O/o Divisional Forest Officer,

Kuno Wildlife Division , Sheopur


(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

No. / Steno / 2024 / Sheopur , Date :

Notice Inviting E-Tender

The Divisional Forest Officer Kuno Wildlife Division, Sheopur invites the following e-tender.

Sr. No. Description of Goods EMD (₹) Cost of Tender Document (₹)

Providing, Supplying and


500 + Processing Fee
1 Installation of Solar and 5,00,000
(Determined automatically by portal)
related equipment

Interested bidders can view/download/purchase the bid document online from e-procurement
portal from 15.07.2024, 11:00 Hrs . Bidding process dates mentioned as critical dates on e-
procurement portal will be applicable. Corrigendum / Addendum in NIT, if any, would be
published on portal only and not in newspapers

e-procurement portal - https://mptenders.gov.in/

R. Thirukural
(I.F.S)
Divisional Forest Officer
Kuno Wildlife Division,
Sheopur

Save Environment, Save Trees


1
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

Important Dates / Information

Sr. no Information Details

1 Brief description Tender of rates to procure commonly used solar and related
equipments in Kuno Wildlife Division

2 NIT No.

3 Tender Fee / Cost of ₹ 500/- + Processing Fees (Determined automatically by portal)


Tender Document

4 Earnest Money Deposit ₹ 5,00,000/-

5 Bid Offer Validity 365 days from the date of issuing of work order to successful bidder
by Divisional Forest Officer Kuno Wildlife Division.

6 Performance Security Amount and duration shall be determined during issuance of work
order(s) through the contract period.

7 Estimated Tender Value ₹ 2,00,00,000/-

8 Date & Time of Pre Bid (Refer time schedule on portal)


Meeting

9 Last Date (deadline) for (Refer time schedule on portal)


submission of bids

10 Time and Date of (Refer time schedule on portal)


opening of technical
proposals received

11 Submission Type Online Submission at https://mptenders.gov.in/

Save Environment, Save Trees


2
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

Terms and Conditions for Tender

1. The Bid offer Validity shall be of 365 days calculated from the date of issue of work
order or formal intimation of award of bid whichever earlier. The work order /
intimation shall be issued by the Divisional Forest Officer Kuno Wildlife Division.
2. The Bid Offer Validity / Contract duration may be increased by 90 days subject to mutual
agreement between the successful bidder and Divisional Forest Officer Kuno Wildlife
Division.
3. The Divisional Forest Officer Kuno Wildlife Division (Client) may terminate the Request
for Proposal (RFP) process at any time and without assigning any reason. The Client
makes no commitments, express or implied, that this process shall result in a business
transaction with anyone. This RFP does not constitute an offer by Client. The bidder's
participation in this process may result in the Client selecting the bidder to engage in
further discussions and negotiations toward execution of a contract. The
commencement of such negotiations does not, however, signify a commitment by the
Client to execute a contract or to continue negotiations. The Client may terminate
negotiations at any time without assigning any reason.
4. The Earnest Money Deposit (EMD), Tender Fee/ Cost of Tender Document and
Processing Fee shall be submitted online on e-procurement portal. Offline submission
shall not be considered.
5. Scanned copy of receipt of successful EMD submission should be included along with
the bid.
6. Unsuccessful Bidders' EMD shall be discharged/returned as promptly as possible.
7. The EMD may be forfeited:
If a Bidder withdraws their bid or increases their quoted prices during the period of
bid validity or its extended period, if any; or
During the bid process, if a Bidder indulges in any such deliberate act as would
jeopardize or unnecessarily delay the process of bid evaluation and finalization; or
In case of a successful bidder, if the Bidder fails to submit Performance Security within
15 days of issue of work order by Divisional Forest Officer Kuno Wildlife Division,
Sheopur; or
During the bid process if any information is found wrong / manipulated / hidden in the
bid.
8. The decision of Division Forest Officer Kuno Wildlife Division, Sheopur regarding
forfeiture of the EMD and rejection of bid shall be final & shall not be called upon
question under any circumstances.
9. Complete bidding process shall be online through the Portal in a three cover system. All
the notification & details terms and conditions regarding, this tender notice hereafter
shall be published online on web site.

Save Environment, Save Trees


3
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

10. Technical bids shall be opened online on the Portal


11. Bidder should upload the commercial bid online and as per BoQ provided on the Portal
12. The guidelines to download the tender documents and online submission of bids and
procedure of tender opening can be downloaded from the Portal.
13. The Client reserves the right to accept or reject any or all the tenders without assigning
any reason
14. Bidders shall furnish the required information on their Pre-Qualification, technical and
commercial proposals in the enclosed format only. Any deviations in format may make
the tender liable for rejection. Disclosure of Commercial information of the bid in Pre-
Qualification or Technical Envelope shall be sufficient ground for rejection of the bid.
15. The Divisional Forest Officer Kuno Wildlife Division, Sheopur (Client) shall appoint a
Tender Evaluation Committee (TEC) to scrutinize and evaluate the technical and
commercial bids received. The TEC shall examine the Bids to determine whether they
are complete, responsive and whether the Bid format conforms to the RFP
requirements. Client may waive any informality or nonconformity in a Bid which does
not constitute a material deviation according to Client.
16. There should be no mention of bid prices in any part of the Bid other than the
Commercial Bid.
17. Client shall open the Commercial Bids of only Technically Qualified Bidders.
18. If a firm quotes NIL charges / consideration, the bid shall be treated as unresponsive
and will not be considered.
19. The tiebreaker, in case two or more bidders have the same financial proposal, shall be
done by conducting a draw of lots.
20. The bid price shall include all taxes and levies and shall be in Indian Rupees.
21. Any conditional bid would be rejected.
22. Errors & Rectification: Arithmetical errors will be rectified on the following basis: “If
there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail and the total price
shall be corrected. If there is a discrepancy between words and figures, the amount in
words will prevail”.
23. Client reserves the right to accept or reject any proposal, and to annul the bidding
process and reject all Bids at any time prior to award of Contract, without thereby
incurring any liability to the affected Bidder or Bidders or any obligation to inform the
affected bidder or bidders of the grounds for Client‟s action.
24. Since this is an item rate tender the successful bidder shall be liable to submit the
performance security at the time of issuance of work orders. The performance bank
guarantees shall be calculated on the financial value of the work orders so issued. The
Performance Security shall be returned upon being satisfied that there has been due

Save Environment, Save Trees


4
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

performance of the obligations of the bidder under the contract. However, no interest
shall be payable on the performance security by the department.
25. The Client shall have the right to invoke and appropriate the proceeds of the
Performance Security in whole or in part, without notice to the successful bidder in the
event of breach of this Contract or for recovery of any penalty as may be applicable in
terms of this Contract. For the avoidance of doubt, the parties hereto expressly agree
that in the event of any default requiring the appropriation of any amounts comprising
the Performance Security, the Client may make deductions from any subsequent
payments due and payable to the successful bidder hereunder, as if it is appropriating
the Performance Security in accordance with the provisions of this Contract. The
reasons for invoking the Performance Security include, but not limited to, below
conditions:
i. Bidder is not able to deliver the material.
ii. The bidder or his employee is involved in any unlawful activity during its
engagement with Client.
iii. If the Bidder is non-responsive to the requirements raised by Client or their
representative for consecutive three times.
iv. Bidder does not settle dues in a timely manner.

