wellhead equipment

running procedures
for

PETROM OMV
WELLHEAD WITH TUBING HEAD
9-5/8" LCSG X 11" API 5K X 7" CSG X7-1/16"
API 5K-2.7/8"EU

Surface Wellhead Publication

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 1
This document alone does not qualify an individual to Install/Run the Equipment. This
document is created and provided as a reference for Qualified Cameron Service Personnel
and does not cover all scenarios that may occur.

© 2008 Cameron International Corporation. All rights reserved. This material is the copyrighted work of Cameron
International Corporation and may not be reproduced, displayed, modified or distributed without the express prior
written permission of the copyright holder.

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 2
Table of Contents
Bill of Materials ......................................................................5
Stage 1 — 9-5/8" Casing ....................................................... 7
Install the Casing Head ...................................................................................................................... 7
Stage 2 —7" Casing .............................................................. 8
Testing the BOP Stack ....................................................................................................................... 8
Running the Wear Bushing ................................................................................................................ 9
Running the Wear Bushing before drilling .......................................................................................... 9
Retrieving the Wear Bushing after drilling .......................................................................................... 9
Hang Off the Casing ......................................................................................................................... 10
Cut the Casing ........................................................................................................................... 11
Instal the Primary Seal SB ............................................................................................................... 11
Install the Tubing Spool .................................................................................................................... 12
Installation Procedure ...................................................................................................................... 12
Injection Gun Preparation ................................................................................................................ 13
Energize the P Seals ........................................................................................................................ 14
Test Between the Seals ................................................................................................................... 14
Test the Connection ......................................................................................................................... 15
Stage 3 —2-7/8" Tubing ......................................................16
Install the Tubing Hanger ................................................................................................................. 16
Torque Chart ........................................................................18
Torque Chart ........................................................................19
'N' Style Lockscrew Installation .........................................20
Operational Sequence ..................................................................................................................... 20
'N' Style Lockscrew Torque Chart......................................21

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 3
System Drawings
B12 B13

B14 B15 B16

7-1/16"X34.5MPa 2-1/16" x 34.5MPa


B10 B17 B7
31
B8

B9 B10
B11 B6
B4 B5 11"X34.5MPa

B2 B3 B1
A5 2-1/16" x 34.5MPa
A9
A7 A8 A10

A6 A13

A4 A12 A11
A3
A1 9.5/8"LC

A2 7"

