Trex 05106
Trex 05106
Trex 05106
j Bob Walsh
Aspecls Covered rvebsites. from Cameron Transocean and equipment alertsfor Cameron Downloaded Equipment all Subsea alerts.Contacted Reviewedall EmpacWO's and RMS jobs to detenninethe statusof all equipment managemenl system. supportfor possibleupdateof alerts that were not coveredin the maintenance
Aspecfs Nof-Covered
2.2
Mef hod ol lnvesfigolion data frotn Daily activiS report. as well as supplemental Revie,rved existing recordsfrom RMS, Ernpac,Sub-Sea lvith ernailsandphoneconversations TechnicalField Support.
2.3
Relerence Documenls
5 roG
Exhibit No.
CONFIDENTIAL
WorldwideCourt
Inc.
TRN-tNV-03353731
DEEPWATER HORIZON
Tronsoceon InlernolIncidenl Investigolion
(Solenoid cis-01-c06 Valve(3/2Way) CabteUpgrade) (EventLogger: CIS-01-C07 Features Upgrades) & (standard cls-O1-c08 shuttle Valve cameron in controlsystems Marklll) (Drilling CIS-01-C09 Control System Troubteshooting Guide) CIS-01-C10 (Unbalanced Shuttle Valvein Cameron Controlsystems) CIS-01-C11 (Pressure Biased Shutile Valve ROVFunctions) for cls-01-c12(HighDragshuttle Vatve cameron in controt systems Markilt Upgrade) cfs-04-001 (18-314 Annular stripperPackerfor cameron18-314" 10,000psi Annular BOP) packing) (Cameron Annular CIS-04-002 D/Dl Blowout Preventer packingElement) (18-3/4"-5000 LowTemperature CI5-04-003 psi Annutar CI5-96-002 (Proper Storage Cameron of Elastomer Products)
E8 831M (STROKELtMtT- MODEL 70 & HC COLLETCONNECTORS)
EB 015W (onwellhead year equipment (1981)) EB 046D (F|ELD REPLACEMENT ,SS- BOp BONNET OF BOLTS) EB 096W (on 1/4checkvalves)
EB 124D (F' BLOWOUT PREVENTER SH@TREMOVAL TOOLS) EB'126 (Storage agingof rubber goods) W and
EB 136 D (OPERATORHOOti-UpFOR'F',PREVENTER)
j EB 160D ( SKEWED FACEVERSUS FLATFACERAMPACKERS FoR'U'Bops) OUTLET AVA|LAB|LIT\1 i EB 191D ('U'BOp S|DE
I EB 195 D (USE OF RAM PACKERStN RAMS OF DTFFERENT STZES)
g_gll_E_r g_9ll-E-g-I_ol_i__E_B_?19_D_q_E-y9_?F_lgg
i EB241M OHE PIN CONNECTOR)
_;
2 CONFIDENTIAL
TRN-lNV-03353732
HORIZON DEEPWATER
ion lnlernolIncideni Investigof Trqnsoceon
Tool(ERT)) Recovery Emergency RiserPackage EB 503 D (Lower PREVENTERS) BLOWOUT SNUBBING EB 521 D (SIORC -- CAMERON ANNULAR BOP) D RECOMMENDATIONS EB 527D (STRIPPING RAM CENTRALIZING "U type") EB 532 D ( DUALSTRING AND RAM STRING CENTRALIZING OPERATION MAINTENANCE) EB 533D (DUAL Bolt bonnet boltand Hydraulic Tensioner) Hydraulic EB 537 D (Camerron
CARE, AND MAINTENANCE) EB 538 D ( SHEARINGBLIND RAMS -- OPERATION,
DATA) BORERAM-- ENGINEERING EB 555 D (VARIABLE plating nutsand bolts(1988) of EB 561W (Cadmium BORESHEARBONNETS) EB 571 D (LARGE AND USE OF SHUTTLEVALVE WITH S/ORC SNUBBING EB 580 D (OPERATTON BLOWOUT PREVENTERS)
EB 599 C (CANERON t-1l2" POD VALVE WITH QUICK DUMP 309s38-01 -02 i , 4" CAMERONY DUMP VALVE 309542-01) DESIGN) EB 601 D (CANERONCOLLETCONNECTOR SELF.LOCKING
BONNETBOLTi OF EB 603 D (SAFE OPERATTON THE CAMERONHYDRAULIC TENSTONER) BowlPreparation) EB 608W (installation BOPPlugTypeTesterin "FMTB" of
