ARCHITECTURAL:
A-1 PERSPECTIVE
VICINITY MAP CITY / MUNICIPALITY
SITE DEVELOPMENT PLAN
A1 FRONT ELEVATION-KITCHEN
LEFT ELEVATION-KITCHEN
ARCHITECTURAL:
RIGHT ELEVATION-KITCHEN
THISSITE CAINGLET
ROOF PLAN-KITCHEN
S 0º37' E,
34.27m
5.00m
EXISTINGROAD
S-1 GENERAL NOTES
PSD09038350
S-2 FOUNDATION PLAN-CR
SAM'S
LOT1C
N 38º W,
ROOF TRUSS PLAN-CR
19.90m
PORTO INOF
-7-
CUISINE
LOT1C
-1-A
- ROOF BEAM PLAN-CR
AND
SANITARY:
LOT1C
-1-B
-
S 0º37' E,
S-3 FOUNDATION PLAN-KITCHEN
18.71m
ARCEDE ROOF BEAM PLAN-KITCHEN
ORNAMENTAL
FISH ROOF TRUSS PLAN-KITCHEN
PUNT
A DR N 81º16' S-4 FOOTING & COLUMN DETAILS
E,20.31m N 81º16'
W, WALL FOOTING DETAILS
14.42m
CAINGLET AVE.
PUBLC
ILAND PLUMBING: ELECTRICAL:
MECHANICAL:
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
ENGR. RUSTAM JOLIGON
CIVIL ENGINEER CADD BY: ARCHITECTURAL
CONSTRUCTION OF MALE & FEMALE
178044 739 533 658 CR AND KITCHEN
KCCF-PCGAMI
CHECKED BY:
PERSPECTV
IS
ET
,IEDEVELOPMENTPLAN,
A-1
BRGY CAINGLET, KABASALAN, ZAMBOANGA BRGY CAINGLET, KABASALAN, ZAMBOANGA VCIN
ITIYMAP
7-08-2024 SIBUGAY, ZAMBOANGA PENINSULA
DATE :
SIBUGAY, ZAMBOANGA PENINSULA
A B C
8000
300
TOP OF FIREWALL
650
TOP OF ROOF BEAM
A B C CEILING LINE
3750
8000
2500
1000 3000 3000 1000
GROUND FFL
200
PROPERTY LINE NGL
100
W W
1 1
6 2 FRONT ELEVATION-CR
FEMALE CR
MALE CR
A 3 A2
3000
W W
1 1
4500
W W C B A
1 1
8000
2 D D 1000 6000 1000
300
1 1
1500
TOP OF FIREWALL
650
TOP OF ROOF BEAM
CEILING LINE
5 4
3750
2500
A 3 A 3
GROUND FFL
200
NGL
100
A2 SCALE: 1:75M.
3 REAR ELEVATION-CR
A2
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
ENGR. RUSTAM JOLIGON
CIVIL ENGINEER CADD BY: ARCHITECTURAL
CONSTRUCTION OF MALE & FEMALE
178044 739 533 658 CR AND KITCHEN
KCCF-PCGAMI
CHECKED BY: COMFORTROOMFLOORPLANLAYOUT,
FRONTELEVATOINC
-R,
A-2
BRGY CAINGLET, KABASALAN, ZAMBOANGA BRGY CAINGLET, KABASALAN, ZAMBOANGA REARELEVATO
INC
-R
7-08-2024 SIBUGAY, ZAMBOANGA PENINSULA
DATE :
SIBUGAY, ZAMBOANGA PENINSULA
A B C
8000
300
300
PROPERTY LINE
TOP OF FIREWALL TOP OF FIREWALL 1
650
650
3750
4500
2500
2500
ROOFN
IGSHEETGA
#2.4
2
GROUND FFL GROUND FFL
200
200
NGL NGL
100
100
250
4500 4500
7000
1 2 2 1 A B C
300
300
8000
300
650
650
TOP OF FIREWALL
3750
3750
650
SEE ROOF DETAIL TOP OF ROOF BEAM
975 975 975
2500
2500
CEILING LINE
975 975 975
3750
2500
200
200
100
100
GROUND FFL
3000 1500 1500 3000
200
NGL
4500 4500
100
4 CROSS SECTION-M CR 5 CROSS SECTION-F CR 6 LONGITUDINAL SECTION-CR
A3 SCALE: 1:100M. A3 SCALE: 1:100M. A3 SCALE: 1:100M.
