Manesar Background
Manesar Background
Manesar Background
Go to Content Page
Overview
City Overview
Integrated township of 4500+ acres, a prominent commercial and industrial
Manesar hub with upcoming residential developments
Integrated Township
City at a Glance
Over 4.5 Lakhs Job Increasing Plotted Connected via NH-48 &
Housing Supply KMP Expressway
Its proximity to the burgeoning city of Gurugram has in recent years EMPLOYMENT POTENTIAL: The total employment potential at
caused its character and demographics to change dramatically. Manesar is 4,69,037 people.
Location
Subject Site Location
Upcoming Location: One of the rare location surrounded by the green buffers
and Aravallis. Connected to Gurgaon city yet away from hustle bustle.
Location
The Subject Site is located in the South-Western Part of Gurgaon Manesar
Urban Complex, directly connected by NH-48 to Delhi
To Dwarka
To Delhi
Subject site region
lies in Proximity of
Subject Site
DMIC on western
Dedicated Freight
Corridor
To Kundli
One of the Fastest
growing suburbs To Jhajjar
of NCR
• Subject site is To Faridabad
located near the High Growth Location of GMUC Subject Site
booming town in
SPR
Manesar-Bawal • Manesar presently caters to the one of the
Investment region largest supply of Industrial space in NCR
region
• Estimated value of
• High influx of the migrant working population To Pataudi
output in Haryana
has led to the sustained housing demand in N
sub region of DMIC
the area, particularly for rental
is expected to grow
accommodations. To Sohna
15 times over 30
• Immense potential with a series of large-
years period (2010 –
scale infrastructure projects lined up in the
2040) To Aligarh
vicinity.
To Jaipur
Regional Connectivity
Connectivity
Multiple modes of transportation are just 30-40 mins away, accessible
through seamless connectivity via NH 48 and Pataudi Road.
Road
KMP Expressway: Travel Time : 8 mins | Travel Distance : 3 km
NH-352W : Travel Time : 7 mins | Travel Distance : 3.5 km
IGI Airport
Air
Travel Time: 50 – 55 min | Travel Distance: 42 Km
Rail
Patli Railway Station (Nearest)
Travel Time: 20 – 30 min | Travel Distance: 10 Km
Subject
Site Gurugram ISBT
Travel Time: 40 – 42 min | Travel Distance: 23 Km
Bus
Upcoming Kherki Dhaula ISBT
Travel Time: 20 – 22 min | Travel Distance: 13 Km
Metro
Travel Time: 40 – 42 min | Travel Distance: 23 Km
Rapid Metro : Sector 56 Metro Station
Travel Time: 20 – 22 min | Travel Distance: 13 Km
Hero Honda
Chowk
From Hero Honda Chowk to Subject Site
Key Takeaways
Average Travel Time of 20- Subject Site in close
Better connectivity with
30 mins with Travel proximity to Manesar
development of internal
Distance of approx. 14-18 Clover Leaf Exit at KMP
sector road of manesar.
kms Expressway
Upcoming Transit Infrastructure
Proposed infrastructure initiative close to Subject Site
Well Connected through upcoming infrastructure such as RRTS, MRTS, MMTS. The
upcoming developments will reduce the travel time by 60%.
Developed
Phase- I, II, III and IV
Phasing
Year of Area
Phases
Establishment (Acres)
Phase 1 1999 1,748
Phase 2 2003 180
Phase 3 2004 598
Phase 4 2004 662
Phase 5 2013 665
Phase 6 2023* 162
Transport Hub 2008 467
Warehousing - 285
Development Quantum
Key Takeaways
Freehold Ownership is
Manesar is developed by Further development and Residential Plots
permitted in the upcoming Industrial
HSIIDC with optimum Expansion of Township is
infrastructure facilities ongoing.
future residential ~ 2,400 Units ~ 1,700 Units
developments
6. Context Creation
Defined Catchment Zone
An inclusive micro-market with varied range of products from mid segment
to ultra-luxury
Catchment Zone
• Similar catchment profile
• Capital price within close range of Manesar upcoming developments Apartment Complex & Ind. Floor Min - Max
• Travel distance from Kherki Daula Toll to Manesar is 4-5 kms
Prevalent Configuration 2 BHK
2.5 / 3 / 3.5 / 4 / 4.5 4.5 BHK
BHK
Launch
# Project Name Status Typology
Year
1 True Bodh 78 Pre-Launch Apartment
Average Price 2 Sobha Aranya Launched Apartment
10,500 – 11,500 3 Conscient Parq Launched Apartment
INR per Sq.Ft. 4 M3M Golf Hills Phase 2 Launched Apartment
5 Ashiana Amarah (Ph-3) 2024 Launched Apartment
6 Sangam Southwest Residency Pre-Launch Plotted
1 Average Price 7 SS Group – (Sector 90) Pre-Launch Apartment
12,000 – 14,000 8 JMS Phase 1 – (Sector 95) Pre-Launch Apartment
INR per Sq.Ft.
