
ments.
To assist customers in identifying potential problems in their facilities, Table 2
indicates the sensitivities of some common devices to temporary low voltages.
Table 2Equipment Undervoltage Sensitivities
Location of Voltage Drop Problem
Minimum Allowable Voltage
(% of equipment rating)
At terminals of starting motor 80%
(a)
All terminals of other motors that must re-accelerate 71%
(a)
Ac contactor pick-up (by standard) 85%
Dc contactor pick-up (by standard) 80%
Contactor hold-in (average of those in use) 6070%
(b)
Solid-state control devices 90%
(c)
Typical electronic equipment 80%
Metal halide or HP sodium lamp ballasts 90%
(a)Typical for NEMA design-B motors only. Value may be higher (or lower) depending on actual
motor and load characteristics.
(b)Value may be high as 80% for certain conditions during prolonged starting intervals.
(c)May typically vary by 5% depending on available tap settings of power supply transformer
when provided.
4.6.2 Residential Facilities
Standard practice requires new residential systems to be in compliance with flick-
er limits. The following assumptions are made:
1. These limits apply at the point of delivery.
2. The utility should not have to compensate for unusually large impedance in
the customers facility.
3. Most customers will have a separate feeder from the panel for high-inrush
loads.
Engineering Handbook
Volume 1General
Section 5.1Voltage Fluctuation and Flicker
Part CPower Quality
21 Jan 14 1C.5.1 Page 9 of 10
4. As with industrial or commercial loads, the residential customer is respons-
ible for mitigating self-inflicted problems caused by large fluctuating loads
such as compressors or welders.
4.6.3 New Load Considerations
Voltage fluctuations can be quite costly to correct. Large new loads being connec-
ted to the distribution system have the potential to cause voltage fluctuation prob-
lems. When it is suspected that a proposed new load may cause excessive voltage
fluctuations on the system, accurate data on the equipment and the load character-
istics must be obtained from the equipment manufacturer. The customer and util-
ity will work together to ensure the service quality in the area.
5 Conclusion
Following this guideline is not a guarantee of trouble-free voltage fluctuation. In some in-
stances, a customer may be particularly sensitive to voltage fluctuations. If the cause can be
easily mitigated for such a customer, then it should be done. If not, objective measurement
equipment such as a flicker meter is required to determine a fair balance between one cus-
tomers sensitivity and anothers need to fluctuate the voltage. It should be recognized that
certain types of electrical equipment, such as some semiconductor fabrication equipment, are
particularly susceptible to voltage fluctuations. However, it should also be recognized that
no utility system can be entirely free of such fluctuations.
6 References
[1] IEEE 1453. Recommended Practice Adoption of IEC 61000-4-15:2012, Electromag-
netic compatibility (EMC) Testing and measurement techniques Flicker meter Func-
tional and design specifications
Engineering Handbook
Volume 1General
Part CPower Quality
Section 5.1Voltage Fluctuation and Flicker
21 Jan 14 1C.5.1 Page 10 of 10
7 Issuing Department
The T&D Engineering Publications department of PacifiCorp issued this document.
Questions regarding editing, revision history and document output may be directed to the
lead editor at (503) 8135293. Technical questions and comments may be directed to:
Dennis Hansen, principal engineer, (801) 2204816, or
Rohit Nair, engineer, (801) 2204352
This material specification shall be used and duplicated only in support of PacifiCorp
projects. This document was last revised by a team that included the following authors and
reviewers:
Dennis Hansen, principal engineer
Rohit Nair, engineer
Greg Lyons, Smart Grid manager
Craig Quist, area / transmission director
Ken Shortt, engineering & environmental director
Brandon Prescott, risk & strategy director
Mark Adams, area / transmission supervisor
Larry Frick, area / transmission planning director
Aleksey Shkuratkov, engineer
Chuck Wright, senior engineer
Dave Hagen, area / transmission planning manager
Joshua Jones, engineering & environmental manager

You might also like