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
ENGR. RUSTAM JOLIGON
CIVIL ENGINEER CADD BY: ARCHITECTURAL
CONSTRUCTION OF MALE & FEMALE
178044 739 533 658 CR AND KITCHEN
KCCF-PCGAMI
CHECKED BY: LEFTELEVATO
PLANC-R
INC
-RR,G
IHTELEVATO
C,ROSSSECTOINM-CR
INCRR ,OOFN
C,ROSSSECTO
IG
INF
-
A-3
BRGY CAINGLET, KABASALAN, ZAMBOANGA BRGY CAINGLET, KABASALAN, ZAMBOANGA CRLO
, NGTIUDN
IALSECTO
INC
-R
7-08-2024 SIBUGAY, ZAMBOANGA PENINSULA
DATE :
SIBUGAY, ZAMBOANGA PENINSULA
A 3
B
4000 A 5 A B
1315 2685
4000
1200 2800
PROPERTY LINE
300
1
TOP OF FIREWALL
4
650
TOP OF ROOF BEAM
KITCHEN A 5
CEILING LINE
4000
3885
3550
2500
Y LINE
2000
1200
PROPERT
Ref. GROUND FFL
2
100
W NGL
2
1 2 2 1
300
300
TOP OF FIREWALL TOP OF FIREWALL
650
650
3550
3550
2500
2500
GROUND FFL GROUND FFL
100
100
NGL NGL
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
ENGR. RUSTAM JOLIGON
CIVIL ENGINEER CADD BY: ARCHITECTURAL
CONSTRUCTION OF MALE & FEMALE
178044 739 533 658 CR AND KITCHEN
KCCF-PCGAMI
CHECKED BY: KTICHENPLANLAYOUT
F,RONTELEVATOINK
LEFTELEVATO
-TICHEN,
INK
-TICHEN
R,G
IHT
A-4
BRGY CAINGLET, KABASALAN, ZAMBOANGA BRGY CAINGLET, KABASALAN, ZAMBOANGA ELEVATOINK
-TICHEN
7-08-2024 SIBUGAY, ZAMBOANGA PENINSULA
DATE :
SIBUGAY, ZAMBOANGA PENINSULA
DOORS SCHEDULE
4000
800
PLAN
B A 1315 2685
50 50
900
4000 PROPERTY LINE
2800 1200
300 900
TOP OF FIREWALL
4000
3885
650
4500
CEILING LINE ELEVATION
2100
LINE
ROOFN
IGSHEETGA
#2.4
3550
PROPERTY
2500
500
500
GROUND FFL
DESIGNATION D
100
1
NGL
NO. OF SETS 2 SET
1200 2800
LOCATION C.R. ENTRANCE
4000
MATERIAL SOLID PANEL DOOR W/ 2"X4"
DESCRIPTION MAHOGANY WOOD JAMB &
DOOR KNOB SET
WINDOWS SCHEDULE
1 REAR ELEVATION-KITCHEN 2 ROOF PLAN-KITCHEN
A5 SCALE: 1:100M. A5 SCALE: 1:100M. PLAN 500
420 590
1200
590
A B
500
4000 420 1200
1 2 1200 2800
590 590
500
300
300
1200
ELEVATION
650
650
SEE ROOF DETAIL
1800
900
3550
3550
F. FLOOR LINE F. FLOOR LINE
2500
2500
DESIGNATION W W
1 2
NO. OF SETS
6 SET 1 SET
100
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
ENGR. RUSTAM JOLIGON
CIVIL ENGINEER CADD BY: ARCHITECTURAL
CONSTRUCTION OF MALE & FEMALE
178044 739 533 658 CR AND KITCHEN
KCCF-PCGAMI
CHECKED BY:
PLANK
-TICHENC
REARELEVATO
,ROSSSECTO
INA
INK
-TICHEN
-C,ROSSSECTOINB
-,
R,OOF A-5
BRGY CAINGLET, KABASALAN, ZAMBOANGA BRGY CAINGLET, KABASALAN, ZAMBOANGA DOOR&WN IDOWS
7-08-2024 SIBUGAY, ZAMBOANGA PENINSULA
DATE :
SIBUGAY, ZAMBOANGA PENINSULA
GENERAL: REINFORCING STEEL:
1.ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE. 1.STEEL REINFORCEMENT SHALL BE GRADE 230 IN ACCORDANCE WITH PNS STRUCTURAL NOTES
49.