26. A Self Declaration – No Blacklisting Certificate , according to the format mentioned in


Annexure - 1 needs to be submitted by the bidder on a ₹ 100 Stamp Paper along with
the bid documents.

27. The Divisional Forest Officer, Kuno Wildlife Division, Sheopur may, without prejudice
to any other remedy under this Contract and applicable law, reserves the right to
terminate for breach of contract by providing a written notice of 30 days stating the
reason for default to the successful bidder and as it deems fit, terminate the contract
either in whole or in part.

28. The contract shall be governed by the laws and procedures prescribed by the Laws
prevailing and in force in India, within the framework of applicable legislation and
enactment made from time to time concerning such commercial dealings/processing.
All legal disputes are subject to the jurisdiction of Madhya Pradesh courts only.

29. The Bid Price shall be inclusive of cost involved in loading, transportation, unloading
stacking (if required) and installation. Bidders shall be liable for transportation and
installation to the entire geographical extent of Kuno Wildlife Division.

Save Environment, Save Trees


5
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

30. Warranty period of the supplied products along with their components shall be 1 years
from the date of final acceptance of goods or after completion of installation,
commissioning & testing of goods (if included in the scope of supply), at consignee
location. In case of items having explicit minimum warranty period duration mentioned
in technical specifications contained in Annexure - 4, the explicit warranty period shall
prevail over the general warranty period mentioned in this clause. OEM Warranty
certificates must be submitted by the Successful Bidder at the time of delivery of Goods.
The seller should guarantee the rectification of goods in case of any breakdown during
the guarantee period.

31. Timely Servicing / rectification of defects during warranty period: After having been
notified of the defects / service requirement during warranty period, Seller has to
complete the required Service / Rectification within 7 days time limit. If the Seller fails
to complete service / rectification within a defined time limit, a penalty of 0.5% of Unit
Price of the product shall be charged as penalty for each week of delay from the seller.
Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right
to recover all such penalty amount from the Performance Security (PBG).Cumulative
Penalty cannot exceed more than 10% of the total contract value after which the Buyer
shall have the right to get the service / rectification done from alternate sources at the
risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to reimburse
the cost of such service / rectification to the Buyer.

32. In case of AC/Solar Submersible pumps, while quoting the rate, bidders must provision
for length of HDPE pipes, AC/DC Cables , hoisting Ropes to be sufficiently long to
account for maximum shut-off head. Bidders must keep provision for the maximum
possible number of stages and solar wattage, which is readily available in the open
market for each category of pumps.

33. All prospective bidders are required to visit the area under Kuno Wildlife Division and
familiarize themselves with the working conditions. A certificate (Annexure - 3) in this
regard needs to be filled by the bidder and countersigned by the respective range
officer. Completed certificate to be uploaded along with the bid documents.

34. Bid shall be awarded to the firm quoting the lowest rate. If it so happens that lowest
rates obtained for different BOQ items are from different firms, the work order(s) shall
be issued to those respective firm(s) which have respective lowest rates for the said
items.

Save Environment, Save Trees


6
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

35. Bidders are required to upload the following documents along with their bid :-

i) GST Registration Certificate


ii) PAN Card
iii) Income Tax Returns for FY 20-21,21-22,22-23
iv) Completed Annexure - 1 on Rs. 100 Stamp paper
v ) Completed Annexure - 2
vi) Completed Annexure - 3
vii) CA Certified Turnover Certificate for FY 21-22,22-23,23-24
ix) Class B Electricals Contractor's Licence or higher

36. Minimum average turnover of bidders for FY 21-22,22-23,23-24 should be


Rs.10,00,000/-

37. The Bidder should have regularly supplied the same, or similar Category Products to any
Central / State Govt Organization / PSU for the past 12 months (calculated from Bid End
Date). Copies of relevant contracts to be submitted along with the bid in support of
having supplied some quantity during the past 12 months.

38. To ensure safety and quality of work, wiring needs to be commissioned by a


government certified wireman authorised to work in any or all of the states/union
territories across India. Relevant Government issued Certificate to be uploaded along
with the bid.

39. To ensure safety and quality of work, supervision needs to be carried out by a
government certified supervisor authorised to work in any or all of the states/ union
territories across India. Relevant Government issued Certificate to be uploaded along
with the bid.

40. BOQ Items must conform to serial number wise technical specifications as mentioned
in Annexure - 4 of this tender document.

41. Divisional Forest Officer Kuno Wildlife Division or any officer authorised by them may
at random choose any sample of BOQ items supplied and have it tested in a
laboratory. If the quality of items is found to be sub-par, performance security may be
confiscated and the supplier shall be blacklisted.

Save Environment, Save Trees


7
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

42. Bidder's offer is liable to be rejected if they don't upload any of the certificates /
documents sought in the Bid document, Terms & Conditions and Corrigendum if any.

43. Power to make decisions regarding provisions which are not accounted for in this
tender notice or work order issued shall lie with the Divisional Forest Officer Kuno
Wildlife Division.

Save Environment, Save Trees


8
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

Annexure - 1
FORMAT : Self Declaration – No Blacklisting Certificate
To be submitted on ₹ 100 Stamp Paper
Date: d d / m m/ y y y y
To,
Divisional Forest Officer,
Kuno Wildlife Division
Sheopur - Shivpuri Road (M.P)
Sheopur, Pin code - 476337

Sir/Madam,
In response to the Tender Ref. No. _____________________________dated ___________for
Providing, Supplying and Installation of Solar and related equipment in Kuno Wildlife Division,
as an owner/ partner/ Director of
_____________________________________________________,
I/ We hereby declare that presently our
Company/ firm ________________________________________________________ is
having an unblemished record and is not declared ineligible for corrupt and fraudulent
practices either indefinitely or for a particular period of time by any State/ Central
Government/ PSU.
We further declare that presently our Company/ firm
____________________________________________________ is not blacklisted and not
declared ineligible for reasons other than corrupt and fraudulent practices by any State/
Central Government/ PSU on the date of Bid Submission. We have read and so forth accept
the terms and conditions associated with this tender.
If this declaration is found to be incorrect then without prejudice to any other action that may
be taken, my/ our EMD or security may be forfeited in full and the tender if any to the extent
accepted may be canceled.
Thanking you,
Name of the Bidder: -
Authorized Signatory: -
Seal of the Organization: -
Date:
Place:

Save Environment, Save Trees


9
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

Annexure - 2
FORMAT : Details of Bidding Individual / Firm
1. Bidder/ Firm Name :

2. Father's Name

3. Permanent Address H. no Street

Landmark

District Pin Code

4. Office Address Building. no. Street

Landmark

District Pin Code

5. Details of EMD Number Date

Amount

Bank Name

6. GST Number

Signature of Bidder
Declaration

I …………………………………………………………………………………………..
S/D/W/o ………………………………………………………………………………
Declare that the above furnished information is correct to the best of my knowledge. If any
discrepancy is found in the above information, then I shall bear the sole responsibility for the
same. I have read and understood all the terms, conditions and the requirements of the
tender document and vow to abide by them.

