Seal Installation Procedure


Mechanical seal is a precision engineering product.
Its satisfactory performance and life depends upon , to a great extent ,
maintaining the pumps in the good condition.

Time spent in checking the equipment prior to seal installation


has proved to be a sound maintenance practice to prevent
premature seal failures and to keep maintenance expenses at
the minimum.

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Prepared by Neeraj Patade

Seal Installation Procedure

TYPICAL BACK PULL OUT PUMP


Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

HORIZONTAL SPLIT CASING PUMP


Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Prepared by Neeraj Patade

Seal Installation Procedure

RADIAL SPLIT MULTISTAGE PUMP


Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Prepared by Neeraj Patade

Seal Installation Procedure

BARREL CASING MULTISTAGE PUMP

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Prepared by Neeraj Patade

Seal Installation Procedure

TYPICAL CENTRIFUGAL PUMP

1. SUCTION
2. IMPELLER
3. DISCHARGE
4. STUFFING BOX
5. SHAFT
6. GLAND PACKINGS
7. GLAND PUSHER
8. BRGS. & HOUSING

AREA TO BE SEALED

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Shaft Packing Seal ring Seat / Mating Ring

Gland
Compression Unit

Shaft

Stuffing box

Compression Packing Replaced with Mechanical Seal


Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Check Points before Mechanical Seal


installation:

Process Checks
Equipment Checks

¾ D i m e n s i o n a l C h e c k s

¾ C o n d i t i o n C h e c k s

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
The following Actual Process Parameters must be cross
Checked with the data mentioned in the Drawing
before seal installation.

„ Suction Pressure
„ Discharge Pressure
„ Vapour Pressure
„ Temperature
„ Viscosity
„ Specific gravity
„ Nature of the liquid
„ Slurry Content
„ pH value
„ RPM

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
EQUIPMENT CHECK:

The majority of the pump manufacturers incorporate a sound


Engineering features while manufacturing the pumps.

The Pumps are made enough rouged and of dependable design to ensure a
long trouble free life.

But still it is recommended to check the following condition of the


equipment prior to seal installation.

„ Dimension Checks

„ Condition Checks (mechanical parameters)


Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
„ All of the following dimensions needs to be cross checked with
the dimensions mentioned on the GA drawing.

™ Stuffing Box face condition


EQUIPMENT CHECK

™ Stuffing box depth

™ Stuffing box bore diameter

™ Stuffing box gland piloting ID or OD

™ Shaft diameter

™ Shaft step OD at impeller end & Shaft Key dimensions for hook sleeve design.

™ Sleeve total length and shaft impeller step to end dimension.

™ No. of gland bolts ,size ,their orientation and projection.

™ Throat bush ID

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Dimension Checks

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
To understand the worthiness of the equipment and to ensure sound
performance of equipment fitted with a mech. Seal, following checks are
Equipment condition Checks

mandatory:

¾ SHAFT RUN OUT

¾ SHAFT AXIAL FLOAT

¾ SHAFT RADIAL LIFT

¾ STUFFING BOX SQUARNESS

¾ STUFING BOX CONCENTRICITY

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Shaft run out

THE SHAFT RUNOUT SHOULD NOT EXCEED MORE THAN 0.08 MM TIR MAX.

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Shaft Axial Float / End play

THE FLOAT SHOULD BE BETWEEN 0.02 MM TO 0.12 MM TIR MAX.

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Shaft Radial Lift or Whip

THE SHAFT WHIP SHOULD BE BETWEEN 0.05 MM TO 0.08 MM TIR MAX.

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Stuffing box Squreness

THE SQUARNESS SHOULD NOT EXCEED MORE THAN 0.12 MM TIR MAX.

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Stuffing box Concentricity

THE CONCENTRICITY SHOULD NOT EXCEED MORE THAN 0.08 MM TIR MAX.

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Minimum Stuffing box bore requirement

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Prepared by Neeraj Patade

AGITATOR ASSEMBLY

Motor

Coupling
Gear Box

Mechanical Seal Lantern

Pad plate

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
CHECK POINTS IN AGITATOR ASSEMBLY

SQUARNESS
RUNOUT &
DEFLECTION
CONCENTRICITY

Run out, Squarness, Concentricity – The standard max.value is 0.08 mm, but
considering the special features of seals it can be up to 0.5 mm or as mentioned on
drawing.

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Problems due to improper Equipment conditions
EXCESS End Play
¾Shaft Sleeve fretting.
¾Over compression / Under compression of the seal.
¾Chattering or chipping of the Carbon face.

EXCESSIVE RADIAL LIFT/ WHIP & RUN OUT


¾Pump vibration.
¾Excessive wear of mating faces.
¾Wobbling of Seal faces
¾Throttle bush, throat bush & impeller wear ring seizing.

EXCESSIVE SQUARNESS
¾Face misalignment
¾Wobbling of Seal.
¾Drive pin wear.

EXCESSIVE CONCENTRICITY
¾Affects hydraulic loading of the seal faces.
¾Damage/ rubbing of mating ring on sleeve.
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Preparation for seal installation
¾Keep the area clean.

¾Remove all burrs and sharp edges from the shaft or sleeve including sharp edges
on keyways and threads.

¾Worn shaft or sleeves to be replaced.

¾Check the seal chamber / stuffing box bore and stuffing box face to ensure they
are clean and free from burrs.

¾Shaft and sleeve should be oiled lightly prior to seal installation to allow the seal
parts to move freely.

NO OIL SHOULD BE USED FOR EPR O RINGS.

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Preparation for seal installation

¾Do not use HAMMER.

¾Open the seal packets just before seal installation.

¾Keep the hands clean.

¾Use soft tissue paper for cleaning seal components.

¾Wipe the seal faces and apply clean oil film.

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Seal Operating length Setting - MARK THE REFERENCE LINE

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Seal Operating length Setting - MEASURE THE DISTANCE OF MARK FROM THE SHAFT STEP

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Seal Operating length Setting - FOR INSIDE MOUNTED SEAL WITH RAISED MATING RING

SETTING LENGTH

OL A
REF. MARK

SETTING LENGTH= (REF.MARK - A) – Operating Length


Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Seal Operating length Setting - FOR INSIDE MOUNTED SEAL WITH RECESSES MATING RING

SETTING LENGTH

OL A
REF. MARK

SETTING LENGTH= (REF.MARK + A) – Operating Length


Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Seal Operating length Setting - FOR OUTSIDE MOUNTED SEAL
SETTING LENGTH

A OL
REF. MARK

SETTING LENGTH= (REF.MARK + A) + Operating Length


Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Installation of Cartridge seal

Cartridge seal

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Corporate Training Department

Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August

You might also like