2.7/8" EU

ST4

ST3

ST5
RP081364

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 4
Bill of Materials
SECTION A SECTION A SECTION B
CASING HEAD ASSEMBLY CASING HEAD ASSEMBLY TUBING SPOOL ASSEMBLY
Item Qty Description Item Qty Description Item Qty Description
A1 1 BODY CASING HEAD HOUS- B1 1 BODY, TUBING HEAD
ING, TYPE SB, 11 API 5000 A7 12 STUD, CONT THD 1.875-8 SPOOL, TYPE R,11 API 5K
TOP FLG, W/ 9-5/8 LC BTM X13.750 STL/A193 GR B7 / FLG R-54 BTMX 7-1/16 API
PREP, W/ 2 API LP OUTLETS, ANSI B16.5 ZN PL 5K FLG R-46 TOP,W/ TWO 2-
ALLOY, API 6A 19TH ED, YELCHROMATE /CC X- 1/16 API 5K SSO,W/ 7IN DBL
TEMP CLASS P MATL CLASS 004034-06 MAX. ‘P’ SEALS BTM
AA, BB, DD-NL, EE-NL, PSL2, POINTHEIGHT .12 INCH. PREP,ALLOY, API 6A 19TH
PR1 SPECIFIED LENGTHDOES ED,T/C P-V M/C
Part# 9C-1042707 NOT INCLUDE THE CHAM- AA,BB,DD,EE, PSL2, PR1
FER. OVERALLLENGTH Part# 2263014-05-21
A2 2 ASSEMBLY, FL MANUAL WILL BE LONGER.
GATE VALVE2-1/16 API Part# 702533-16-11-33 B2 4 PIPE PLUG HEX HD 1 NPTZN
5,000, 2" LINE PIPE PLATEDMAT’L WROUGHT
ENDS,ISO 10423 AND API 6A A8 24 NUT, HVY HEX 1.875-8 STL COMMERCIAL LOWMAT’L
19TH EDITION,TEMP CLASS ZN PL ANSIB18.2.2/A194 GR WROUGHT COMMERCIAL
P+U, MATERIALS CLASS 2H ZN PL CRMT/ASTM LOWSTRENGTH STEEL
AA,PSL 2, PR 2 B633CL 5 TYPE II IDENT & Part# 005930-05-10
Part# 141501-33-91-02 PKG PER DWG 2709000
Part# 2709000-17-01 B3 EMERGENCY EQUIPMENT
4 VALVE,CHECK,1-8NC-2
A3 2 BULL PLUG 2" LP W/1/2 NPT MALE THD, W/
X 3.750"LONG TEFLONSEAT,FOR TEST &
Part# 007481-01 A9 1 PRIMARY SEAL, TYPE SB, PACKING, PARTS.
11 IN x 7 IN,T/C P+U, M/C AA Part# M517988
A4 2 VALVE, NEEDLE 1/2 M/F NPT Part# 9C-1110030
10000 PSISTL A105 FOR H2S B4 2 SEAL TYPE ‘P’, 7" OD
SVCE A10 1 RING GASKET, API TYPE R- CSG,8.125" OD X 7.062" ID
Part# 705960 54 LOW CSTL OR SOFT NITRILE;API 6A 19TH EDI-
IRON -PLATED /API 6APSL TION; PSL-3
A5 2 STANDARD GAUGE, PRES- 4, API MONOGRAM, RE- Part# 142896-05-01-03
SURE 0-350bar(5000PSI / QUIRED
34.5MPa),1/2NPT MALE BTM Part# 702001-54-02 B5 4 USE UP Y50003-
CONNECTION,100mm DIA, 03800491THEN USE UP
PAINTED CASE,0-400bar Y50003-03800391
SCALING,WITHOUT FILLING A11 2 PLUG,BULL 2"LP 3-3/4 LG Part# 012471-02
(NOT ANTIVIBRATING),AISI Part# 006994-04
316 PRESSURE B6 2 FITTING, VENT STRAIGHT
ELEMENT,WORKING TEMP A12 2 NIPPLE 2 API LP THREADED 1/2 NPTSAFTY VENT, 4140
-40 TO 200 C DEG(API TEMP 180 MM LG NACE / ZN PLTUNGSTEN
RATING: P-X) Part# 9C-7000006 CARBIDE BALL, 10,000 PSI
Part# 9C-9180016-01 MAX
A13 1 NAMEPLATE FOR CASING Part# 2738068-02
A6 1 CASING HANGER, TYPE SB, HEAD HOUSING
11IN X 7IN, T/CP+U, M/C AA, Part# 9C-10400019 B7 2 ASSEMBLY, FL MANUAL
PSL 2, PR 1 GATE VALVE,2-1/16 API
Part# 9C-1100200 5,000 FLG, ISO 10423
ANDAPI 6A 19TH EDITION,
TEMP CLASS
P+U,MATERIALS CLASS
DD-NL, PSL 2, PR 2
Part# 141501-31-94-02

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 5
Bill of Materials
SECTION B SECTION B SECTION C
TUBING SPOOL ASSEMBLY TUBING SPOOL ASSEMBLY SERVICE TOOLS
Item Qty Description Item Qty Description Item Qty Description