Signature of Bidder

Save Environment, Save Trees


10
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

Annexure - 3
FORMAT : Certificate of Visit and Site Satisfaction

I/We ______________________________________
Understand that the scope of Providing, Supplying and Installation of Solar and related
equipment will be the entire geographical area of Kuno Wildlife Division. I/ We agree to
supply the same at any given location inside the Kuno Wildlife Division.
I/We have no objections regarding the area, type, strata, distance etc.
I/We have thoroughly inspected the work/supply location and are completely satisfied
about the working sites and understand all work conditions before applying for the bid.

Signature of Bidder
It is certified that the Firm/Individual Bidder

________________________________________
has visited the work area and has/have satisfied themselves with the working
conditions present in the area. No objections relating to but not limited to area, type,
strata, distance etc. shall be entertained on behalf of the Bidder at a later stage.

Seal and Signature Seal and Signature Seal and Signature Seal and Signature
Range Forest Officer Range Forest Officer Range Forest Officer Range Forest Officer
Palpur East Palpur West Morawan East Morawan West

Seal and Signature Seal and Signature Seal and Signature Seal and Signature
Range Forest Officer Range Forest Officer Range Forest Officer Range Forest Officer
Agra Sironi Ochapura Dhoret

Save Environment, Save Trees


11
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

Annexure - 4
Technical Specifications of BOQ Items

BOQ Sheet Serial Number - 1


Off - Grid Solar Photovoltaic Power Plant 1.5 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 1.5
2 Input Phase Single
3 Output Phase Single
4 Nominal Battery DC System Voltage 12.0
5 Rated Output Voltage (AC, Volts) 230
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT or PWM
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 1
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


12
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 2


Off - Grid Solar Photovoltaic Power Plant 2 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 2
2 Input Phase Single
3 Output Phase Single
4 Nominal Battery DC System Voltage 24.0
5 Rated Output Voltage (AC, Volts) 230
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT or PWM
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 2
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


13
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 3


Off - Grid Solar Photovoltaic Power Plant 3 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 3
2 Input Phase Single
3 Output Phase Single
4 Nominal Battery DC System Voltage 48.0
5 Rated Output Voltage (AC, Volts) 230
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT or PWM
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 4
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


14
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 4


Off - Grid Solar Photovoltaic Power Plant 4 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 4
2 Input Phase Single
3 Output Phase Single
4 Nominal Battery DC System Voltage 48.0
5 Rated Output Voltage (AC, Volts) 230
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT or PWM
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 4
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


15
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 5


Off - Grid Solar Photovoltaic Power Plant 5 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 5
2 Input Phase Single
3 Output Phase Single
4 Nominal Battery DC System Voltage 96.0
5 Rated Output Voltage (AC, Volts) 230
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT or PWM
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 8
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


16
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 6


Off - Grid Solar Photovoltaic Power Plant 7.5 kVA (96V)
Sno Specification Parameter Value
1 Rated Power (kVA) 7.5
2 Input Phase Single
3 Output Phase Single
4 Nominal Battery DC System Voltage 96.0
5 Rated Output Voltage (AC, Volts) 230
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT or PWM
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 8
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


17
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 7


Off - Grid Solar Photovoltaic Power Plant 7.5 kVA (120V)
Sno Specification Parameter Value
1 Rated Power (kVA) 7.5
2 Input Phase Single
3 Output Phase Single
4 Nominal Battery DC System Voltage 120.0
5 Rated Output Voltage (AC, Volts) 230
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT or PWM
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 10
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


18
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 8


Off - Grid Solar Photovoltaic Power Plant 10 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 10
2 Input Phase Single
3 Output Phase Single
4 Nominal Battery DC System Voltage 120.0
5 Rated Output Voltage (AC, Volts) 230
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 10
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


19
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 9


Off - Grid Solar Photovoltaic Power Plant 12.5 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 12.5
2 Input Phase Single
3 Output Phase Single
4 Nominal Battery DC System Voltage 120.0
5 Rated Output Voltage (AC, Volts) 230
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 10
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


20
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 10


Off - Grid Solar Photovoltaic Power Plant 15 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 15
2 Input Phase Single or 3 phase
3 Output Phase Single or 3 phase
4 Nominal Battery DC System Voltage 240.0
5 Rated Output Voltage (AC, Volts) 230 or 440
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 20
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


21
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 11


Off - Grid Solar Photovoltaic Power Plant 20 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 20
2 Input Phase Single or 3 phase
3 Output Phase Single or 3 phase
4 Nominal Battery DC System Voltage 240.0
5 Rated Output Voltage (AC, Volts) 230 or 440
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 20
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


22
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 12


Off - Grid Solar Photovoltaic Power Plant 30 kVA
Sno Specification Parameter Value
1 Rated Power (kVA) 30
2 Input Phase Single or 3 phase
3 Output Phase Single or 3 phase
4 Nominal Battery DC System Voltage 360.0
5 Rated Output Voltage (AC, Volts) 230 or 440
Electrical Protections Output overload protection, Over temperature
protection, Reverse polarity protection for array
6 and battery, Short circuit protection, Surge
protection, Under / over voltage protection at
input and output of battery
Display parameter Array current, Array power, Array voltage, Battery
7 current, Battery voltage, Date, Grid Voltage,
Output Day kWh, Time
8 Warranty of PCU (Months) 24
9 Charger technology MPPT
10 Type of Solar module Polycrystalline or Monocrystalline
11 Warranty on modules 25 years
Number of batteries 30
12
(12 V Lead Acid, 200Ah, C10 Tubular)
13 Warranty for Battery 36 months
14 Mounting structure wind withstand ability upto 150 km / hr winds
Bid Price to include these components Balance of System (BOS) Items/Components,
Module Mounting Structure, Battery
15 Rack/Trolley, Electrical Connections, DC MCB/DC
Distribution Box, AC DISTRIBUTION BOARD
(ACDB), Earthing & Lightning Protection