EB 637 D (ST-LOCKSEQUENCINGVALVE FOR T BOP) PROCEDURETHROUGH CAMERON RAM-TYPE EB 641 D ( STRIPPING(SNUBBING) BLOWOUT PREVENTERS)
HOSEBUNDLES) CONTROL i BOPANDWORKOVER FOR THE CASTLENUT i EB 667 W (RECOMMEND OPERATING PROCEDURES TIEDOWN SCREW)
CONFIDENTIAL
TRN-tNV-03353733
DEEPWATER HORIZON
Tronsoceon InternolIncidenl Invesligolion
EB 700D (CAMERON SHEARTNG DS BLTND RAMS) EB 701 D ( Recommended Torque GradeB-7CapScrews) for EB 702D (Shearing Capabilities Cameron of Shear Rams) i EB 707c (FA|LcLosE AND FA|LopEN coNTRoLS FoR GATEVALVES) E8722 c (BoP Fluid(1989)) LtNEQUTCK-DTSCONNECT COUpLtNGS) i EB72s C (PTLOT
E8729 C (INSPECTION AND SERVICINGMODULARBOP CONTROLPOD STINGERS)
D Storage T & TL BOPsEquipped of with"ST"and "Ram"Locks) i fA ASO (Long-Term C Retractable Connector placement) seal i fS ASZ (%"Double
'
'.=F.B--9.:9""-9!.r':9]l'9"?iT'r*:j?:-|.ruy-U..]l-o-?.:
I EB 859D (Rev. D1)fr'ariable BoreRam& FlexpackerSealing Hangoff) &
; EB 861 C WForm (CeramicSeal PlatesCameronPod) OF i EB 862 D ( SHEARINGCAPABILITY THE CAMERON7-1t16") EB 864 D (Recommended FlangeBoll Torques)
t-4
l_:
CONFIDENTIAL
TRN-tNV-03353734
HORIZON DEEPWATER
IronsoceonInlernollncidenl lnvestigolion
Testing) SystemSurface EB 865 G (Deadman/AMF BOPS) OF STORAGE D & DL ANNULAR EB 868 D (LONG-TERM for Operation) System Recommendations the Efficient EB 870 D Rev.81 ( BOPControl Shear RamBonnets) 15M EB 874D withForm(18-314" TL BOPSuper Pins) ShearRamRetainer EB 875D (18%" 15MTL BOPSuper 10M EB 876D (18-314" TL BOPDVSShearRamTopSeals)
EB 882 D ( Choke and Kill ManifoldSystems )
Preventer) 18/o"15MPSIUllBlowout EB 885D (Rev. A01)(Cameron Maintenance BOP's) of EB 886 D Rev01 ( Preventive lnspection Air Purging) and EB 890 D (Periodic Replacement) EB 891 D (AMF/Dead Battery (18-314" BOPGaske) i EB A950001 (Lubrication Subsea H-4Connectors) of I EB A960007 Studded Top 10 & 15KH-4Connectors) i EB H022(18-314" Gasket) Vgx-2,& VT-2(2nd)Generation Wellhead of i EB H032202(VX-2, ( I EB H970002 SocketHeadCap ScrewUsagein MaineEnvironments) (H-4 Excluder ring) Connector I fA HSSOZS0 Wellhead D i EB-209 RevG2 (CupTester) (Life)Test) ER 2768(Deadman Battery Longevity I FSA4033322(H-4TestStumpHandling Lifting & HoleThreadProteclors) (VX-2Gaskets) i FSAA070008 protection (H-4 H051195Hydrates Wellhead connector hydrate recommendations)
(Eliminationof CriticalSolenoidValve HQS_OPS_ADV_435_026_Single_point_failureRev2 i SinglePointFailures)
,I_9:-_ol_9_l1l?9_t-T-g:1Tr11T9,I3ter"_-!le_91.:3-11e,::
l I (FUNCTION TESTS FORSUBSEA BoP ) , nOS-OpS-ADV-07
(CameronSuperShear Rams) HQS-OPS-ADV-401-005 (Cameron Rams with ST-Locks) HQS-OPS-ADV-401-006
(Cameron %" 10KColletConnectors) HQS-OPS-ADV-405-002 18 (Cameron HQS-OPS-ADV-405-003 TypeColletConnectors) (Enhancement Corrosion HQS-OPS-ADV-405-004 for Resistance )
HQS-OPS-ADV-41 3-003 (lmplementation "Stuck Button"Alarm) of
