Name of Sitel HQ Departn 2x210 MW Bakreswar TPP, Mp-3. Month : JULY' 2010 Total Score Achievable (with
1. Reconciliation
Name: Shri MIHIR SARKAR,Staff No.: 2980630. Details of achievement document, if any)
Pvt. Ltd.)
Measurement (% achieved)
Score Achieved
Executive Grade
Recommended
Reviewed
supporting
(%x20)
(JE-E4)
By(CM/HOD)
by (GM)
market. 4.99.2%
start logic at site level replacing NB2 relay. Conceptualising, the synchronising into confidence. as per requirement. protection feature has been implemented All the protection
Ckt which was not available in the protection 3. Erection & Commissioning (OSGI procuring additinal developing DCS interface of extension
AC/DC power cut feature in check synchro relays of whole HT/l T sWGRs for of the said relay at normal condition. of HT/lT SWGR protection logic of Ash Handling Package of HT power cable S. Establishment through PlC. of TAC HT motors by site modification for identification 6. Commissioning box. 7. Visited BHEl/Bhopal transport of critical materials and subsequent of the same to site. Also discussed and sorted out HT SWGR
1. During the course of E&C of HT & LT SWGR, cable package & illumination pkg
etc. human
safety
aspect
of safety eqpt. like half body harness to full body harness and when ensured ever a defaulter was found work, proper earthing of working goggles was strictly
2. During half section SWGR bus shutdown bus was strictly 3. Mandatory ensured. use of safety helmets,
4. Till date not a single case of lTI has been reported area of work.
of modules
the modules/components
with PEM and a long chase up to vendor M/s l& T for its after a long chase up wth as per site of power of
which was a long pending issue since around one and half years. by diverting huge quantity
3. Silo area MCC could be commissioned cables, fixing up of a transporter 4. Has spearheaded various activites.
& control cables from Korba site. Diversion job involved identifiction & obtaing clearance from customer. in spreading of "Hindi" among employees
of site by
I ElCB)
on synchronising
in HT/LT
SWGRs.
3. Developing
Cabling, customer
power management
G: GOOD:Upto 40% (from 0 to 8) VG: VERYGOOD:Upto 70% (from 9 to 14) EX: EXCEllENT:UPTO 100% (from 15 to 20)