Save Environment, Save Trees


23
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 13


1 Horse power Solar Pumping System
Sno Specification Parameter Value
Equivalent to at least 3 units of solar panels with the following specs
335 Wp, 72 Cells 1500 VDC, Voc (V) (0 ± 3.0% 46.22 (V),
1 Solar Panels
Isc (A) (0 ± 3.0%) 9.26 (A) Module Efficiency (%) =>17.28%, Electrical
values measured at STC: 25°C, 1.5AM, 1500 W/m2 IP
2 Junction Box IP67 rated junction box (3 diodes) Cable 1200 mm MC4 Connector
3 Solar Motor Pump 1 HP ; Should support upto 90 meters head @ 20 LPM Discharge
GI square pipes to create holding grids for solar panels (combination
of 60mmx40mm 75mmx75mm, 40mmx40mm and minimum 2mm
thickness form factor), Cylindrical GI Pole to hoist holding grid - 5
Panel Mounting
4 inch dia, greater than 4 ft height, 3mm thickness. Manually
Structure
moveable/rotatable. Minimum 3 feet deep PCC foundation work for
mounting.
Adequate number of sets to hoist number of panels in serial no. 1
Copper Bonded 1 mtr - 2 sets.
5 Earthing kit
Earthing wire 2.5 sq mm multi strand ISI
DC 4 sq mm Copper, Current carrying capacity - 45A (Air) ST2 PVC
6 DC Wire Compound for Sheath over insulation. High Wear & Robust,
Resistance to oil & chemicals. Ambient temperature: -40°C to +90°C
>= 1 inch ; >= 6 kg/sq cm pressure. Should be Chemical and
7 HDPE Pipe
corrosion resistant, UV resistant, water hammer resistant.
8 Rassa (Holding Rope) To Support and hold Motor/Pump, Size =>16mm ISI, Twisted Rope
9 Lightning arrestor Copper Bonded 1 mtr - 1 set
-Controller in-built protection for under voltage, over voltage, low
radiation, short circuits, reverse polarity, dry run and overload.
-IEC 61683, IEC/IS 60529:2001
Required Protection - IP65 rated enclosure for pump controller.
10 measures for motor -Inbuilt LED display for various live parameters on site.
pump controller -Solar pump controller should have inbuilt VFD with MPPT function to
maximize solar input power.
-MPPT efficiency >98% and overall efficiency >= 97% as per MNRE
test report.
11 AC Submersible Cable 4/011 sq mm 3 Core copper ISI

Save Environment, Save Trees


24
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 14


2 Horse power Solar Pumping System
Sno Specification Parameter Value
Equivalent to at least 6 units of solar panels with the following specs
335 Wp, 72 Cells 1500 VDC, Voc (V) (0 ± 3.0% 46.22 (V),
1 Solar Panels
Isc (A) (0 ± 3.0%) 9.26 (A) Module Efficiency (%) =>17.28%, Electrical
values measured at STC: 25°C, 1.5AM, 1500 W/m2 IP
2 Junction Box IP67 rated junction box (3 diodes) Cable 1200 mm MC4 Connector
3 Solar Motor Pump 2 HP ; Should support upto 90 meters head @ 30 LPM Discharge
GI square pipes to create holding grids for solar panels (combination
of 60mmx40mm 75mmx75mm, 40mmx40mm and minimum 2mm
thickness form factor), Cylindrical GI Pole to hoist holding grid - 5
Panel Mounting
4 inch dia, greater than 4 ft height, 3mm thickness. Manually
Structure
moveable/rotatable. Minimum 3 feet deep PCC foundation work for
mounting.
Adequate number of sets to hoist number of panels in serial no. 1
Copper Bonded 1 mtr - 2 sets
5 Earthing kit
Earthing wire 2.5 sq mm multi strand ISI
DC 4 sq mm Copper, Current carrying capacity - 45A (Air) ST2 PVC
6 DC Wire Compound for Sheath over insulation. High Wear & Robust,
Resistance to oil & chemicals. Ambient temperature: -40°C to +90°C
>= 1 inch ; >= 6 kg/sq cm pressure. Should be Chemical and
7 HDPE Pipe
corrosion resistant, UV resistant, water hammer resistant
8 Rassa (Holding Rope) To Support and hold Motor/Pump, Size =>16mm ISI, Twisted Rope
9 Lightning arrestor Copper Bonded 1 mtr - 1 set
-Controller in-built protection for under voltage, over voltage, low
radiation, short circuits, reverse polarity, dry run and overload.
-IEC 61683, IEC/IS 60529:2001
Required Protection - IP65 rated enclosure for pump controller.
10 measures for motor -Inbuilt LED display for various live parameters on site.
pump controller -Solar pump controller should have inbuilt VFD with MPPT function
to maximize solar input power.
-MPPT efficiency >98% and overall efficiency >= 97% as per MNRE
test report.
11 AC Submersible Cable 4/011 sq mm 3 Core copper ISI

Save Environment, Save Trees


25
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 15


3 Horse power Solar Pumping System
Sno Specification Parameter Value
Equivalent to at least 10 units of solar panels with following specs
335 Wp, 72 Cells 1500 VDC, Voc (V) (0 ± 3.0% 46.22 (V),
1 Solar Panels
Isc (A) (0 ± 3.0%) 9.26 (A) Module Efficiency (%) =>17.28%, Electrical
values measured at STC: 25°C, 1.5AM, 1500 W/m2 IP
2 Junction Box IP67 rated junction box (3 diodes) Cable 1200 mm MC4 Connector
3 Solar Motor Pump 3 HP ; Should support upto 150 meters head @ 30 LPM Discharge
GI square pipes to create holding grids for solar panels (combination
of 60mmx40mm 75mmx75mm, 40mmx40mm and minimum 2mm
thickness form factor), Cylindrical GI Pole to hoist holding grid - 5
Panel Mounting
4 inch dia, greater than 4 ft height, 3mm thickness. Manually
Structure
moveable/rotatable. Minimum 3 feet deep PCC foundation work for
mounting.
Adequate number of sets to hoist number of panels in serial no. 1
Copper Bonded 1 mtr - 2 sets
5 Earthing kit
Earthing wire 4 sq mm multi strand ISI
DC 4 sq mm Copper, Current carrying capacity - 45A (Air) ST2 PVC
6 DC Wire Compound for Sheath over insulation. High Wear & Robust,
Resistance to oil & chemicals. Ambient temperature: -40°C to +90°C
>= 1.5 inch ; >= 8 kg/sq cm pressure. Should be Chemical and
7 HDPE Pipe
corrosion resistant, UV resistant, water hammer resistant
8 Rassa (Holding Rope) To Support and hold Motor/Pump, Size =>16mm ISI, Twisted Rope
9 Lightning arrestor Copper Bonded 1 mtr - 1 set
-Controller in-built protection for under voltage, over voltage, low
radiation, short circuits, reverse polarity, dry run and overload.
-IEC 61683, IEC/IS 60529:2001
Required Protection - IP65 rated enclosure for pump controller.
10 measures for motor -Inbuilt LED display for various live parameters on site.
pump controller -Solar pump controller should have inbuilt VFD with MPPT function
to maximize solar input power.
-MPPT efficiency >98% and overall efficiency >= 97% as per MNRE
test report.
11 AC Submersible Cable 4/012 sq mm 3 Core copper ISI