9 JMS The Pearl Launched Plotted
10 Godrej Arista (101 Ph-2) Launched Apartment
Average Price 11 GLF Palm Meadows Launched Plotted
Launched/Pre-Launch in 2024
N Launched in 2023
6. Context Creation
Prominent Project Details (Launched Project Since January’2023)
Pocket 1
Site Area Total % No. of Units Size Launch Price Current Price Ticket Price
Apartment
Pocket 2
Plotted
Site Area Total % No. of Units Size Launch Price Current Price Ticket Price
Project Name Developer Sector Launch Status No. of floors Configuration
(Acres) Units Absorp. towers (sq.ft.) (INR/sq.ft.) (INR/sq.ft.) (INR Cr.)
GLS Avenue (Ph-2)* GLS Infra 81 Jun-23 Launched 1.8 G+14 220 100% 2 1/2 335-643 5,000 5,000 0.42 - 0.80
Pocket 3
Site Area Total % No. of Units Size Launch Price Current Price Ticket Price
Project Name Developer Sector Launch Status No. of floors Configuration
(Acres) Units Absorp. towers (sq.ft.) (INR/sq.ft.) (INR/sq.ft.) (INR Cr.)
Bodh 78* True Habitat 78 - Pre-Launch 4.3 S+14 / S+18 633 50% 6 2/3 600-1349 6,000 6,000 0.75 - 1.69
Apartment
Parq Conscient 80 May-24 Launched 5.6 G+24 to 35 448 50% 4 3/3.5/4.5 2000-2800 15,500 / 15,900 15,500 / 15,900 3.10 – 4.45
Golf Hills (Ph-2) M3M India 79 Apr-24 Launched 14.64 G+36 590 70% 5 3/3.5/4.5/P 1668-8120 14,750 14,750/15,100 2.52 – 12.26
Sobha Aranya (Ph-1) Sobha 80 Apr-24 Launched 14.81 G+42 520 50% 5 3.5/4/4.5 2836-4285 25,000 25,000 7.09 – 10.71
Godrej Arista Godrej 79 Oct-23 Launched 2.84 G+13 182 95% 3 2/2.5/3/3.5 1479–2506 10,500 13,000 1.92 – 3.26
Mapsko Icon Mapsko 79 Apr-23 UC 2.13 G+26 53 100% 1 4 3500 8,990 12,000 4.2
Golf Hills (Ph-1) M3M 79 Apr-23 UC 20.05 G+30 1295 95% 11 2/2.5/3.5/4.5/P 1420–7876 8,999 14,750/15,100 2.14 – 11.89
Ompee Towers Ompee M1 Aug-23 Launched 0.98 S+12 60 100% 1 3 2013-2210 7,000 7,000
Plotted
Project Name Developer Sector Launch Status Site Area (Acres) No. of floors Total Units % Absorp. Units Size (sq.yd.) Launch Price (INR/sq.yd.) Current Price (INR/sq.yd.) Ticket Price (INR Cr.)
Palm Meadows GLF 78 Oct-23 Launched 5.01 B+G+3 95 95% 148 - 179 1,35,000 1,35,000 1.99 – 2.42
Mapsko Apsr Hills Mapsko 78 Jan-23 UC 7.94 B+G+3 120 100% 104 – 179 1,18,800 1,21,500 1.26 - 2.18
Launch Site Area No. of Total No. of Units Size Launch Price Current Price Ticket Price (INR
Project Name Developer Sector Status % Absorption Configuration
Floors
Low High
Apartment Complex & Ind. Floor Apartment Complex & Ind. Floor
Prevalent Configuration Prevalent Configuration
2/ 2.5 / 3.5 3 / 3.5 / 4 / 4.5
BHK BHK
Average Price
No prominent developments in Past 2 Average Price
10,500 – 11,500 years 15,000 – 16,000
INR per Sq.Ft. Only one Affordable project INR per Sq.Ft.
Average Ticket Price in launched since Jan’23 Average Ticket Price
1.50 – 2.50 2.50 – 4.50
INR Crores. INR Crores.
Average Resale Price for mid to
Plotted Premium Segment 12000 - 14000 Plotted
Average Unit Size Average Unit Size
110 - 179 110 - 179
Sq.Yd. Sq.Yd.
Average Price Average Price
80,000 – 90,000 1,20,000 – 1,35,000
INR per Sq.Yd. INR per Sq.Yd.
Average Ticket Price Average Ticket Price
1.00 – 1.50 1.50 – 2.50
INR Crores. INR Crores.
6. Residential Profile
Characteristics for varied pockets in the catchment zone
To Delhi
Immense Development Potential due to unavailability of premium
To Delhi
developments in the Vicinity at affordable price.
To Delhi
To Kundli Premium Projects Regular Projects Below Average Projects
Average Price Above INR 14,500 psf Between INR Below INR 10,000 psf
Providing high end 10,000-14,500 psf Mid Segment projects with
10,500 – 11,500 amenities and facilities basic amenities and
INR per Sq.Ft.
facilities
1
To Faridabad
3
Target Product to Attract Buyer
Lower Price Better Amenities
than than
Pocket 3 Pocket 1 & 2
Pocket 1
N Pocket 2
To Palwal To Jaipur
Residential
600+ Apartments | 900+ Plots
The State-of-the-art Club & Facilities
Commercial
8+ Acres of Commercial Area
Retail | High Street
Key Takeaways
Employment 60+ Acres
Hub Of Green and White Industries
GREEN AREA
20+ Acres of Green
N for approx. 15,000+ residents