1. SUCTION
2. IMPELLER
3. DISCHARGE
4. STUFFING BOX
5. SHAFT
6. GLAND PACKINGS
7. GLAND PUSHER
8. BRGS. & HOUSING
AREA TO BE SEALED
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Shaft Packing Seal ring Seat / Mating Ring
Gland
Compression Unit
Shaft
Stuffing box
Process Checks
Equipment Checks
¾ D i m e n s i o n a l C h e c k s
¾ C o n d i t i o n C h e c k s
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
The following Actual Process Parameters must be cross
Checked with the data mentioned in the Drawing
before seal installation.
Suction Pressure
Discharge Pressure
Vapour Pressure
Temperature
Viscosity
Specific gravity
Nature of the liquid
Slurry Content
pH value
RPM
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
EQUIPMENT CHECK:
The Pumps are made enough rouged and of dependable design to ensure a
long trouble free life.
Dimension Checks
Shaft diameter
Shaft step OD at impeller end & Shaft Key dimensions for hook sleeve design.
Throat bush ID
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Dimension Checks
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
To understand the worthiness of the equipment and to ensure sound
performance of equipment fitted with a mech. Seal, following checks are
Equipment condition Checks
mandatory:
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
THE SHAFT RUNOUT SHOULD NOT EXCEED MORE THAN 0.08 MM TIR MAX.
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
THE SQUARNESS SHOULD NOT EXCEED MORE THAN 0.12 MM TIR MAX.
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
THE CONCENTRICITY SHOULD NOT EXCEED MORE THAN 0.08 MM TIR MAX.
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Minimum Stuffing box bore requirement
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Prepared by Neeraj Patade
AGITATOR ASSEMBLY
Motor
Coupling
Gear Box
Pad plate
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
CHECK POINTS IN AGITATOR ASSEMBLY
SQUARNESS
RUNOUT &
DEFLECTION
CONCENTRICITY
Run out, Squarness, Concentricity – The standard max.value is 0.08 mm, but
considering the special features of seals it can be up to 0.5 mm or as mentioned on
drawing.
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Problems due to improper Equipment conditions
EXCESS End Play
¾Shaft Sleeve fretting.
¾Over compression / Under compression of the seal.
¾Chattering or chipping of the Carbon face.
EXCESSIVE SQUARNESS
¾Face misalignment
¾Wobbling of Seal.
¾Drive pin wear.
EXCESSIVE CONCENTRICITY
¾Affects hydraulic loading of the seal faces.
¾Damage/ rubbing of mating ring on sleeve.
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Preparation for seal installation
¾Keep the area clean.
¾Remove all burrs and sharp edges from the shaft or sleeve including sharp edges
on keyways and threads.
¾Check the seal chamber / stuffing box bore and stuffing box face to ensure they
are clean and free from burrs.
¾Shaft and sleeve should be oiled lightly prior to seal installation to allow the seal
parts to move freely.
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Preparation for seal installation
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Seal Operating length Setting - MARK THE REFERENCE LINE
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Seal Operating length Setting - MEASURE THE DISTANCE OF MARK FROM THE SHAFT STEP
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Seal Installation Procedure
Seal Operating length Setting - FOR INSIDE MOUNTED SEAL WITH RAISED MATING RING
SETTING LENGTH
OL A
REF. MARK
SETTING LENGTH
OL A
REF. MARK
A OL
REF. MARK
Cartridge seal
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August
Corporate Training Department
Corporate Training – EagleBurgmann India Prepared by : Surajjit Rayy © EagleBurgmann 2009 27th August