B8 2 FLANGE COMPANION, 2- B14 1 RING GASKET, API TYPE ST1 1 WINGED WRENCH, FOR
1/16 IN API 5000,W/ 2 LP R-46 LOW CSTL OR SOFT THREAD MALE PROTEC-
THD, ALLOY, API 6A IRON -PLATED /API 6APSL TORS, T/C P, ALL M/C
19THEDITION, T/C L-U, M/ 4, API MONOGRAM, RE- Part# 9C-116009108
C AA, BB, DD, EE,PSL2 QUIRED P a r t #
Part# 9C-10700332 702001-46-02 ST2 1 WRENCH, TYPE T, FOR
TYPE R TUBINGHANGER
B9 16 STUD, CONT THD .875-9 X B15 1 RETAINER THREADED FIXING NUT,WELDED, CS
6.000 STL /A193GR B7 / RING FOR PARTS, T/C P, M/C AA
ANSI B16.5 ZN PL TUBINGHANGER TYPE R Part# 9C-122000102
YELCHROMATE /CC X-
0 0 4 0 3 4 - 0 6 . Part# 9C-109005503 ST3 1 ASSY, DRILLING
SPECIFIEDLENGTH DOES ADAPTER, F/ TYPE SB,
NOT INCLUDE THE B16 1 ASSY TUBING HANGER 11API 5K FLANGE TOP
Part# 702533-08-10-60 TYPE R, 2-7/8 EU TBGBOX AND BTM,W/TWO
TOP AND BTM THREAD, LOCKDOWN SCREWS, API
B10 48 NUT, HVY HEX .875-9 STL WITH 2-1/2 BPV THREAD 6A 19THEDITION, T/C P, M/
ZN PL ANSIB18.2.2/A194 PREP, W/O BACK C AA,BB,DD,EE,PSL2
GR 2H ZN PL CRMT/ASTM PRESSUREVALVE, EX- Part# 2263052-24-21
B633CL 5 TYPE II IDENT & TENDED NECK, API 6A
PKG PER DWG 2709000 19THEDITION, TEMP ST4 1 ASSY, COMBINATION
Part# 2709000-09-01 CLASS: P, MATL CLASS: TOOL, F/ TYPE SB, F/11 IN
DD,PSL2, PR1 FLANGES, W/ 4-1/2 IF
B11 4 RING GASKET, API TYPE Part# 2263056-08-21 (NC50)BOX DRILL PIPE
R-24 LOW CSTL OR SOFT THREAD BTM AND TOP,
IRON -PLATED /API 6APSL B17 16 STUD, DBL ENDED .875- W/ 4PINS AND SOCKET
4, API MONOGRAM, RE- 9UNC-2A X4.00" LG A193/ HEAD CAP SCREWS,W/
QUIRED GR B7 /ZN PL DOVETAIL SEAL RI NG, API
Part# 702001-24-02 Part# 219065-09-04-01 6A 19THEDITION
Part# 2263065-06
B12 12 STUD, CONT THD 1.375-8 B18 1 NAMEPLATE FOR TUBING
X10.750 STL/A193 GR B7 / HEAD SPOOL ST5 1 WELDMENT, WEAR BUSH-
ANSI B16.5 ZN PL Part# 9C-13500019 ING, 11IN TYPE SB,W/ 4 J
YELCHROMATE /CC X- SLOTS AND WELDED
004034-06 MAX. B16* 1 PIN PROTECTOR, TYPE STOPLUGS, API 6A 19TH
POINTHEIGHT .12 INCH. PA-S CENL,TO FIT INTO A EDITION
SPECIFIED LENGTHDOES 2-7/8EU BOX THD W/ STD Part# 2263066-05
NOT INCLUDE THE CHAM- OD,MATL HDPE (HIGH
FER. OVERALLLENGTH D E N S I T Y
WILL BE LONGER. POLYETHYLENE),IN COM-
Part# 702533-12-11-03 PLIANCE W/ API 5CT 8TH
ED
B13 24 NUT, HVY HEX 1.375-8 STL Part# 2263346-02-60
ZN PL ANSIB18.2.2/A194
GR 2H ZN PL CRMT/ASTM
B633CL 5 TYPE II IDENT &
PKG PER DWG 2709000
Part# 2709000-13-01

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 6
Stage 1 — 9-5/8" Casing
SAFETY NOTE: Always wear proper PPE (Personal Protective Equipment) such as safety shoes, safety
glasses, hard hat, gloves, etc. to handle and install equipment.