CONFIDENTIAL
TRN-lNV-03353735
DEEPWATER HORIZON
Ironsoceonlnlemol IncidentInvesligofion
HQS-OPS-ADV-434-001 FluidConcentration (BOP Erro/') HQS-OPS-ADV-435-026 (Elimination Critical of Solenoid ValveSinglePointFailures) HQS-OPS-ADV-435-028 (Subsea Transducer Modutes (STM) Transducer/Battery Modules) and Subsea
(BOP HQS-OPS-ADV-976-007 ControlSystemSolenoid Vent) HQS-OPS-ADV-BOPR-01 0 (Cameron LockProblems) ST HQS-OPS-AL-05 EQU|PMENT OPERAT|ON) WELL CONTROL (lnspection Cameron HOS-OPS-EAL-401-04 of ShearRamBlocks)
HQS-OPS-EAL-41 3-01-Rev1(BOP CONTROL PANEL)
HQS-OPS-E (M AL-444-001 UX Connector iluresoperating procid res) Fa u HQS-OPS-EAL-BOPR-005 (Reduced Fatigue Of Packer BOPRam) Life For
I
locTgl.*_
._______
I I I I I I I I '--------*"""'i i
I
i
(INSTRUCTIONS REBUILDING FOR CAMERON CONTROLS i HQS-oPS-TlB-435-01Revl , ] SOLENOID VALVE) i (Cameron Solenoid lnternal Pressure Test) I HQS-OPS-T|B-435-02 (BOP I HQS-OPS-T|B-BOPU-001 Controlsystem BallValve Failures) (Blow (BOP) I HQS-OPS-TIB-BOTS-001 Out Preventer TestStumps) (Subsea HQS-SS-2001-002 BOPMUXTraining Requirements)
OnnO nnt / ^i^-^ h ^-l -2003-003-modems^ i - ^ . . ^ ^usedand^ ^ r ^ all. upgraded) ( pods^ i l . ^ ^ - ^ r ^ r \ beingi I , JQS-SS-ADV -2003-004 (software) HQS-SS-ADV r UnO OC AnU
i , : i
(HC piston) Connector's acluator , HOS-SS-ADV-2001-001 Collet (Subsea HQS-SS-ADV-2001-004 Survey) Equipment (Cathodic HOS-SS-ADV-2001-010 Protection Markll Pods) for
(REPLACESEAT MATERIALIN NEEDLEVALVE) HQS-SS-ADV-2001-011
l-,I
CONFIDENTIAL
TRN-tNV-03353736
HORIZON DEEPWATER
ion IronsoceonInternollncident Investigof
(Heat Panels) HQS-SS-ADV-2001-012 in BOPControl Sofiware) 3 (EventLogger HQS-SS-ADV-2001-01 (Cameron of Pressure VesselModifications Test& PurgePorts) HQS-SS-ADV-2002-001 (Cameron: Pressure Transducers) HQS-SS-ADV-2002-002 (Cameron: System Requirements FluidMixing BOPControl HQS-SS-ADV-2002-003 ) (Ordering MUXCables) HQS-SS-ADV-2002-004
(ShuttleValve Approval) HQS-SS-ADV-2002-006
(Panel / HQS-SS-ADV-2002-0O7 PowerDown PowerUp Indications) (Cameron PODs- %" SlideValveSpringReplacement) HQS-SS-ADV-2002-008 Removal) Control PodSEMShroud HQS-SS-ADV-2002-01 0 (Cameron (Cameron Control Pod5K SlideValves) i HOS-SS-ADV-2002-011 (Cameron RodReplacements) Markl& Markll PodCylinderTie HOS-SS-ADV-2002-012 (Cameron MUXControls Self-Audit) i HOS-SS-ADV-2002-019 (Use FPRReporting Cameron for Controls Equipment)i I HOS-SS-ADV-2002-14 of Cameron (E-Connector i HOS-SS-ADV-2003-001 )
_-_i-*_
(Corrosion Resistant SealPlates Cameron For PodValves) i HOS-SS-AOV-2003-005 (Cameron HQS-SS-ADV-2003-008 MUXControls PLC's) (PEP HQS-SS-ADV-2003-009 digital Boards) out
(Cameron OPT-ADV-435-003 Regulator Upgrade Orifice Addition) (Cameron Controls Monitoring OLM's) of i OPT-ADV-435-012 (Cameron OPT-ADV-435-021 MUX24VDC System Protection Coordination) &
(Cameron ControlsMark | & Mark ll, STM and STBM Modifications) OPT-ADV-435-022 I
I t!