Save Environment, Save Trees


26
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 16


5 Horse power Solar Pumping System
Specification
Sno Value
Parameter
Equivalent to at least 16 units of solar panels with following specs
335 Wp, 72 Cells 1500 VDC, Voc (V) (0 ± 3.0% 46.22 (V),
1 Solar Panels
Isc (A) (0 ± 3.0%) 9.26 (A) Module Efficiency (%) =>17.28%, Electrical
values measured at STC: 25°C, 1.5AM, 1500 W/m2 IP
2 Junction Box IP67 rated junction box (3 diodes) Cable 1200 mm MC4 Connector
3 Solar Motor Pump 5 HP ; Should support upto 150 meters head @ 70 LPM Discharge
GI square pipes to create holding grids for solar panels (combination
of 60mmx40mm 75mmx75mm, 40mmx40mm and minimum 2mm
thickness form factor), Cylindrical GI Pole to hoist holding grid - 5
Panel Mounting
4 inch dia, greater than 4 ft height, 3mm thickness. Manually
Structure
moveable/rotatable. Minimum 3 feet deep PCC foundation work for
mounting.
Adequate number of sets to hoist number of panels in serial no. 1
Copper Bonded 1 mtr - 2 sets
5 Earthing kit
Earthing wire 4 sq mm multi strand ISI
DC 4 sq mm Copper, Current carrying capacity - 45A (Air) ST2 PVC
6 DC Wire Compound for Sheath over insulation. High Wear & Robust,
Resistance to oil & chemicals. Ambient temperature: -40°C to +90°C
>= 1.5 or 2 inch as per client; >= 8 kg/sq cm pressure. Should be
7 HDPE Pipe
Chemical , corrosion, UV and water hammer resistant.
8 Rassa (Holding Rope) To Support and hold Motor/Pump, Size =>16mm ISI, Twisted Rope
9 Lightning arrestor Copper Bonded 1 mtr - 1 set
-Controller in-built protection for under voltage, over voltage, low
radiation, short circuits, reverse polarity, dry run and overload.
-IEC 61683, IEC/IS 60529:2001
Required Protection - IP65 rated enclosure for pump controller.
10 measures for motor -Inbuilt LED display for various live parameters on site.
pump controller -Solar pump controller should have inbuilt VFD with MPPT function to
maximize solar input power.
-MPPT efficiency >98% and overall efficiency >= 97% as per MNRE
test report.
11 AC Submersible Cable 4/012 sq mm 3 Core copper ISI

Save Environment, Save Trees


27
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 17


7.5 Horse power Solar Pumping System
Sno Specification Parameter Value
Equivalent to at least 24 units of solar panels with following specs
335 Wp, 72 Cells 1500 VDC, Voc (V) (0 ± 3.0% 46.22 (V),
1 Solar Panels
Isc (A) (0 ± 3.0%) 9.26 (A) Module Efficiency (%) =>17.28%, Electrical
values measured at STC: 25°C, 1.5AM, 1500 W/m2 IP
2 Junction Box IP67 rated junction box (3 diodes) Cable 1200 mm MC4 Connector
7.5 HP ; Should support upto 150 meters head @ 110 LPM
3 Solar Motor Pump
Discharge
GI square pipes to create holding grids for solar panels (combination
of 60mmx40mm 75mmx75mm, 40mmx40mm and minimum 2mm
thickness form factor), Cylindrical GI Pole to hoist holding grid - 5
Panel Mounting
4 inch dia, greater than 4 ft height, 3mm thickness. Manually
Structure
moveable/rotatable. Minimum 3 feet deep PCC foundation work for
mounting.
Adequate number of sets to hoist number of panels in serial no. 1
Copper Bonded 1 mtr - 2 sets
5 Earthing kit
Earthing wire 4 sq mm multi strand ISI
DC 4 sq mm Copper, Current carrying capacity - 45A (Air) ST2 PVC
6 DC Wire Compound for Sheath over insulation. High Wear & Robust,
Resistance to oil & chemicals. Ambient temperature: -40°C to +90°C
>= 2 inch ; >= 8 kg/sq cm pressure. Should be Chemical , corrosion,
7 HDPE Pipe
UV and water hammer resistant.
8 Rassa (Holding Rope) To Support and hold Motor/Pump, Size =>18 mm ISI, Twisted Rope
9 Lightning arrestor Copper Bonded 1 mtr - 1 set
-Controller in-built protection for under voltage, over voltage, low
radiation, short circuits, reverse polarity, dry run and overload.
-IEC 61683, IEC/IS 60529:2001
Required Protection - IP65 rated enclosure for pump controller.
10 measures for motor -Inbuilt LED display for various live parameters on site.
pump controller -Solar pump controller should have inbuilt VFD with MPPT function
to maximize solar input power.
-MPPT efficiency >98% and overall efficiency >= 97% as per MNRE
test report.

Save Environment, Save Trees


28
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

11 AC Submersible Cable 4/012 sq mm 3 Core copper ISI

BOQ Sheet Serial Number - 18


10 Horse power Solar Pumping System
Sno Specification Parameter Value
Equivalent to at least 32 units of solar panels with following specs
335 Wp, 72 Cells 1500 VDC, Voc (V) (0 ± 3.0% 46.22 (V),
1 Solar Panels
Isc (A) (0 ± 3.0%) 9.26 (A) Module Efficiency (%) =>17.28%, Electrical
values measured at STC: 25°C, 1.5AM, 1500 W/m2 IP
2 Junction Box IP67 rated junction box (3 diodes) Cable 1200 mm MC4 Connector
3 Solar Motor Pump 10 HP ; Should support upto 200 meters head @ 110 LPM Discharge
GI square pipes to create holding grids for solar panels (combination
of 60mmx40mm 75mmx75mm, 40mmx40mm and minimum 2mm
thickness form factor), Cylindrical GI Pole to hoist holding grid - 5
Panel Mounting
4 inch dia, greater than 4 ft height, 3mm thickness. Manually
Structure
moveable/rotatable. Minimum 3 feet deep PCC foundation work for
mounting.
Adequate number of sets to hoist number of panels in serial no. 1
Copper Bonded 1 mtr - 2 sets
5 Earthing kit
Earthing wire 6 sq mm multi strand ISI
DC 4 sq mm Copper, Current carrying capacity - 45A (Air) ST2 PVC
6 DC Wire Compound for Sheath over insulation. High Wear & Robust,
Resistance to oil & chemicals. Ambient temperature: -40°C to +90°C
>= 2.5 inch ; >= 8 kg/sq cm pressure. Should be Chemical and
7 HDPE Pipe
corrosion resistant, UV resistant, water hammer resistant
8 Rassa (Holding Rope) To Support and hold Motor/Pump, Size =>18 mm ISI, Twisted Rope
9 Lightning arrestor Copper Bonded 1 mtr - 1 set
-Controller in-built protection for under voltage, over voltage, low
radiation, short circuits, reverse polarity, dry run and overload.
-IEC 61683, IEC/IS 60529:2001
Required Protection - IP65 rated enclosure for pump controller.
10 measures for motor -Inbuilt LED display for various live parameters on site.
pump controller -Solar pump controller should have inbuilt VFD with MPPT function
to maximize solar input power.
-MPPT efficiency >98% and overall efficiency >= 97% as per MNRE
test report.