Install the Casing Head


1. Run the conductor to the required depth.

2. Determine the correct elevation for the Casing


Head.

3. Examine theCasing Head (Item A1). Verify the


following:
• ring groove and casing hanger seal area are
clean and undamaged
• threads are in clean and in good condition
• bore is free of grease and dirt
RP081365
• all peripheral equipment is intact and undam-
aged

4. Align the Casing Head above the casing.

5. Slowly lower the Casing Head onto the casing.

6. Level the Casing Head, rotate the head to the left


until thread jump is felt to align the threads.

7. Then to the right to the thread manufacturers rec-


ommended optimum torque.

RP081366

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 7
Stage 2 —7" Casing
Testing the BOP Stack WARNING:
COMBINATION TOOL Ensure the Elastomer is
CONFIGURATION down and Lift Lugs are Up
1. Install the Drilling Adapter (Item ST3) with the two
lockdown screws and ring gaskets with MARK "JOS" Lift lug for 1
2" NPT weep hole fitted with
wear bushing allen socket pipe plug
down on the Casing Head and make up the BOP stack to
the Drilling Adapter.
4-1/2" IF
Immediately after making up the BOP stack and periodically
during the drilling of the hole for the next casing string, the BOP
Dovetail seal
stack (connections and rams) must be tested.

2. Examine the Combination Tool (Item ST4). Verify the


following:
• elastomer dovetail seals are in place and in good
condition 1-1/4" LP, VR plug
(1-1/8" Hex.)
• 4 lift lugs and all pipe plugs are intact and in good
condition
• all threads are in good condition
4-1/2" IF
3. Orient the Combination Tool with elastomer down and lift
lugs up.
RP081367
4. Make up a joint of drill pipe to the Combination Tool then
lubricate the elastomer seals of the Combination Tool.

WARNING: Make sure the elastomer is down and the lift lugs LANDING JOINT
BOP STACK

are up.

TIEDOWN SCREWS
5. Open the outlet valve on the Casing Head RETRACTED

6. Slowly lower the Combination Tool through the BOP until


it lands on the tappered surface in the Casing Head.
DRILLING ADAPTER

7. Close the BOP rams on the drill pipe and test to 5,000 PSI COMBINATION TOOL

maximum.

8. Monitor the open outlet valve for signs of leakage.

9. After a satisfactory test is achieved, release pressure,


close the outlet valve and open the rams.

10. Remove as much fluid from the BOP stack as possible.

11. Retrieve the Test Plug slowly to avoid damage to the seal. RP081368
12. Repeat these steps as required during the drilling of the
hole.

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 8
Stage 2 —7" Casing
Running the Wear Bushing WARNING:
Elastomer is UP and Lift Lugs
are down
COMBINATION TOOL
WARNING: Always use a Wear Bushing while drilling to 4-1/2" IF
Thread
protect the load shoulder from damage by the drill bit or rotating 1-1/4" NPT
drill pipe. The Wear Bushing must be retrieved prior to running VALVE REMOVAL PLUG
the casing. (1-1/8"HEX.)

DOVETAIL SEAL

Running the Wear Bushing before drilling


1. Examine the Test Plug/Running Tool (Item ST1). Verify LIFT LUG FOR
WEAR BUSHING 4-1/2" IF
the following: Thread
• 4 lift lugs and all pipe plugs are intact and in good
condition
• all threads are in good condition SB WEAR BUSHING STOP LUG

2. Orient the Tool with the lift lugs down.

3. Make up a joint of drill pipe to the Tool.

4. Examine the Wear Bushing (Item ST2). Verify the Wear


Bushing is clean and undamaged. Orient the Wear Bush-
ing with the J-slots up.

