Nothing Special   »   [go: up one dir, main page]

Shady Eid Civil Engineer CV

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Shady Eid

Civil QC Engineer
+ (963)953 449 174 ::SHADI.SY.EID@GMAIL.COM:: Syria Homs

Work history

SAHAB Trading and Contracting Co. Syria-Homs


09/2018 up to date
Summary Civil QC Engineer
Work over location maintenance and restoration services
A high performing civil site engineer contract.
who has considerable experience
over 19 years of working in Oil and
Gas fields, execution of gas plants,
industrial Building Structures, Sr. Project Engineer – 09/2010 to 01/2013
Vartanian Oil Field Services CO., Syria
infrastructure, utilities, geotechnical,
Drilling & Workover Location Construction¸ Maintenance
structural, and roads projects, I am
And Restoration Services Contract.
responsible good for the supervision,
coordination, and planning of the
work for trade contractors in on-site
construction environments in a safe
Sr. Civil Supervisor – 07/2008 to 09/2010
and efficient manner.
Petrofac International Ltd., Saudi Arabia

Skills •ARAMCO Contract NO: 6600021903 (IK)


Karan Utilities & Co-Generation Project
 Exposure to EPC environments https://www.petrofac.com/en-gb/media/news/karan-project-
completion-in-saudi-arabia/
 MS Office, AutoCAD,
NAVISWORKS.
 Exceptional communication skills
•BG Contract NO:103516CNT
 Quality assurance and control
HUSDRUBAL TERMINAL, TUNISIA, British Gas BG
 Safety conscious https://www.petrofac.com/en-gb/media/news/hasdrubal-gas-
 Can handle stress plant-contract-award-in-tunisia/
Major Duties/
Responsibilities: Civil Superintendent- Infrastructures –
05/2007 to 11/2007
 Engineering & construction Bonatti S.P.A., Saudi Arabia
support: Focal point between
engineering and construction

Sr. Civil Construction Manager– 03/2006 to 04/2007


 Materials: Material submittal, MARITIME INDUSTRIAL SURVICES CO. LTD. INC. (MIS)
database of material quantities, Qatar Petroleum (QP)/WOQOD.
Prepare the material procurement Heavy Fuel Oil (HFO) Bunkering Facility Project Ras Laffan
plan for the civil requirements and Qatar.
coordinate with the project
procurement manager and the
materials controller to ensure the
availability of the same, and
consumption record. Sr. Civil Supervisor – 12/2004 to 03/2006
Petrofac International Ltd.
LEAD Contracting & Trading .LTD.
Qatar.
https://www.lead-ae.com/Projects/details?id=4657d3df-89f2-
 Planning: Tracking progress of all 4d40-9aea-31f561fd20f8
civil activities, advice construction Qatar Petroleum (QP), Rag & Flare Mitigation Project for
team about ability and the the NGL-1, 2, 3 and 4 & Substation Mesaieed.
priorities.

 Quality assurance: Monitors the


on-site activities relating to
buildings and the civil engineering
infrastructure so as to ensure their
conformance with the client
requirements, in particular those
relating to health and safety, quality
and conformance with approved
construction documentation;
Prepares and follows up with non-
conformance notices, in particular
the on-site activities relating to the
resolution of non-conformances.

You might also like