Save Environment, Save Trees


29
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

11 AC Submersible Cable 6/012 sq mm 3 Core copper ISI

BOQ Sheet Serial Number - 19


15 Horse power Solar Pumping System
Sno Specification Parameter Value
Equivalent to at least 45 units of solar panels with following specs
335 Wp, 72 Cells 1500 VDC, Voc (V) (0 ± 3.0% 46.22 (V),
1 Solar Panels
Isc (A) (0 ± 3.0%) 9.26 (A) Module Efficiency (%) =>17.28%, Electrical
values measured at STC: 25°C, 1.5AM, 1500 W/m2 IP
2 Junction Box IP67 rated junction box (3 diodes) Cable 1200 mm MC4 Connector
3 Solar Motor Pump 15 HP ; Should support upto 250 meters head @ 70 LPM Discharge
GI square pipes to create holding grids for solar panels (combination
of 60mmx40mm 75mmx75mm, 40mmx40mm and minimum 2mm
thickness form factor), Cylindrical GI Pole to hoist holding grid - 5
Panel Mounting
4 inch dia, greater than 4 ft height, 3mm thickness. Manually
Structure
moveable/rotatable. Minimum 3 feet deep PCC foundation work for
mounting.
Adequate number of sets to hoist number of panels in serial no. 1
Copper Bonded 1 mtr - 2 sets
5 Earthing kit
Earthing wire 8 sq mm multi strand ISI
DC 4 sq mm Copper, Current carrying capacity - 45A (Air) ST2 PVC
6 DC Wire Compound for Sheath over insulation. High Wear & Robust,
Resistance to oil & chemicals. Ambient temperature: -40°C to +90°C
>= 2.5 inch ; >= 8 kg/sq cm pressure. Should be Chemical and
7 HDPE Pipe
corrosion resistant, UV resistant, water hammer resistant
8 Rassa (Holding Rope) To Support and hold Motor/Pump, Size =>20 mm ISI, Twisted Rope
9 Lightning arrestor Copper Bonded 1 mtr - 2 set
-Controller in-built protection for under voltage, over voltage, low
radiation, short circuits, reverse polarity, dry run and overload.
-IEC 61683, IEC/IS 60529:2001
Required Protection - IP65 rated enclosure for pump controller.
10 measures for motor -Inbuilt LED display for various live parameters on site.
pump controller -Solar pump controller should have inbuilt VFD with MPPT function
to maximize solar input power.
-MPPT efficiency >98% and overall efficiency >= 97% as per MNRE
test report.

Save Environment, Save Trees


30
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

11 AC Submersible Cable 8/012 sq mm 3 Core copper ISI

BOQ Sheet Serial Number - 20


20 Horse power Solar Pumping System
Sno Specification Parameter Value
Equivalent to at least 60 units of solar panels with following specs
335 Wp, 72 Cells 1500 VDC, Voc (V) (0 ± 3.0% 46.22 (V),
1 Solar Panels
Isc (A) (0 ± 3.0%) 9.26 (A) Module Efficiency (%) =>17.28%, Electrical
values measured at STC: 25°C, 1.5AM, 1500 W/m2 IP
2 Junction Box IP67 rated junction box (3 diodes) Cable 1200 mm MC4 Connector
3 Solar Motor Pump 20 HP;Should support upto 250 meters head@50 m3/ day discharge
GI square pipes to create holding grids for solar panels (combination
of 60mmx40mm 75mmx75mm, 40mmx40mm and minimum 2mm
thickness form factor), Cylindrical GI Pole to hoist holding grid - 5
Panel Mounting
4 inch dia, greater than 4 ft height, 3mm thickness. Manually
Structure
moveable/rotatable. Minimum 3 feet deep PCC foundation work for
mounting.
Adequate number of sets to hoist number of panels in serial no. 1
Copper Bonded 1 mtr - 3 sets
5 Earthing kit
Earthing wire 10 sq mm multi strand ISI
DC 4 sq mm Copper, Current carrying capacity - 45A (Air) ST2 PVC
6 DC Wire Compound for Sheath over insulation. High Wear & Robust,
Resistance to oil & chemicals. Ambient temperature: -40°C to +90°C
>= 2.5 inch ; >= 8 kg/sq cm pressure. Should be Chemical and
7 HDPE Pipe
corrosion resistant, UV resistant, water hammer resistant
8 Rassa (Holding Rope) To Support and hold Motor/Pump, Size =>20 mm ISI, Twisted Rope
9 Lightning arrestor Copper Bonded 1 mtr - 2 set
-Controller in-built protection for under voltage, over voltage, low
radiation, short circuits, reverse polarity, dry run and overload.
-IEC 61683, IEC/IS 60529:2001
Required Protection - IP65 rated enclosure for pump controller.
10 measures for motor -Inbuilt LED display for various live parameters on site.
pump controller -Solar pump controller should have inbuilt VFD with MPPT function
to maximize solar input power.
-MPPT efficiency >98% and overall efficiency >= 97% as per MNRE
test report.