2.DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHOULD BE READ OR
COMPUTED. ANY DISCREPANCIES FOUND ON THE WRITTEN DIMENSIONS 2.UNLESS APPROVED BY THE ENGINEER, WELDING OF REINFORCING BARS
SHOULD BE RAISED TO THE ATTENTION OF THE ENGINEER PRIOR TO SHALL NOT BE PERMITTED. 8.TABLE OF LAP SPLICES
EXECUTION OF THE WORK.
3.REINFORCING STEEL BARS MUST BE FREE FROM OIL, GREASE, LOOSE RUST, PARAMETERS
AT LEAST 200mm AT LEAST 200mm
3.ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH THE PROJECT LOOSE MILL SACK OR OTHER HARMFUL MATTER IMMEDIATELY BEFORE fc'=20.7 MPa fy=230 MPa
SPECIFICATIONS & OTHER PROJECT DOCUMENTS. POURING CONCRETE. BAR DIAMETER STANDARD TENSION SPLICE LENGTH (mm)*
A
(mm) HOOK (mm),ldh CLASS "A" CLASS "B"
- - LINTEL BEAM
4.LAP SPLICE SHALL COMPLY WITH ACI-318M-14 AND NSCP C101-15.
EARTHWORKS: 10 160 300 400
12 200 300 400
5.THE MINIMUM CLEAR COVER FOR REINFORCEMENTS SHALL BE AS
1.UNLESS NOTED OTHERWISE ALL FILL MATERIALS SHOULD BE SELECTED 16 260 400 520
FOLLOWS, UNLESS OTHERWISE SHOWN ON THE DRAWINGS:
FROM COMMONLY EXCAVATED MATERIAL WHICH ARE FREE FROM 20 320 500 650 B WINDOW
OPENING
ORGANIC AND HAZARDOUS MATERIALS AND GENERAL DEBRIS,FILL STRUCTURAL ELEMENTS CONCRETE COVER,mm 25 400 750 975 - -
MATERIALS SHALL BE INERT WELL GRADED AND GRANULAR MATERIAL WITH 28 450 840 1100
A MAXIMUM SIZE NOT EXCEEDING 75mm. FOOTING 75
* For top bars (more than 300mm of concrete placed below the
GROUND SLAB 40 horizontal reinforcement) multiply the above values by 1.3 FFL
FOUNDATION: SUSPENDED SLAB 20 C
9.FORMWORKS REMOVAL
1.IN ABSENCE OF SOIL INVESTIGATION REPORT, AND IN ACCORDNACE BEAMS STIRRUPS &
- -
40
WITH SECTION 304.2 OF NSCP 2015, THE ALLOWABLE BEARING CAPACITY COLUMN TIES MINIMUM TIME REQUIRED
STRUCTURAL ELEMENTS
USED FOR FOUNDATION IS 100 kPa. CONCRETE EXPOSED BEFORE REMOVAL
TO EARTH BUT POURED 50 1200>W<3400mm
FOOTING 24 HRS
2.UNIT WEIGHT OF SOIL CONSIDERED IS 18 kN/m3. AGAINST FORMS
SUSPENDED SLAB 21* DAYS CHB"t"
CONCRETE POURED
3.THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING DIRECTLY TO EARTH
75
COLUMNS 48 HRS
EXCAVATION HAVE BEEN COMPLETED TO CONFIRM THE DESIGN SOIL
BEARING CAPACITY. 6.STANDARD HOOKS: BEAMS SOFFIT FORMS 21* DAYS
CHB VERTICAL
REINFORCEMENT
BEND STRAIGHT
CONCRETE: TYPE OF STANDARD HOOK BAR SIZE,d
DIAMETER,D EXTENSION, lext
BEAMS SIDE FORMS 24 HRS
2 - 12mmØ
250 (min)
*IT CAN BE REMOVED AFTER A MINIMUM OF14 DAYS IF
3.THE CONCRETE DESIGN AND CONSTRUCTION WORKS ARE IN 90 DEGREE HOOK APPROVED BY THE ENGINEER
Ø10mm to Ø25mm 6d
ACCORDANCE WITH THE AMERICAN CONCRETE INSTITUTE (ACI 318M-14) Point at which 10mmØ STIRRUPS
AND THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP bar is developed MASONRY: AT 300mm ON CENTER
d
Ø28mm to Ø36mm 8d 12d
C101-15).