WARNING: Make sure the lift lugs are down when latching
into the Wear Bushing.

RP081369
5. Lower the Tool into the Wear Bushing and rotate the
Bushing 1/4 turn counterclockwise.

6. Slowly lower the entire Tool/Wear Bushing Assembly


through the BOP until it lands on the load shoulder in the
Casing Head. Run in anti-rotating pins.

7. Remove the Tool from the Wear Bushing by rotating the LANDING JOINT

drill pipe counterclockwise to a positive stop and lifting


straight up. COMBINATION TOOL

8. Drill as required.

Retrieving the Wear Bushing after drilling BOP STACK

1. Make up the Tool to the drill pipe with the lift lugs down. TIEDOWN SCREWS

2. Slowly lower the Tool into the Wear Bushing.

3. Rotate the Tool clockwise until the drill pipe drops approxi-
mately 2". This indicates the lugs have aligned with the DRILLING ADAPTER
with MARK "JOS" down
Wear Bushing slots.

4. Slack off all weight to make sure the Tool is down and
rotate it clockwise 1/4 turn to fully engage the lugs in the
Wear Bushing. Retract the anti-rotation pins.

5. Slowly retrieve the Wear Bushing and remove it and the


Tool from the drill string.
RP081370

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 9
Stage 2 — 7" Casing
SAFETY NOTE: Always wear
proper PPE (Personal Protective CASING HANGER TYPE SB
Equipment) especially gloves to
handle and install the slip type
casing hanger
LIFTING EYEBOLT
NUT

Hang Off the Casing


SCREW BOLT
1. Run the 7" casing and cement as
SLIP
required. SEGMENT

WARNING: Ensure that the casing is


centralized. Hanger clearances are
small and centering must be accu-
rate. RP081371

2. Drain the BOP and Casing Head


bowl through its side outlet. Leave
the valve open until the Casing
Hanger is set.

3. There are two methods used to


install the Casing Hanger:
• from the rig floor through a
full opening BOP stack, pro-
vided no casing collars are SLIP
between the rig floor and the
Head
SUPPORT
• underneath the BOP stack,
provided the well is safe and BOARDS
under control. This option
allows the Hanger bowl to be
inspected and thoroughly
washed prior to the Hanger 7" RP081372
Installation.

4. Examine the Casing Hanger


6. Screw in the Lifting Eyebolts. lower the Hanger into the Casing
(ItemA6 ). Verify the following:
Head/Spool . Use a cat-line to cen-
7. Place two boards against the casing ter the casing, if necessary.
• bore and threads are clean to support the Hanger.
11. When the Hanger is down, pull ten-
and in good condition 8. Wrap the Hanger around the casing sion on the casing to the desired
• hinges and pins are in place and replace the Screw Bolt and the hanging weight (non-automatic
and undamaged Nut screwing it in until the space Hangers do not require a minimum
• slips are intact, clean, un- between the two slip segments is weight).
aprox. 0.3".
damaged
9. Grease the Casing Hanger body. NOTE: A sharp decrease on the weight
5. Remove the Nut and separate indicator will signify that the Hanger has
the Hanger Slip Segments. 10. Remove the boards, and carefully taken weight and at what point.

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 10
Stage 2 — 7" Casing
Cut the Casing
1. Rough cut the casing approximately
24" above the top flange and move 3/16"
the BOP and excess casing out of
the way.

2. Move the BOP, the drilling adapter


flange and excess casing out of the
1/8"x45
way.

NOTE: Always physically measure the Casing bevel


3/8"
exact cutoff height by measuring the bot-
tom bore of the next component to be Approximately 24"
installed and subtract 1/4" from this di-
mension, prior to making the final cutoff. FINAL CUT
3. Final cut the casing at the mea-
sured pocket depth (minus 1/4") ±1/8"
Pocket depth
above the top of the Casing Head/
Spool flange. Place a 3/8" x 3/16" less 1/4"±1/8"
bevel on the casing stub and remove
all burrs and sharp edges.

