Gasifikasi
Gasifikasi
Gasifikasi
Karsten Radtke, Head of Gas Technologies Division ThyssenKrupp Uhde GmbH, Dortmund, Germany
Krupp Family
In 2011, we celebrate round numbers: 200 years ago: Krupp founded in 1811 140 years ago: Thyssen founded in 1871 90 years ago: Uhde founded in 1921 70 years ago: Entrained-Flow Gasification Koppers-Totzek invented in 1941 Other round numbers...
Over 100 gasifiers put into successful operation by Uhde Over 180,000 ThyssenKrupp colleagues worldwide
ThyssenKrupp Uhde
+ Further News - September 2011: 9,500 bpd CTL facility in Mozambique to apply PRENFLO PDQ technology + Further News - September 2011: ThyssenKrupp Uhde & SGC Energia sign PRENFLO Master Contract for CTL + Further News - August 2011: C.GEN selects PRENFLO PDQ for IGCC in Killingholme, UK
Whats New?
ThyssenKrupp Uhde
PRENFLO
Entrained-Flow Gasification
HTW
(High-Temperature Winkler) Fluidised Bed Gasification
Oil Gasification
ThyssenKrupp Uhde
PSG
PDQ
HTW
Fluidised Bed
ThyssenKrupp Uhde
Entrained-Flow
ThyssenKrupp Uhde
ThyssenKrupp Uhde
HTW
Cyclone Refractory Lined Gasification Chamber Recycle Line
HTW Gasification
Rt1
Pressurised, fluidised bed Temperature: 800 - 1000 C Pressure: 10 - 30 bar Operates below ash melting point (ideal for coals with high ash melting point, biomass, lignite, waste)
Biomass to Methanol plant Feedstock: Domestic forest residue Grain size: < 4mm for biomass
HTW Gasifier
8
ThyssenKrupp Uhde
Slide 8 Rt1
Karsten Rick Radtke, 10/1/2011
PDU Scale
Pilot Scale
Industrial Scale
Low-rank coals Brown coal High-S brown coal Lignite Subbituminous coal Hard coals Ensdorf-Saar Pittsburgh No.8 Other low-rank fuels (biom ass and energy crops) Peat Wood Grasses Waste materials Sewage sludge Loaded coke Used plastics
ThyssenKrupp Uhde
HTW Gasification Plant Berrenrath, Germany Feedstock: 30 t/h lignite Product: 300 t/d methanol
Operating Year
HTW Plant at Berrenrath (entire plant complex availability)
10
ThyssenKrupp Uhde
HTW Gasification Plant Biomass Gasification Kemira Oy, Oulu / Finland Feedstock: 30 t/h peat Product: 300 t/d NH3
11
ThyssenKrupp Uhde
HTW Waste Gasification Sumitomo Heavy Industries Ltd. Niihama / Japan Feedstock: 48 t/d MSW
12
ThyssenKrupp Uhde
13
ThyssenKrupp Uhde
14
ThyssenKrupp Uhde
Source: http://www.cgenpower.com/en/projects_killingholme.html
15
ThyssenKrupp Uhde
ThyssenKrupp Uhde and largest utility in Korea, KEPCO, form Joint Venture Company for PRENFLO PSG gasification KEPCO-Uhde Inc. established in South Korea 14 July 2011. First 2 SNG projects launched for KEPCO-Uhde JV provides strong synergy, cost and schedule advantages
16
ThyssenKrupp Uhde
17
ThyssenKrupp Uhde
SGC Energia
ThyssenKrupp Uhde and SGC Energia enter into Master License and Supply Agreement for multiple CTL projects applying PRENFLO PDQ and SGCEs Fischer-Tropsch Process SGCEs proprietary XTLH solution
E N E R G I A
September 2011: License and Supply Agreement for 9,500 barrels/day CTL Plant in Mozambique effective
18
ThyssenKrupp Uhde
PRENFLO PDQ licensed High-ash coal (37 %) will be utilised for generating clean Fischer-Tropsch fuels for domestic and export use Plant Capacity: 9,500 barrels/day
19
ThyssenKrupp Uhde
20
ThyssenKrupp Uhde
18,000 barrels/day Adams Fork Energy CTG Project based on PRENFLO PDQ permitted, 2 duplicate projects in Kentucky permitted Construction for all 3 projects commenced in May/June 2011 Combined, these 3 TransGas CTG projects represent ~7 % of entire U.S. gasoline import
21
ThyssenKrupp Uhde
22
ThyssenKrupp Uhde
23
ThyssenKrupp Uhde
24
ThyssenKrupp Uhde
25
ThyssenKrupp Uhde
26
ThyssenKrupp Uhde
27
ThyssenKrupp Uhde
www.prenflo.com prenflo.uhde@thyssenkrupp.com
28
ThyssenKrupp Uhde