SCHEDULE OF STRUCT'L. CONCRETE D W<1200mm
lext
HORIZONTAL
VERTICALREINFORCEMENT
REINFORCEMENT
AT 28 DAYS COMPRESSIVE STRENGTH Ø40mm & Ø58mm 10d CHB"t"
GROUTED CELL
28-DAYS COMPRESSIVE
180 DEGREE HOOK HORIZONTAL
STRUCTURAL ELEMENTS STRENGTH (fc') Ø10mm to Ø25mm 6d SPACING
Point at which
FOOTING 3,000psi (20.70 MPa)
bar is developed
t(mm)
LARGER OF 4d & CHB VERTICAL
d
200(min)
SLAB ON FILL, RET. lext Ø40mm & Ø58mm 10d 1-12mmØ
WALLS, CONC. FOR 2,500 psi (17.24 MPa)
FENCE, LINTEL BEAMS SCHEDULE OF MASONRY WALL
& LINTEL COLUMNS
LEAN CONC. 1,500 psi (10.34 MPa)
7.STIRRUP & TIE HOOKS: REINFORCEMENT
t GROUTED
BEND STRAIGHT (mm)
HORIZONTAL VERTICAL
CELL
SECTION A
2.AGGREGATES SHALL BE CHEMICALLY INERT, STRONG, HARD AND TYPE OF STANDARD HOOK BAR SIZE,d DIA. SPACING DIA. SPACING
DIAMETER,D EXTENSION, lext
DURABLE, AND OF LIMITED POROSITY AND FREE FROM ADHERING 150 10 EVERY 3 LAYERS 10 600mm ALL CELLS
90 DEGREE HOOK LARGER OF 4d & 100 10 EVERY 3 LAYERS 10 600mm ALL CELLS
COATINGS AND ORGANIC OR OTHER IMPURITIES THAT MAY CAUSE Ø10mm to Ø16mm 4d 1 - 16mmØ
HORIZONTAL CHB
75mm
CORROSION OF THE REINFORCEMENT OR MAY IMPAIR THE STRENGTH AND
d
REINFORCEMENT
TYPICAL DOOR/WINDOW CHB"t"
DURABILITY OF THE CONCRETE. D OPENING & LINTEL BEAM DETAIL
lext
DOOR
LARGER OF 6d & OPENING
OTHER APPROVED METHOD. D 65mm B CHB"t"
lext Ø20mm to Ø25mm
5.TESTING OF CONCRETE SHALL CONSIST OF COMPRESSIVE TESTS OF 6d - -
MOLDED CONCRETE CYLINDERS FOR STRENGTH AND SLUMP TESTS FOR SECTION C
CONSISTENCY. FFL
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
ENGR. RUSTAM JOLIGON
CIVIL ENGINEER CADD BY: STRUCTURAL
CONSTRUCTION OF MALE & FEMALE
178044 739 533 658 CR AND KITCHEN
KCCF-PCGAMI
CHECKED BY: STRUCTURALGENERALNOTES S-1
7-08-2024 BRGY CAINGLET, KABASALAN, ZAMBOANGA BRGY CAINGLET, KABASALAN, ZAMBOANGA
SIBUGAY, ZAMBOANGA PENINSULA
DATE :
SIBUGAY, ZAMBOANGA PENINSULA
A B C A B C
8000 8000
1000 3000 3000 1000 1000 3000 3000 1000
WF-2 WF-2 1
1
F2C1 F2C1 F2C1
TRUSS 1
TRUSS 1
TRUSS 1
1745
3000
WF-1
3000
WF-1
WF-1
4500
WF-1 WF-1 2
2
1500
F1C1 F1C1 F1C1
0
1.0MTH.K C.ONCRETESLAB
W TIH 10mmØ RENF
B.ARS
250
@ 0
4.0MO .C
.BOTHWAYS
6000
SCHEDULE OF COLUMNS
3000 3000 DIMENSION REINFORCEMENT
B-1 B-1 LEVEL MARK SECTION TIES
B H MAIN BAR
DIAMETER SET
GROUND H
C1 230 230 4-16mm Ø 10mmØ 1
FLOOR
3000
B
B-1
B-1
B-1
B-1 B-1
SCHEDULE OF COLUMN FOOTINGS
DIMENSIONS REINFORCEMENTS
MARK WIDTH LENGTH THICK. DEPTH BOTTOM BARS REMARKS
(W) (L) (T) (D) ALONG "W" ALONG "L"
3 ROOF BEAM PLAN-CR F1 800 800 200 1000 7-16Ø 7-16Ø ISOLATED FOOTING
F2 800 800 200 1000 7-16Ø 7-12Ø ECCENTRIC FOOTING
S2 SCALE: 1:75M.
