FDL 10N 50 TD - Opr - Ver2
FDL 10N 50 TD - Opr - Ver2
FDL 10N 50 TD - Opr - Ver2
Freeze Dryer
FDL (-55℃)Series
(Please read the operation manual carefully before operating the machine)
Contents
Ⅰ Summary ........................................................................... 1
1, Production Information .......................................................... 1
2, Product Characteristics: ......................................................... 2
3, Working Conditions ............................................................... 3
4, Product Specification: ............................................................ 3
Ⅱ Installation......................................................................... 4
Ⅲ Operation .......................................................................... 5
1, The operation of control panel ............................................... 6
2, The freeze drying operation ................................................. 10
3, Operation for freeze drying .................................................. 12
Ⅳ Notices ............................................................................. 16
Ⅴ Common breakdown and elimination ................................ 17
Ⅵ Packing list ........................................................................ 19
Ⅶ Guarantee and maintain ................................................... 19
Ⅰ Summary
1, Production Information
technique for pre-freezing the watery material first, then make moisture
lyophilized goods can resume the original status when water them. So
Top- press type: Pre-freezing and drying the material in the bottle, then
fasten down the bottle cap by manual under the vacuum condition after the
with freeze drying cover by rubber valve after pre-frozen. The customer can
change different type special bottles any time during freeze drying process
together, and 8 different capacity bottles can be hang together also, which is
1
high drying efficiency.
Manifold and top-press type: The freeze drying cover can hang special
2, Product Characteristics:
fast cooling speed, and temperature cold trap during operation, which
function.
③ The control system can store the freeze drying data automatic, it can
clear to observe the samples and the whole process of freeze drying
operation.
2
with low noise also.
⑦Pre-freeze function: the customer can keep the stainless steel plate
with samples on the pre-freezing rack, then put the pre-freezing rack
into cold trap with thermo insulation tap, then begin to pre-freeze.
3, Working Conditions
interference.
②Storage conditions:
4, Product Specification:
Model FDL-10N-50-BAFDL-10N-50-8MFDL-10N-50-TDFDL-10N-50-TD-MM
3
Tray Layer 4 3 4 3
Tray specification
200×20 200×20 200×20 200×20
(ϕ×h)mm
Drying time(h) 24
Manifold / / 8 8
External dimension
582×625×530
(W×D×H)mm
Ⅱ Installation
Diagrammatic Sketch
pressure tube, the both side of vacuum tube will be used standard hoop,
there is one rubber sealing ring in side of each hoop, it should put amount
4
of vacuum grease on sealing ring before fasten the hoop.
②there is one main power socket on the back of host machine, one
end of the power line should be put in this main power socket, another end
of power line should be connected with the electric power socket. There is
another power socket on back side of host machine which is for vacuum
pump, the power line of vacuum pump should be connected with this power
socket.
③Please read the vacuum pump manual carefully and check the
vacuum pump well before operation, to confirm that the pump oil has been
added inside of pump. Don’t operate the vacuum pump without oil, the oil
line must not be lower than the oil mirror middle line.
④The “O” sealing ring on side of cold trap should be kept clean, put a
Ⅲ Operation
5
1, The operation of control panel
This machine adopts color LCD touch screen operation, large capacity
FAT32 file system to store all the data values for one month at least. USB
the panel can display the temperature of the sample, the cold trap
①Turn the main power switch on, the display panel shows the "Main
2)
6
5 4 8
2
7 6
display white color which means off (Picture 2), red color means
running (Picture 3)
7
3 - Run time: recording the running time of the refrigeration system
6 - Page key touch: touch the arrow keys, can view real-time state for
several hours, the curve and the curve of the historical data.
7 - The button for current data curve and historical curve conversion:
touch the button, can check freeze-drying curve in last month, the
8 - State transition button: touch this key can display current and
historical curve.
1
Picture 4: History Data Screen
1 - USB disk interface: Put the USB disk into this interface, the
the data within a month for view and storage of the data.
3 - USB disk storage button: put the USB disk connection well,
choose the data, touch USB disk storage button, the data will be
Put the samples on the trays, then put the samples and the trays in
the racks, then put the temperature sensor on the tray, then put the
rack with samples into cold trap, keep the insulation lid on the
cold trap to begin the pre-freezing, it should keep some time after
②Sample pre-freezing:
A, Turn on the main power switch, the display panel will show
picture 1.
C, Take the racks out together with the samples after the samples
completely frozen.
A, Take the freeze-drying rack out from the cold trap, then put the
supporter plate on the cold trap port, then place the freeze-drying
rack on the supporter plate (Standard type and manifold type can
samples on the drying rack, then put the drying rack on the cold
10
trap directly (Top
press type and manifold top press type can refer to
pump begin to run. The vacuum degree in the display panel will
Note: the lower end of the drying cabinet must touch well with
touch "Vacuum Meter" to switch off the vacuum meter, then loosen
the drainage and inflation valve, touch the "Vacuum Pump" button
B, Remove the drying cabinet which is acrylic glass cover, take out
the sample trays from freeze drying rack, then do package for
power.