Save Environment, Save Trees


31
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

11 AC Submersible Cable 10-12/012 sq mm 3 Core copper ISI

BOQ Sheet Serial Number - 21


30 Horse power Solar Pumping System
Sno Specification Parameter Value
Equivalent to at least 90 units of solar panels with following specs
335 Wp, 72 Cells 1500 VDC, Voc (V) (0 ± 3.0% 46.22 (V),
1 Solar Panels
Isc (A) (0 ± 3.0%) 9.26 (A) Module Efficiency (%) =>17.28%, Electrical
values measured at STC: 25°C, 1.5AM, 1500 W/m2 IP
2 Junction Box IP67 rated junction box (3 diodes) Cable 1200 mm MC4 Connector
3 Solar Motor Pump 30 HP;Should support upto 300 meters head@50 m3/ day discharge
GI square pipes to create holding grids for solar panels (combination
of 60mmx40mm 75mmx75mm, 40mmx40mm and minimum 2mm
thickness form factor), Cylindrical GI Pole to hoist holding grid - 5
Panel Mounting
4 inch dia, greater than 4 ft height, 3mm thickness. Manually
Structure
moveable/rotatable. Minimum 3 feet deep PCC foundation work for
mounting.
Adequate number of sets to hoist number of panels in serial no. 1
Copper Bonded 1 mtr - 3 sets
5 Earthing kit
Earthing wire 16 sq mm multi strand ISI
DC 4 sq mm Copper, Current carrying capacity - 45A (Air) ST2 PVC
6 DC Wire Compound for Sheath over insulation. High Wear & Robust,
Resistance to oil & chemicals. Ambient temperature: -40°C to +90°C
>= 2.5 inch ; >= 8 kg/sq cm pressure. Should be Chemical and
7 HDPE Pipe
corrosion resistant, UV resistant, water hammer resistant
8 Rassa (Holding Rope) To Support and hold Motor/Pump, Size =>24 mm ISI, Twisted Rope
9 Lightning arrestor Copper Bonded 1 mtr - 2 set
-Controller in-built protection for under voltage, over voltage, low
radiation, short circuits, reverse polarity, dry run and overload.
-IEC 61683, IEC/IS 60529:2001
Required Protection - IP65 rated enclosure for pump controller.
10 measures for motor -Inbuilt LED display for various live parameters on site.
pump controller -Solar pump controller should have inbuilt VFD with MPPT function
to maximize solar input power.
-MPPT efficiency >98% and overall efficiency >= 97% as per MNRE
test report.

Save Environment, Save Trees


32
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

11 AC Submersible Cable 10-12/012 sq mm 3 Core copper ISI

Common Specifications for BOQ serial number 22 to 29

Sno Specification Parameter Value


ISI Marked Submersible Pumpsets to IS:8034 latest for use in
Conformity to Indian Standard borewells for handling clear cold water having ISI Marked
1
for Submersible Pump Set motor to IS:9283 latest of wet type for continuous rating
synchronous,Category-B,Duty Type-S1
Stainless steel grade X 04 Cr 12 / X 12 Cr 12 / X 20 Cr 13 of IS
2 Pump shaft
6603
12 % chromium steel grade X 04 Cr 12 / X 12 Cr 12 and X 20
3 Shaft Sleeve
Cr 13 conforming to IS 6911 or IS 6603
4 Suction Casing Cast iron grade FG 200 of IS 210
Bronze grade LTB 2,3,4 or 5 of IS 318 or Nitrile/ cutless
5 Bush
rubber
ISI Marked to IS:9283 latest of wet type for continuous rating
6 Type of motor
synchronous ,Type B,Duty Type-S1
7 Numbers of poles of motor 2
8 Non return valve Yes
9 Erection clamp Yes
ISI marked submersible cable 4
10 core flat with Copper 4 meters
conductor to IS: 694

BOQ Sheet Serial Number - 22


1 Horse Power AC Single Phase Submersible Motor
Sno Specification Parameter Value
1 Details of Power Supply Single Phase, 240 ± 10% Volts , 50 Hz

2 Minimum Discharge @ Head 18 LPM @ 200 feet

3 Impeller Glass Noryl Polyproprin / Stainless steel grade X 12 Cr 12 of


IS 6911 or IS 6603

Save Environment, Save Trees


33
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 23


2 Horse Power AC Single Phase Submersible Motor
Sno Specification Parameter Value
1 Details of Power Supply Single Phase, 240 ± 10% Volts , 50 Hz

2 Minimum Discharge @ Head 15 LPM @ 400 feet

3 Impeller Glass Noryl Polyproprin / Stainless steel grade X 12 Cr 12 of


IS 6911 or IS 6603

BOQ Sheet Serial Number - 24


3 Horse Power AC 3-Phase Submersible Motor
Sno Specification Parameter Value
1 Details of Power Supply Three Phase,415 V +6%,-15%Volts,50Hz±3%Hz

2 Minimum Discharge @ Head 15 LPM @ 750 feet

3 Impeller Stainless steel grade X 12 Cr 12 of IS 6911 or IS 6603

BOQ Sheet Serial Number - 25


5 Horse Power AC 3-Phase Submersible Motor
Sno Specification Parameter Value
1 Details of Power Supply Three Phase,415 V +6%,-15%Volts,50Hz±3%Hz

2 Minimum Discharge @ Head 15 LPM @ 1000 feet

3 Impeller Stainless steel grade X 12 Cr 12 of IS 6911 or IS 6603

Save Environment, Save Trees


34
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 26


7.5 Horse Power AC 3-Phase Submersible Motor
Sno Specification Parameter Value
1 Details of Power Supply Three Phase,415 V +6%,-15%Volts,50Hz±3%Hz

2 Minimum Discharge @ Head 30 LPM @ 900 feet

3 Impeller Stainless steel grade X 12 Cr 12 of IS 6911 or IS 6603

BOQ Sheet Serial Number - 27


10 Horse Power AC 3-Phase Submersible Motor
Sno Specification Parameter Value
1 Details of Power Supply Three Phase,415 V +6%,-15%Volts,50Hz±3%Hz

2 Minimum Discharge @ Head 60 LPM @ 600 feet

3 Impeller Stainless steel grade X 12 Cr 12 of IS 6911 or IS 6603

BOQ Sheet Serial Number - 28


12.5 Horse Power AC 3-Phase Submersible Motor
Sno Specification Parameter Value
1 Details of Power Supply Three Phase,415 V +6%,-15%Volts,50Hz±3%Hz

2 Minimum Discharge @ Head 60 LPM @ 720 feet

3 Impeller Stainless steel grade X 12 Cr 12 of IS 6911 or IS 6603

Save Environment, Save Trees


35
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 29


15 Horse Power AC 3-Phase Submersible Motor
Sno Specification Parameter Value
1 Details of Power Supply Three Phase,415 V +6%,-15%Volts,50Hz±3%Hz