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
ENGR. RUSTAM JOLIGON
CIVIL ENGINEER CADD BY: STRUCTURAL
CONSTRUCTION OF MALE & FEMALE
178044 739 533 658 CR AND KITCHEN
KCCF-PCGAMI
CHECKED BY: FOUNDATOINPLANC
-R,
ROOFTRUSSPLANC
-R
S-2
7-08-2024 BRGY CAINGLET, KABASALAN, ZAMBOANGA BRGY CAINGLET, KABASALAN, ZAMBOANGA ROOFBEAMPLANC-R
SIBUGAY, ZAMBOANGA PENINSULA
DATE :
SIBUGAY, ZAMBOANGA PENINSULA
A B A B
2685
4000
4000
B-1
1315 2685
1315 2685
1
WF-2
1
4000
B-1
F2C1 F2C1
TRUSS 1
TRUSS 1
.ARS
SLAB
4000
.BOTHWAYS
3885
B
C.ONCRETE
RENF
4000
4500
WF-1
10mmØ
O .C
.K
4.0M
TH
TIH
1.0M
@ 0
W
B-1
0
2000
WF-1
2800
WF-1
2
500
500
2 F1C1 F1C1
250
4000 4000
S3 SCALE: 1:75M.
1 FOUNDATION PLAN-KITCHEN
S3 SCALE: 1:75M. 3 ROOF TRUSS PLAN-KITCHEN
S3 SCALE: 1:75M.
4 BEAM DETAILS
S3 N. T. S.
B-1
L/4 L/2 L/4
300
300
REBARS (BOTTONBARS) REBARS (BOTTONBARS)
SUPPORT MID-SPAN
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
ENGR. RUSTAM JOLIGON
CIVIL ENGINEER CADD BY: STRUCTURAL
CONSTRUCTION OF MALE & FEMALE
178044 739 533 658 CR AND KITCHEN
KCCF-PCGAMI
CHECKED BY: FOUNDATO INPLANK
ROOFBEAMPLANK
-TICHEN
-TICHEN,
S-3
7-08-2024 BRGY CAINGLET, KABASALAN, ZAMBOANGA BRGY CAINGLET, KABASALAN, ZAMBOANGA ROOFTRUSSPLANK
-TICHEN
B,EAMDETALIS
SIBUGAY, ZAMBOANGA PENINSULA
DATE :
SIBUGAY, ZAMBOANGA PENINSULA
800 4-16mmØ COLUMN BARS
10mmØLATERALTE IS
285 230 285 SPACE@3-503,-1003,-150
REST200mm
NATURAL GROUND LINE
285
250
7-16mmØ FOOTING BARS
800
ON BOTHWAYS
800
230
200
285
100
SECTION F1C1
400
400
4-16mmØ COLUMN BARS
800
10mmØLATERALTE IS PLAN
SPACE@3-503,-1003,-150
100 200
100 200
230 570
REST200mm
NATURAL GROUND LINE
285
WF-1 WF-2
7-16mmØ FOOTING BARS
800
ON BOTHWAYS
800
230
10mmØLATERALTE IS
GRAVEL BEDDING 100mm THK
SPACE@3-503,-1003,-150
REST200mm
F2C1
100
SECTION F2C1
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
ENGR. RUSTAM JOLIGON
CIVIL ENGINEER CADD BY: STRUCTURAL
CONSTRUCTION OF MALE & FEMALE
178044 739 533 658 CR AND KITCHEN
KCCF-PCGAMI
CHECKED BY: FOOTN
IGANDCOLUMNDETALIS
W
, ALLFOOTN
IG
DETALIS
S-4
7-08-2024 BRGY CAINGLET, KABASALAN, ZAMBOANGA BRGY CAINGLET, KABASALAN, ZAMBOANGA
SIBUGAY, ZAMBOANGA PENINSULA
DATE :
SIBUGAY, ZAMBOANGA PENINSULA
GENERAL NOTES: A B C
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TO THE
PROVISIONS OF THE PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING CODE
& THE RULES AND REGULATIONS OF THE PROVINCE.