NOTE: The ID edge of the casing may be


ground slightly to allow drill pipe and RP081373
casing collars to pass smoothly.

4. Fill the void above the Casing Hanger


with clean oil to the top of the Casing
Head/Spool. PRIMARY SEAL TYPE SB
WARNING: DO NOT overfill the void. Oil
that becomes trapped under the ring gas- SEAL RING
ket will prevent formation of a positive
seal.
PRMIMARY SEAL
GASKET SB
Instal the Primary Seal SB

SEAL RING
Examine the Primary Seal SB (ItemA9). RP081374
Verify the following:
• Seal Rings are are clean and in
good condition
• Primary Seal Gasket is intact, 1. Place the lower Seal Ring
clean, undamaged
2. Place the Primary Seal Gasket and
press until it fits on profiled shape of
NOTE: The annulus valves of the Casing the ring.
Head must be oppened to eliminate the
air or liquid existing under the seal. 3. Place the upper Seal Ring.

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 11
Stage 2 — 7" Casing
Install the Tubing Spool TUBING SPOOL TYPE "R" 11" X7-1/16" - 5K

1. Examine the Tubing Spool (Item


B1). Verify the following:
7-1/16"X5K
• bore is clean and free of debris
• P seals are properly installed
and undamaged
• ring grooves and seal areas are
clean and undamaged
• peripheral equipment is intact
and undamaged

Installation Procedure
2. Lubricate the ID of the P seals and
the OD of the casing stub with light
oil or grease.

WARNING: Excessive oil or grease may


prevent a positive seal from forming. 11"X5K

3. Install a new Ring Gasket into the


ring groove of the Casing Head. RP081375
4. Lift and suspend the Spool over the
casing stub, ensuring it is level.

5. Carefully lower the Spool over the


casing stub until it lands on the ring
gasket.

WARNING: Do Not damage the 'P' seals


or their sealing ability will be impaired.

6. Install and tighten the appropriate


Studs and Nuts in alternating cross
manner to the recommended torque
referenced in SW2001-202.

RP081376

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 12
Stage 2 — 7" Casing
Injection Gun Preparation
7. Maintaining the Injection Gun at ambient temperatures, prepare Test Pump and Injection Gun for injecting P seals.

8. Operate Test Pump to nject fluid into Injection gun.

9. Monitor open end of Injection Pun for signs of plastic packing.

10. After plastic packing begins to flow from open end of Injection Gun continue to inject fluid from Test Pump increasing
pressure an additional 200 to 400 psi.

11. Stop pumping Test Pump and monitor plastic packing movement and pressure on the pressure gauge.

12. Once packing has stopped flowing and the pressure gauge has stabilized observe the reading on gauge and record
the pressure.

NOTE: The pressure recorded will become "0". This is the pressure required to move the plastic packing and is not included
in the actual injection pressure.

EXAMPLE: If the plastic packing begins to flow at 900 psi and the fluid pressure from the Test Pump is increased to 1200 psi,
after allowing the pressure to fall the plastic packing and needle on the pressure gauge cease to move at 850 psi, then 850
psi becomes "0". If the flange rating is 5000 psi and 80% of casing collapse exceeds 5000 psi then the final gauge reading
when the P seal is fully energized will be 5850 psi.

NOTE: The amount of pressure required to force plastic packing to flow from the Injection Gun is dependent on several factors
including outside temperature and the plastic injection gun itself. The example given above is for illustration purposes only.

Gauge Setup
To Wellhead

Injection Gun Test Hose


Test Pump

Pressure
Rises Operate Test
Plastic Packing Pump
Flows from Injection Gun

Pressure
Falls Stop
Plastic Packing Stops Pumping
Flowing from Injection Gun

RP020799

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 13
Stage 2 — 7" Casing
Energize the P Seals
13. Locate the four ports on the
Energize the 'P' Seals
bottom flange of the Casing Spool
for injecting plastic packing into the
P seals and remove the pipe plug
from one of the ports for the lower
seal.

