Structural Plan - 3
Structural Plan - 3
Structural Plan - 3
A B C D A B C D
B-1
1 1
B-1 B-1 B-1
STAIRWELL
2 B-2 2 STAIRWELL
B-1
S S B-1 S B-2 S B-2
B-2 S S
ROOF DECK
SECOND FLOOR
ADVANCED LEVEL CONST'N & ENGINEERING CONSULTANCY Ownership of Plans, Specifications, and other Contract Documents 3
Site Development* Bridges & Highways*Real Estate Development* Irrigation* Dams & Water Impounding* Buildings*
Water works* Flood Control & Dredging*Railways* Pipe Works* Treatment Plants* Airport Drawings & specifications and other contract documents duly signed,
stamped or sealed, as instruments of service, are the intellectual property
PROPOSED 2 STOREY MIX-USED SECOND FLOOR FRAMING PLAN
MR. KARL ROMAN O. WONG
ENGINEERING CONSULTANCY
& documents of the architect, whether the object for which they are made
is executed or not. it shall be unlawful for any person to duplicate or to
make copies of said documents for use in the repetition of and for other
BUILDING WITH ROOF DECK ROOF DECK BEAM FRAMING
PLAN S
PRC REG.NO.:
IAPOA NO.:
VALIDITY:
VALIDITY:
PRC REG.NO.:
PTR NO.:
VALIDITY:
DATE:
projects or buildings, whether executed partly or in whole, without the ( AS BUILT PLAN ) 6
written consent of architect or author of said documents.
PTR NO.: DATE: PLACE: CAGAYAN DE ORO T.I.N.: LOCATION : BLOCK 14 LOT 11 XAVIER HEIGHTS SUBDIVISION,UPPER BALULANG
PLACE: T.I.N.: CITY
CAGAYAN DE ORO CITY , 9000 MISAMIS ORIENTAL