C, Clean the cold trap with soft cloth, and clean sample plates and
D, Cover the vent hole when the vacuum pump does not work to
Loosen the drainage nad inflation valve, the water will be out after
the ice melt into water in the cold trap, then using a container to
Note: Please observe and confirm the water in the cold trap is
①Put the samples on the trays, then put the samples and the trays in
the racks, then put the temperature sensor on the tray, then put the rack with
12
samples into cold trap, keep the insulation lid on the cold trap to begin the
pre-freezing, it should keep some time after the samples are frozen.
②Take the freeze-drying rack out from the cold trap, then put the
supporter plate on the cold trap port, then place the freeze-drying rack on
the supporter plate. Put the sensor into the sample tray, then put the drying
button, the screen display the vacuum degree 110KPa, then touch the
"vacuum Pump" button, vacuum pump begin to run. The vacuum degree in
the display panel will begin to decline rapidly, The drying officially start
④Check the sample curve and visual sample is completely dry, touch
"Vacuum Meter" to switch off the vacuum meter, then loosen the drainage
and inflation valve, touch the "Vacuum Pump" button to switch off the
vacuum pump.
⑤Remove the drying cabinet which is acrylic glass cover, take out the
sample trays from freeze drying rack, then do package for drying samples.
①Put the samples into penicillin bottle, then put the bottles on the
13
trays, put the bottles and the trays in the racks, then put the temperature
sensor on the tray, then put the rack with samples into cold trap, keep the
insulation lid on the cold trap to begin the pre-freezing, it should keep some
②Take the freeze rack out from the cold trap, take the penicillin
bottles trays from the freeze rack, and put the trays and bottles into drying
racks, then put the drying rack on the cold trap port, Put the sensor into the
sample tray, then put the drying cabinet cover up the drying rack.
button, the screen display the vacuum degree 110KPa, then touch the
"vacuum Pump" button, vacuum pump begin to run. The vacuum degree in
the display panel will begin to decline rapidly, The drying officially start
④Check the sample curve and visual sample is completely dry, Turn
the handle which is above the organic glass cover, make the screw rotation
to drive trays down one by one, the bottle caps will be pressed into the
bottle, achieve vacuum closures. Touch "Vacuum Meter" to switch off the
vacuum meter, then loosen the drainage and inflation valve, touch the
⑤Remove the drying cabinet which is acrylic glass cover, take out the
14
sample trays from freeze drying rack, then do package for penicillin bottles.
①Put the sample into the lyophilized bottles selected, then put the
lyophilized bottles into one deep freezer (less than -40 ℃), keep the sample
the drying bottle edge rotation if possible, so that uniform samples of frozen
②Take the freeze-drying rack out from the cold trap, then put the
supporter plate on the cold trap port, then place the freeze-drying rack on
the supporter plate. Put the sensor into the sample tray, then put the drying
③Take out the lyophilized bottles from the deep freezer, and connect
the lyophilized bottles with the drying cabinet through the switch valve, put
the valve into the lyophilized bottle center, turn round the valve wing to
keep it vertical down, then the lyophilized bottle is connected with the
drying cabinet.
button, the screen display the vacuum degree 110KPa, then touch the
"vacuum Pump" button, vacuum pump begin to run. The vacuum degree in
15
the display panel will begin to decline rapidly, The drying officially start
when vacuum degree is less than 10Pa. If the lyophilized bottle is required
to replace during drying operation or take off the lyophilized bottle after
drying operation, please turn round the switch valve and keep valve swing
atmosphere, the bottle is inflation with air at the same time, drying cabinet
⑤if the samples drying finished, take off the lyophilized bottles first,
then do air inflation, swtich off the vacuum meter and vacuum pump,
remove the drying cabinet and do samples package. Do not take off the
Ⅳ Notices
maintain certain height difference with the host machine, which can
prevent oil back to pump in case of power off. It should loosen the
16
drainage and inflation valve and inflate the air into the host machine if
the power is off suddenly, and take out the samples as soon as possible,
③When shut down the machine, please inflate the host machine, then
switch off the vacuum pump in order to prevent the oil back to pump.
machine by “O” sealing ring, please confirm the “O” sealing ring clean.
⑤The user socket should be earthed. Don't clean the organic glass
cover and “O” sealing ring by organic solvent, Pay attention to the
contact surface of the organic glass cover and “O” sealing ring to avoid
working 200 hours, confirm maintain the host machine and vacuum
17
Check the connection between vacuum pump and host
1
machine, check the hoop is correct connection or not.
Check the bottom of organic glass cover is clean and
2
damage or not.
The vacuum
Check the “O” sealing ring is clean and damage or
3 degree can’t be less
not, the place of the “O” sealing ring is right or not.
than 15Pa
Check the vacuum pump work or not, the oil of pump
4
is clean or not
No power for host Check power fuse whether burn out, change new fuse
11
machine if the fuse burn out
18
Ⅵ Packing list
19
unmistakable, send the repair card by return to company sales department in
order to enter company technique service record, provide service for you
20
.
Conformity Certificate
Name: Freeze Dryer
Checker:
Date: