Master Plan of Tasi Tolu Lake - JK00 PDF
Master Plan of Tasi Tolu Lake - JK00 PDF
Master Plan of Tasi Tolu Lake - JK00 PDF
Existing Situation
During rainy season
Natural watershed
Existing Situation
A large flock of visiting Australian Pelican beneath parched dry season hills , Aug 2006 Horse race
Bare hill during dry season, potential to cause land slide Sedimentation from hill after the end of rainy season
Great Knot (globally vulnerable, uncommon Palearctic shorebird migrant to Timor-Leste) (3 Nov 2006)
Existing Situation
Beach and sand bed
Military barrack
Bird eye & Roadside View of Pope John Paul II Commemorative Memorial Landslide and sedimentation
RECREATION AREA Lake Tasi Tolu for fishing, swiming, canoing etc ECO FRIENDLY AREA
Sustainable environment that care with the surrounding
Site Threaten :
Buildable area Land slide
ICONIC AREA
Modern and vernacular buiding around the lake
Forest Walk
Iconic Building
Physical Building:
Remove and relocate slums settlements around the lake and hill side into a settlement controlled area.
Proposed Activities
Create leisure and amusement zones, and economic opportunity by using urban green and green economic concept (environmental friendly development). Protecting upstream zone from physical development and improve hilly area with reforestation and greenery. Planting tree types suitable for local climate and soil type. Develop sport facilities center, playgrounds, jogging track, biking lane in forest area, forest trekking, water sport, etc. Develop mixed-use area along north road side and limiting floor area ratio of physical development zone close to airport area in line with ICAO regulation. Relocate squatter settlements around lake into controlled settlement area. Develop business services such as resort hotels restaurant in safe and strategic location, economic view and environmentally sound. Connecting all locations with better mass transportation, and localizing private car in the central parking zone. Equipped locations with adequate water, energy and treat waste based on international standard.
Military Barrack
Forest walk
Forest Walk
Forest walk
Iconic Building
Lake jetty
Town House
Town House
Planned Street surrounding lake (8 m wide) Street side Retaining Wall Lake embankment
Sheetpiling
EarthWork
Lake Embankment