1.

BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main


Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


DOCUMENT LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


DOCUMENT LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

100
7 4

7
PANEL BOARD NAME SELDB-4 (00BNA04)
MANUFACTURING DATE 06 MAY 2024
RATED VOLTAGE 400/230 VAC
RATED FREQUENCY 50 Hz
IP 41 INDOOR TYPE 1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.

63
2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
INTERRUPTING CAPACITY 25 kA FOR 1 SEC.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
REFERENCE STANDARD IEC 61439-1 (FORM 2b) AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE
PT. LINGGA MEKAR ENGINEERING
MECHANICAL ELECTRICAL - FACTORY AUTOMATION - PANEL MAKER
MADE IN INDONESIA

7
0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


NAME PLATE
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
No. DEVICE CODE NAME OF COMPONENT TYPE SPECIFICATION MAKER QUANTITY 4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
PANEL : SUB LIGHTING DISTRIBUTION BOARD 4 (SELDB-4) 6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

INCOMING SECTION

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

FEEDER SECTION
PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


EQUIPMENT LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
No. DEVICE CODE NAME OF COMPONENT TYPE SPECIFICATION MAKER QUANTITY 4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

PERIMETER/OUTDOOR LIGHTING SECTION

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


EQUIPMENT LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
No. NAME PLATE NO. NAME OF COMPONENT LEGEND SIZE (MM) QUANTITY 5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING
PANEL : SUB EMERGENCY LIGHTING DISTRIBUTION BOARD 4 (SELDB-4) DOOR SECTION

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


NAME PLATE LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)

No. NAME PLATE NO. NAME OF COMPONENT LEGEND SIZE (MM) QUANTITY 4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
PANEL : SUB EMERGENCY LIGHTING DISTRIBUTION BOARD 4 (SELDB-4) INCOMING & FEEDER SECTION
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


NAME PLATE LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)

No. NAME PLATE NO. NAME OF COMPONENT LEGEND SIZE (MM) QUANTITY 4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
PANEL : SUB EMERGENCY LIGHTING DISTRIBUTION BOARD 4 (SELDB-4) INCOMING & FEEDER SECTION
WORKSHOP & WAREHOUSE BUILDING

PANEL : SUB EMERGENCY LIGHTING DISTRIBUTION BOARD 4 (SELDB-4) CONTROL SECTION

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


NAME PLATE LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 3/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)

No. NAME PLATE NO. NAME OF COMPONENT LEGEND SIZE (MM) QUANTITY 4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
PANEL : SUB EMERGENCY LIGHTING DISTRIBUTION BOARD 4 (SELDB-4) PERIMETER PHOTOCELL SECTION
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


NAME PLATE LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 4/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


PANEL SPECIFICATION
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

600

70 120
SELDB-4 (00BNA04)

60 60 80 60 60
L1 L2 L3 L4 L5 L6

FUSE
L7 L8 L9 HOLDER
(CONTAINS NP-1
F1 - F6)

NP-2, NP-3, NP-4,

150
NP-5, NP-6, NP-7 1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.
PERIMETER/OUTDOOR LIGHTING

2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY


NP-8, NP-9,
MAN - OFF - AUTO

AT SITE TO SUIT SITE CONDITIONS.


110 NP-10 3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
NP-11
900

PB1 AS PER SITE CONDITIONS.


5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
o NP-12 CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
P 6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

NP-13

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


LAYOUT PANEL DRAWING
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

600
540 600
170 280

130
130
1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.
2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
900

840

900
AS PER SITE CONDITIONS.

130
iCT iCT iCT
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
25A 25A 25A
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

250

CABLE
SUPPORT

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


LAYOUT PANEL DRAWING
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

230 20 230 20 230 20

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
900

900

900
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE
ACRYLIC
COVER
CABLE
SUPPORT

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


LAYOUT PANEL DRAWING
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 3/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

600
230

600 1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
500 3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED

460 AS PER SITE CONDITIONS.


5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

115
230
130
90
45 3030303030303030303030 45
20

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


LAYOUT PANEL DRAWING
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 4/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

SW3 SW4 SW28 SW21 SW35

EXIT

EXIT
E
E E E
EXIT

E E E
E E EXIT
E E

E
EXIT
0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG
SW15 SW40 SW25 EXIT EXIT
SW10
EXIT C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG
SW32
EXIT B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG
E E
EXIT
E E A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG
E EXIT
SW38 REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED
E E
SW18 EXIT
E

E
PT AMMAN MINERAL NUSA TENGGARA
SW39
E

SW7
TATA CONSULTING ENGINEERS LIMITED
E
EPC CONSORTIUM :

E Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


SINGLE LINE DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


THREE LINE DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/3
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


THREE LINE DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/3
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


THREE LINE DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 3/3
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


CONTROL DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


CONTROL DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


LAYOUT TERMINAL BLOCK
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6812 LIGHTING & POWER SOCKET LAYOUT-
WORKSHOP & WAREHOUSE BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-4)


PILOT LAMP COLOUR
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1