This document outlines various processes involved in business process architecture, requirements definition, requirements mapping, application and technical architecture, module design and build, data conversion, documentation, and business system testing. Specifically it lists over 150 individual steps across these areas coded with abbreviations like BP.010, RD.020, etc. The steps range from defining strategies and requirements to developing models, designs, programs and performing various tests. The overall purpose seems to be to provide a comprehensive list of the key activities involved in planning, developing and implementing a new business system.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
This document outlines various processes involved in business process architecture, requirements definition, requirements mapping, application and technical architecture, module design and build, data conversion, documentation, and business system testing. Specifically it lists over 150 individual steps across these areas coded with abbreviations like BP.010, RD.020, etc. The steps range from defining strategies and requirements to developing models, designs, programs and performing various tests. The overall purpose seems to be to provide a comprehensive list of the key activities involved in planning, developing and implementing a new business system.
This document outlines various processes involved in business process architecture, requirements definition, requirements mapping, application and technical architecture, module design and build, data conversion, documentation, and business system testing. Specifically it lists over 150 individual steps across these areas coded with abbreviations like BP.010, RD.020, etc. The steps range from defining strategies and requirements to developing models, designs, programs and performing various tests. The overall purpose seems to be to provide a comprehensive list of the key activities involved in planning, developing and implementing a new business system.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
This document outlines various processes involved in business process architecture, requirements definition, requirements mapping, application and technical architecture, module design and build, data conversion, documentation, and business system testing. Specifically it lists over 150 individual steps across these areas coded with abbreviations like BP.010, RD.020, etc. The steps range from defining strategies and requirements to developing models, designs, programs and performing various tests. The overall purpose seems to be to provide a comprehensive list of the key activities involved in planning, developing and implementing a new business system.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
Download as doc, pdf, or txt
You are on page 1of 3
At a glance
Powered by AI
The document outlines the key phases and activities involved in implementing a new business system from requirements definition to testing.
The main steps in the business process architecture phase include defining business and process strategy, cataloging and analyzing potential changes, determining data gathering requirements, developing current and future process models, and documenting business procedures.
Some of the key activities involved in the application and technical architecture phase include identifying the current technical architecture, developing preliminary and revised conceptual architectures, defining application, security, and server architectures, and defining the system capacity plan, platform, and deployment plan.
AIM Document List
Business Process Architecture (BP)
BP.010 Define Business and Process Strategy
BP.020 Catalog and Analyze Potential Changes BP.030 Determine Data Gathering Requirements BP.040 Develop Current Process Model BP.050 Review Leading Practices BP.060 Develop High-Level Process Vision BP.070 Develop High-Level Process Design BP.080 Develop Future Process Model BP.090 Document Business Procedure
Business Requirements Definition (RD)
RD.010 Identify Current Financial and Operating Structure
RD.020 Conduct Current Business Baseline RD.030 Establish Process and Mapping Summary RD.040 Gather Business Volumes and Metrics RD.050 Gather Business Requirements RD.060 Determine Audit and Control Requirements RD.070 Identify Business Availability Requirements RD.080 Identify Reporting and Information Access Requirements
Business Requirements Mapping
BR.010 Analyze High-Level Gaps
BR.020 Prepare mapping environment BR.030 Map Business requirements BR.040 Map Business Data BR.050 Conduct Integration Fit Analysis BR.060 Create Information Model BR.070 Create Reporting Fit Analysis BR.080 Test Business Solutions BR.090 Confirm Integrated Business Solutions BR.100 Define Applications Setup BR.110 Define security Profiles
Application and Technical Architecture (TA)
TA.010 Define Architecture Requirements and Strategy
TA.020 Identify Current Technical Architecture TA.030 Develop Preliminary Conceptual Architecture TA.040 Define Application Architecture TA.050 Define System Availability Strategy TA.060 Define Reporting and Information Access Strategy TA.070 Revise Conceptual Architecture TA.080 Define Application Security Architecture TA.090 Define Application and Database Server Archtecture TA.100 Define and Propose Architecture Subsystems TA.110 Define System Capacity Plan TA.120 Define Platform and Network Architecture TA.130 Define Application Deployment Plan TA.140 Assess Performance Risks TA.150 Define System Management Procedures
CV.010 Define data conversion requirements and strategy
CV.020 Define Conversion standards CV.030 Prepare conversion environment CV.040 Perform conversion data mapping CV.050 Define manual conversion procedures CV.060 Design conversion programs CV.070 Prepare conversion test plans CV.080 Develop conversion programs CV.090 Perform conversion unit tests CV.100 Perform conversion business objects CV.110 Perform conversion validation tests CV.120 Install conversion programs CV.130 Convert and verify data
Documentation (DO)
DO.010 Define documentation requirements and strategy
DO.020 Define Documentation standards and procedures DO.030 Prepare glossary DO.040 Prepare documentation environment DO.050 Produce documentation prototypes and templates DO.060 Publish user reference manual DO.070 Publish user guide DO.080 Publish technical reference manual DO.090 Publish system management guide
Business System Testing (TE)
TE.010 Define testing requirements and strategy
TE.020 Develop unit test script TE.030 Develop link test script TE.040 Develop system test script TE.050 Develop systems integration test script TE.060 Prepare testing environments TE.070 Perform unit test TE.080 Perform link test TE.090 perform installation test TE.100 Prepare key users for testing TE.110 Perform system test TE.120 Perform systems integration test TE.130 Perform Acceptance test