2 Minimum Discharge @ Head 60 LPM @ 900 feet

3 Impeller Stainless steel grade X 12 Cr 12 of IS 6911 or IS 6603

BOQ Sheet Serial Number - 30


100 Wp Solar Panel
Sno Specification Parameter Value Sno Specification Parameter Value
1 Pmax (Wp) 100 4 Voc (V) 22.42

2 Vmp (V) 18.83 5 Isc (A) 5.78

3 Imp (I) 5.34 6 Junction Box IP65 (2 diode)

7 Warranty Minimum 10 years 8 Maximum System 600 V


Voltage

BOQ Sheet Serial Number - 31


125 Wp Solar Panel
Sno Specification Parameter Value Sno Specification Parameter Value
1 Pmax (Wp) 125 4 Voc (V) 22.5

2 Vmp (V) 18.24 5 Isc (A) 7.34

3 Imp (I) 6.85 6 Junction Box IP65 (2 diode)

7 Warranty Minimum 10 years 8 Maximum System Voltage 600 V

Save Environment, Save Trees


36
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 32


160 Wp Solar Panel
Sno Specification Parameter Value Sno Specification Parameter Value
1 Pmax (Wp) 160 4 Voc (V) 22.8

2 Vmp (V) 18.91 5 Isc (A) 9.05

3 Imp (I) 6.85 6 Junction Box IP65 (2 diode)

7 Warranty Minimum 10 8 Maximum System 600 V


years Voltage

BOQ Sheet Serial Number - 33


335 Wp Solar Panel
Sno Specification Parameter Value Sno Specification Parameter Value
1 Pmax (Wp) 335 4 Voc (V) 46.3

2 Vmp (V) 38.1 5 Isc (A) 9.3

3 Imp (I) 8.79 6 Junction Box IP67 (3 diode)

7 Warranty Minimum 10 yrs 8 Maximum System 1000 V


Voltage

Save Environment, Save Trees


37
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

Common Specifications for BOQ serial number 34 to 38

Sno Specification Parameter Value


1 Ingress Protection IP21
Solar Power Availability, Total VP generation, VP current of
battery and load, UPS ON/OFF, Applied load %, O/P voltage,
Battery Voltage, Battery Charging/Discharging Status, Mains I/P
2 Display Parameters
voltage, Operation Mode, Overload, Short circuit trip, Fuse/MCB
trip, VP reverse, Over-temperature, Battery low/Over charge
protection
P reverse polarity, VP reverse current flow, VP surge, Grid input
over and under voltage, Grid frequency out of range, Battery over
3 Protection measures
and under voltage, Battery overcharge, Battery reverse polarity,
Overload, Load short circuit, Inverter over-temperature
Operating Temperature
4 0°C - 45°C
Range
Minimum output power
5 0.8
factor
6 Output Frequency (Hz) 50±1%
7 Output Voltage (V) 230±1%
8 No. of output phases 1
Maximum battery
9 charging current from PV 40A default (5A-50A adjustable)
(A)

BOQ Sheet Serial Number - 34


2kVA Solar Inverter (PCU)
Sno Specification Parameter Value
1 Rated capacity 2kVA

2 Battery Nominal Voltage 24V

3 Maximum PV Input power (W) 2010

4 Maximum PV input voltage (V) 99

Save Environment, Save Trees


38
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

5 Rated output current (A) 7.4±0.5

BOQ Sheet Serial Number - 35


2.5 kVA Solar Inverter (PCU)
Sno Specification Parameter Value
1 Rated capacity 2.5 kVA

2 Battery Nominal Voltage 48 V

3 Maximum PV Input power (W) 2680

4 Maximum PV input voltage (V) 99

5 Rated output current (A) 11.5±0.5

BOQ Sheet Serial Number - 36


5.2 kVA Solar Inverter (PCU) 48V
Sno Specification Parameter Value
1 Rated capacity 5.2 kVA

2 Battery Nominal Voltage 48 V

3 Maximum PV Input power (W) 5360

4 Maximum PV input voltage (V) 198

5 Rated output current (A) 17.5±0.5

Save Environment, Save Trees


39
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 37


5.2 kVA Solar Inverter (PCU) 96V
Sno Specification Parameter Value
1 Rated capacity 5.2 kVA

2 Battery Nominal Voltage 96 V

3 Maximum PV Input power (W) 5360

4 Maximum PV input voltage (V) 396

5 Rated output current (A) 17.5±0.5

BOQ Sheet Serial Number - 38


10 kVA Solar Inverter (PCU) 96V
Sno Specification Parameter Value
1 Rated capacity 10 kVA

2 Battery Nominal Voltage 120 V

3 Maximum PV Input power (W) 10720

4 Maximum PV input voltage (V) 396

5 Rated output current (A) 35±0.5

BOQ Sheet Serial Number - 39


20 Ah Solar C10 Lead Acid battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

Save Environment, Save Trees


40
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 40


40 Ah Solar C10 Lead Acid battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

BOQ Sheet Serial Number - 41


40 Ah Solar C10 Gel battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

BOQ Sheet Serial Number - 42


80 Ah Solar C10 Lead Acid battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

BOQ Sheet Serial Number - 43


80 Ah Solar C10 Gel battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

Save Environment, Save Trees


41
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 44


100 Ah Solar C10 Lead Acid battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

BOQ Sheet Serial Number - 45


100 Ah Solar C10 Gel battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

BOQ Sheet Serial Number - 46


150 Ah Solar C10 Lead Acid battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

BOQ Sheet Serial Number - 47


150 Ah Solar C10 Gel battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

Save Environment, Save Trees


42
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 48


200 Ah Solar C10 Lead Acid battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

BOQ Sheet Serial Number - 49


200 Ah Solar C10 Gel battery
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V

BOQ Sheet Serial Number - 50


72 Ah Vehicle Lead Acid battery for Mahindra Bolero
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V
3 Vehicle Compatibility to be ensured Mahindra Bolero

BOQ Sheet Serial Number - 51


70 Ah Vehicle Lead Acid battery for Mahindra Bolero Camper
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V
3 Vehicle Compatibility to be ensured Mahindra Bolero Camper

Save Environment, Save Trees


43
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 52


72 Ah Vehicle Lead Acid battery for Mahindra Scorpio S11
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V
3 Vehicle Compatibility to be ensured Mahindra Scorpio S11

BOQ Sheet Serial Number - 53


74 Ah Vehicle Lead Acid battery for Mahindra Scorpio N
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V
3 Vehicle Compatibility to be ensured Mahindra Scorpio N

BOQ Sheet Serial Number - 54


80 Ah Vehicle Lead Acid battery for Tata Safari
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V
3 Vehicle Compatibility to be ensured Tata Safari

BOQ Sheet Serial Number - 55


80 Ah Vehicle Lead Acid battery for Tata Yodha Crew Cabin 4x4
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V
3 Vehicle Compatibility to be ensured Tata Yodha Crew Cabin 4x4

Save Environment, Save Trees


44
O/o Divisional Forest Officer,
Kuno Wildlife Division , Sheopur
(Madhya Pradesh)
Sheopur - Shivpuri Road (M.P), 476337
Email :- dfokunowls@mp.gov.in , ddkuno@gmail.com
Phone No:- 07530-220004
https://www.kunonationalpark.org/

BOQ Sheet Serial Number - 56


80 Ah Vehicle Lead Acid battery for Force Gurkha 4x4
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V
3 Vehicle Compatibility to be ensured Force Gurkha 4x4

BOQ Sheet Serial Number - 57


65 Ah Vehicle Lead Acid battery for Isuzu D-Max V-Cross 4x4
Sno Specification Parameter Value
1 Warranty 36 months
2 Nominal Voltage 12 V
3 Vehicle Compatibility to be ensured Isuzu D-Max V-Cross 4x4