14. Remove the pipe plug and check


valve from the opposite port for the
lower seal.
Remove
Remove
15. Install a plastic injection gun Fitting
Pipe Plug
and Inject
into the port which still contains the and Check Plastic
check valve and inject plastic until a Valve

continuous stream flows from the RP081377


empty port.

16. Reinstall the check valve and


the pipe plug into the empty port and
continue to inject plastic to the maxi- 18. Once the injection pressure has
mum rated working pressure of stabilized, carefully bleed off injec- 20. Repeat this procedure for the
the flanges or 80% of casing col- tion pressure and remove injection upper P seal.
lapse-whichever is less. gun.

17. Hold and monitor injection pres- 19. Replace the pipe plug into the
sure until it has stabilized. open port.

Test Between the Seals


21. Locate the two autoclave ports Seal Test
on the Spool lower flange.

22. Remove both fittings. Remove


Fitting
and Inject
23. Install a test pump to the port for Test Fluid
testing between the P seals and
inject test fluid to either the maxi-
mum rated working pressure of
the flanges or 80% of casing col- Remove
lapse-whichever is less. Fitting
and Monitor
24. Monitor the open flange test port
for signs of leakage.
RP081378
25. Hold and monitor test pressure
for fifteen minutes or as required by
Drilling Supervisor.

26. Once a satisfactory test is


achieved, carefully bleed off test
pressure and remove test pump.

NOTE: Do Not reinstall the fittings.

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 14
Stage 2 — 7" Casing
Test the Connection
30. Install a test pump to the port for Flange Test
testing the connection and inject test
fluid to either the maximum rated
working pressure of the flanges
or 80% of casing collapse-which-
ever is less.

31. Monitor the open port used to


test between the P seals.

32. Hold and monitor test pressure


Remove
for fifteen minutes or as required by Fitting
Drilling Supervisor. and Inject
Test Fluid
33. Once a satisfactory test is RP081379
achieved, carefully bleed off test
pressure and remove the test pump.

34. Reinstall both fittings.

NOTE: Not all injection and testing port


configurations are the same and should
be handled accordingly.

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 15
Stage 3 — 2-7/8" Tubing
Install the Tubing Hanger
1. Ensure the Valve Removal Plug is TUBING HANGER TYPE "R"
removed from the outlet on the Spool
and the flow line is properly con-
nected to the valve side of the Spool.

3. Run the tubing as required and space


out appropriately.

4. Examine the Tubing Hanger (Item


B16) . Verify the following: O-ring

• bore is clean and free of debris


2-7/8" EU
• threads are clean and undam- THD
aged
• O-rings of the Hanger are clean
and undamaged

5. Orient the Tubing Hanger down as


illustrated. RP081380

6. Make up the Hanger to the tubing to


the thread manufacturer's recom-
mended optimum torque.

7. Make up a landing Joint to the top of


the Hanger to the thread
manufacturer's recommended
shoulder torque. LANDING JOINT

8. Wipe the bowl of the spool with a


light oil.

WARNING: Excessive oil may prevent a


positive seal from forming.

TUBING HANGER

2-7/8 TUBING

RP081381

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 16
Stage 3 — 2-7/8" Tubing

9. Ensuring the well is safe and under


control with no fluid flow, slowly lower
the Hanger into the well until it lands
on the load shoulder of the Spool.

10. Place the Hanger in the bowl of the 7-1/16"X5K


Spool.

RP081382

11. Remove the landing joint from the top 7-1/16"X5K


of the hanger.