!,'..-^.*.-.---'-.-..-'^*'..."',.-....,.*,--]'|-I-:
I
l
1'\DT
EAI
AAE
A4
/QI
IAQEA
D,1D
A'^\NITD.\I
Q\
i
la
i !
,----: i
)P1-EAL-447-01 lockIncident (ST caused incorrect by design the hydraulic of system) (BOP oPT-EAL-994-01 FLUIDCARE insrructions)
CONFIDENTIAL
TRN-tNV-03353737
DEEPWATER HORIZON
Ironsoceon Inlernol Incident Investigolion
(BOPFluidContamination) OPT-EAL-994-02 (Fuses Subsea PA #006024 ln Architecture) panets) (Cooling for Driiler's Kits Controt i PA #006044 (ST-Lock PA #006104 BrakeHub) (ST-Lock PA #006124 Overhauling Nut) PA #1005(8 %'5/10,000 TL BOPVariable psi BoreRamAssembty) PAffi2A22(Atlas Cylinder Rods) Tie (Bearing PA#1204 Overhauling ST-Lock) Nut, PA #1602(Shuttle Valves) (LMRP WELLHEAD PA #18020 & CONNECTOR FUNCTTON LOCKOUT) (Deepwater PA #1802036 Connectors) (18 PA #1802058 y1" NOMTNAL WEAR BUSHTNG POTENT|AL BLOCKBOp RAM I TO cAVrTYl i (PodSubsea PA #18040 Electronic Module Power Supplies)
PA #20 (Hydraulic Bonnet BoltsTensioners Cameron for BOPHydraulic BonnetBolts) PA #35 (Cameron Falsified Compliance API Documents)
; PA #38 (Subseaactuatedgate valves)
;_l1troglse::el":_Y:Y:31_Tl9el5lg:T:tl1Il9lpn
I *AtO+(Super Shear Retainer Pin) (Ramassembly Optional Ram-01-03 WearPads) (18 TL i SA-2072 %" 15,000 BOPwithRamLock) I
I !
( Damage RamBOPSealsFromInternal to Pressure) i i Tech_Hazard_Alertl (MuxCable Connector lssues) i T010065 i -*_**_*,] ;*___**-**._*_-:*--"** i Rev2 Procedure Connectors) for I X_2341O2_01 (Handling I (Handling X-065438-39 Procedure. Dry Mateable SubseaConnections SeaconMSS , I j i Series) I
r---'*-
"-
ea-t6,rn t'le 3/-n q, nnn/{n n n n TL BOP with D a m r n a L \ r -A-252O(18 %" 5,000/10,000r a a \ D r r r i + h Ramlock)
CONFIDENTIAL
TRN-tNV-03353738
HORIZON DEEPWATER
Tronsoceon
Incidenl Investigoiion
oF Summanv lNVEsrlGATroN
Of the 248 alerts that rvere located78 rverecomplete,43 do not apply to the Horizon, ll2 rverefor information purposes, were not done, I is post Horizon incident and thereare 9 that can not find if done. 3
4 4.1
FrHorNes CoNctusroNs AND toilureslDireclCouses that Of the 9 tlr,at not find if doneandthe 3 thatwerenot donethereare4 alerts couldhavehadan effecton the can operation theBOPduring theHorizonincident of
4.2
ConfdbuloryFoclors/UndedyingCouses Organizalional People Not all Transocean aremandatory decisiott actis left up to therig. the to alerts
Environmenlal Technical the decisionto act is left up to the rig. All alerts shouldbe Not all Transocean alerts are mandatory reviewedby Transocean Engineeringand the decision to act or not act should be made at a level above manger. operations
4.3
Fleet wide
high
CONFIDENTIAL
TRN-tNV-03353739