2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS. 1
THE ENGINEER/ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY
FOUND THEREIN. D
TO
P
N
R
EØ
P
A
VIG
C
"3E V
M
3. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. ANY RELOCATIONS REQ'D. GV WM1/2"Ø PVC PIPE WATER LINE LAV. LAV. CONNECT TO KITCHEN
WC
FOR PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF WC WC
THE ARCHITECT OR ENGINEER. CO
FD FD FD FD
CO
4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH LAV. LAV.
AND INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURAL AS VERIFIED WC WC
BY THE CONTRACTOR. FD
5. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1% UNLESS OTHERWISE FD
VIC
PEØ
P "3
MU MU
VIC
PEØ
P "3
SPECIFIED. V WC V
F
6. SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS.
2
7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE. COORDINATE THE PEØ
P
VIC
"4 PEØ
P
VIC
"4
WORKS THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE
PRO
TA
SO
C
N
P
EK
Ø
P
V
TIC
"4
8. ALL WATER PIPE AND WATER TANKS SHALL BE THOROUGHLY FLUSHED AND DIS-
INDECTED WITH LIQUID CHLORINE OR HYPOCHLORITE SOLUTION.
9. ALL WATER PIPES SHALL BE HYDROSTATICALLY TESTED TO AT LEAST 1-1/2 OF THE
DESIGNED WORKING PRESSURE OF THE SYSTEM.
1 PLUMBING PLAN LAYOUT-CR
10. ALL SANITARY AND STORM DRAINAGE PIPES SHALL BE HYDROSTATISTACALLY P1
TESTED TO AT LEAST 3.0 M. HEAD TO ENSURE THAT THE SYSTEM ARE WATER TIGHT.
11. ALL PIPES DIMENSIONS REFER TO INSIDE DIAMETER.
A B
SEWER LINE
WATER LINE
1
D
TO
P
N
R
EØ
P
A
VIG
C
"3E
WC WATER CLOSET
LAV. LAVATORY
VSTR V VENT STACK THRU ROOF KS
F FAUCET
FD FLOOR DRAIN
KS KITCHEN SINK KS
CO CLEAN OUT
ST SEPTIC TANK 2
GV GATE VALVE
WM M WATER METER
2 PLUMBING PLAN LAYOUT-KITCHEN
P1
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.
1000
4"ØPVC MH 4"ØPVC
INLET MH OUTLET
SLAB STOP VALVE
STOP VALVE FINISH FLOOR LINE
0.85
0.60
SLOPE
4"ØPVC
OUTLET
1500
CLAM 12mmØ HORZ. BARS BARS
@0.60M. O.C DIGESTIVE CHAMBER
1/2"Ø PPR WATER PIPE
HOSE
12mmØ VERT. BARS AT
EVERY THIRD LAYER OF 4" CHB
5" THK. WALL
GRAVEL
0.60
12mmØ BARS
@0.20M. O.C B.W
5" THK. WALL
200
1/2"Ø PPR WATER PIPE
(ABOVE GROUND)
SECTION
1/2"Ø PPR WATER PIPE
(UNDER GROUND)
(TYPICAL DESIGN)
PROJECT TITLE AND LOCATION: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SHEET NO.