12. Screw in the Retaining threaded


ring (Item B15) using the Wrench
type T (Item ST2)

RP081383

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 17
Torque Chart

Recommended Torques in Foot Pounds for Flange


Bolting for 80K Studs
Bolt Threads Tension Torque Torque
Diameter Per Inch F F=0.07 F=0.13
(inches) (1/in) (lbf) (Ft lbf) (Ft lbf)

.500 13 5,676 27 45

.625 11 9,040 52 88

.750 10 13,378 90 153

.875 9 18,469 143 243

1.00 24,230 213 361

1.125 31,618 305 523

1.25 39,988 421 726

1.375 49,340 563 976

1.50 59,674 733 1278

1.625 8 70,989 934 1635

1.75 83,286 1,169 2,054

1.875 96,565 1,440 2,539

2.00 110,825 1,750 3,094

2.25 142,292 2,496 4,436

2.50 177,685 3,429 6,118

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 18
Torque Chart

Recommended Torques in Foot Pounds for Flange


Bolting for 105K Studs
Bolt Threads Tension Torque Torque
Diameter Per Inch F F=0.07 F=0.13
(inches) (1/in) (lbf) (Ft lbf) (Ft lbf)

.500 13 7,450 35 59

.625 11 11,865 68 115

.750 10 17,559 118 200

.875 9 24,241 188 319

1.00 31,802 279 474

1.125 41,499 401 686

1.25 52,484 553 953

1.375 64,759 739 1,281

1.50 78,322 962 1,677

1.625 8 93,173 1,226 2,146

1.75 109,313 1,534 2,696

1.875 126,741 1,890 3,332

2.00 145,458 2,297 4,061

2.25 186,758 3,276 5,822

2.50 233,212 4,500 8,030

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 19
'N' Style Lockscrew Installation
Operational Sequence
Recommended Gland
1. Ensure the well is safe and under control and the area of the lockscrew
is free of pressure. Nut Torque for N style
2. Loosen the Gland Nut only minimum amount. Lockscrew s
CAUTION Well bore pressure may exist inboard of lock screw packing.
Therefore, it is imperative to only relieve the gland the minimum amount Pressure Required
required to permit rotation of the lock srew for prevention pressure release
escape of well bore.
Rating Torque
3. Retighten the Gland Nut to approximately 50 ft/lbs
400 to 500
4. Run in and tighten all lockscrews in an alternating cross manner to the 2,000 psi
required torque listed in the Lockscrew torque charts.
ft lbs
5. Retighten the packing gland to the required torque listed in the
400 to 500
Recommended Gland Nut Torque for 'N' Style Lockscrew chart. 3,000 psi
ft lbs
500 to 600
5,000 psi
ft lbs
600 to 700
10,000 psi
ft lbs
800 to 1000
15,000 psi
ft lbs
1000 to 1300
20,000 psi
ft lbs

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 20
'N' Style Lockscrew Torque Chart
N Style Lockscrew N Style Lockscrew
Torque Values for
Torque Values for
Elastomer Seal Hangers
Elastomer Seal Hangers
Pressure Torque
Flange
Siz e
Rating Value Pressure Torque
(psi) (ft lbs) Flange
Rating Value
Siz e
(psi) (ft lbs)
10,000
4-1/16" 300
2000
15,000
250
2000 3000

3000 200
13-5/8" 5000
5000 400
7-1/16" 10,000
10,000
300
15,000 500
15,000

20,000 500 2000


250
2000 3000
250
16-3/4"
3000
5000
5000 350
9" 10,000
10,000 400
400
15,000 500
5000
18-3/4"
20,000 600 10,000

2000
20-3/4" 3000
250
3000 250
2000
11"" 5000 350

21-1/4" 5000 350


10,000
400
15,000 10,000 400

9-5/8" x 7" 5K RP-001511


SB Casing Head and R Tubing Spool Rev 01
Page 21
RP-001511 Revision History

Rev. Description Prepared by: Reviewed by: Date Released:

Initial Release per ZS 300620302


01 Gabriela Tudoran Doru Buzila Nov. 06, 2008
Romania Surface Systems Engineering

RP-001511 9-5/8" x 7" 5K


SB Casing Head and R Tubing Spool
Rev 01
Page 22